ML033390269

From kanterella
Jump to navigation Jump to search

Technical Specification, Extend the Surveillance Interval for the Train B Memories Test Portion of the Actuation Logic Test
ML033390269
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/03/2003
From:
NRC/NRR/DLPM/LPD2
To:
References
TAC MC1256
Download: ML033390269 (8)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 108 FACILITY OPERATING LICENSE NO. NPF-81 DOCKET NO. 50-425 Replace the following pages of the Appendix A Technical Specifications and associated Bases with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 3.3.1-10 3.3.1-10 3.3.1-bOa


3.3.1-lOb 3.3.2-7 3.3.2-7


B 3.3.1-57a


B 3.3.1-57b B 3.3.2-46 B 3.3.2-46

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.4 ------------ NOTE - ---------------------

This Surveillance must be performed on the reactor trip bypass breaker prior to placing the bypass breaker in service.

Perform TADOT. 31 days on a STAGGERED TEST BASIS SR 3.3.1.5 -----------------------------NOTE --------------------

The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the test of the Power Range Block of the Source Range Neutron Flux Trip Block for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.

Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.1.6 -------------------------- NOTES---- --- ------------

1. Not required to be performed until 7 days after THERMAL POWER is Ž 75% RTP.
2. Neutron detectors are excluded from CHANNEL CALIBRATION.

Calibrate excore channels to agree with incore 92 EFPD detector measurements.

(continued)

Vogt.le Unit 2 3.3.1 -10 Amendment No. 108 (Unit 2)

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY I.

SR 3.3.1.7 ---------------------------- NOTES--------------------------

1. For the Source Range Instrumentation this surveillance shall include verification that interlocks P-6 and P-1 0 are in their required state for existing unit conditions.
2. Not required to be performed for Source Range Instrumentation prior to entering MODE 3 from MODE 2 until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after entry into MODE 3.

Perform COT. 92 days (continued)

Vogtle Unit 2 3.3.11-1 Oa Amendment No. 108 (Unilt 2)

RTS Instrumentation 3.3.1 This page intentionally left blank.

Vogtle Unit 2 3.3.1 -1Ob Amendment No. 108 (Unit 2)

ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS

-- . ---------------------------------NOTE ---------------------

Refer to Table 3.3.2-1 to determine which SRs apply for each ESFAS Function.

SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 -------- NOTE--------------------------

The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the portions of the ACTUATION LOCIC TEST for Feedwater Isolation on P14 or SI that pass through the memories circuits for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.

Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.3 Perform MASTER RELAY TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.4 Perform COT. 92 days SR 3.3.2.5 Perform SLAVE RELAY TEST. 18 months SR 3.3.2.6 ------ - -- - -------- NOTE---------------------------

Verification of setpoint not required for manual initiation functions.

Perform TADOT. 18 months (continued)

Vogtle Unit 2 3.3.2-7 Amendment No. 108 (Unit 2)

RTS Instrumentation B 3.3.1 BASES SURVEILLANCE SR 3.3.1.5 (continued)

REQUIREMENTS SR 3.3.1.5 is modified by the following Note: The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the test of the Power Range Block of the Source Range Neutron Flux Trip Block for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.

(continued)

Vogtle Units 1 and 2 B 3.3.1-57a Rev. 0

RTS Instrumentation B 3.3.1 BASES (continued)

This page intentionally left blank.

(continued)

Vogtle Units 1 and 2 B 3.3.1-57b Rev. 0

ESFAS Instrumentation B 3.3.2 BASES SURVEILLANCE SR 3.3.2.1 (continued)

REQUIREMENTS channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between the two instrument channels could be an indication of excessive instrument drift in one of the channels or of something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.

Agreement criteria are determined by the unit staff, based on a combination of the channel instrument uncertainties, including indication and reliability. If a channel is outside the criteria, it may be an indication that the sensor or the signal processing equipment has drifted outside its limit.

The Frequency is based on operating experience that demonstrates channel failure is rare. The CHANNEL CHECK supplements less formal, but more frequent, checks of channels during normal operational use of the displays associated with the LCO required channels.

SR 3.3.2.2 SR 3.3.2.2 is the performance of an ACTUATION LOGIC TEST.

The SSPS is tested every 31 days on a STAGGERED TEST BASIS, using the semiautomatic tester. The train being tested is placed in the bypass condition, thus preventing inadvertent actuation. Through the semiautomatic tester, all possible logic combinations, with and without applicable permissives, are tested for each protection function. In addition, the master relay coil is pulse tested for continuity. This verifies that the logic modules are OPERABLE and that there is an Intact voltage signal path to the master relay coils. The Frequency of every 31 days on a STAGGERED TEST BASIS is adequate. It is based on industry operating experience, considering instrument reliability and operating history data.

SR 3.3.2.2 is modified by the following Note: The surveillance interval for the Memories Test portion of the ACTUATION LOGIC TEST and the portions of the ACTUATION LOGIC TEST for Feedwater Isolation on P14 or Si that pass through the memories circuits for the Unit 2 Train B SSPS can be extended to the Unit 2 end-of-cycle 10 refueling outage or the next Unit 2 shutdown to MODE 5, whichever comes first.

(continued)

_.... Units I and 2 Vnrtfl B 3.3.246 Rev. 1