MONTHYEARML0414104452004-04-27027 April 2004 During Unpacking of Boxes for Palo Verde I SG I at Ansaldo Plant It Was Revealed That Some Tubes Had Been Damaged by Screws During Packing in Sandviken. During Sandvik Reinspection of Boxes at the Ansaldo Plant, Further Damaged Tubes Were F Project stage: Request ML0425702862004-09-10010 September 2004 Summary of Telephone Conference with TVA Re Sequoyah Unit 1 Preservice Steam Generator Tube Inspections Project stage: Other ML0425702292004-09-10010 September 2004 Summary of Meeting with Tennessee Valley Authority Regarding Potential Fabrication Damage to Steam Generator Tubes at Sequoyah, Unit 1 Project stage: Meeting ML0501901092005-01-16016 January 2005 1/16/05, DC Cook - Tech Specs - Issuance of Emergency Amendment Regarding One-Time Allowed Outage Time Extension for West Centrifugal Charging Pump Project stage: Approval ML0501807372005-01-16016 January 2005 1/16/05, DC Cook - Issuance of Emergency Amendment One-Time Allowed Outage Time Extension for West Centrifugal Charging Pump Project stage: Approval 2004-09-10
[Table View] |
During Unpacking of Boxes for Palo Verde I SG I at Ansaldo Plant It Was Revealed That Some Tubes Had Been Damaged by Screws During Packing in Sandviken. During Sandvik Reinspection of Boxes at the Ansaldo Plant, Further Damaged Tubes Were FML041410445 |
Person / Time |
---|
Site: |
Palo Verde |
---|
Issue date: |
04/27/2004 |
---|
From: |
Lund P SANDVIK Special Metals Corp |
---|
To: |
Office of Nuclear Reactor Regulation |
---|
References |
---|
381-00502/00503, 4700030516, PX-SPV-20-AESC001 Rev 1 DDR 6301, Rev 0 |
Download: ML041410445 (1) |
|
|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML19323C9712019-11-15015 November 2019 Interim 10 CFR 21 Report for Masoneilan Model 8005N Transducer ML19304B6072019-10-31031 October 2019 Written Defect Notification for GE-Hitachi Stationary Primary Contact Finger Q0114C5382P002 ML19261A1942019-09-0606 September 2019 Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18270A3352018-09-26026 September 2018 Interim 10 CFR 21 Report for General Electric Hitachi (GEH) Relay Contact Cartridge DJ148C6159P001 ML17188A4222017-06-26026 June 2017 Itt Enidine, Inc - Part 21 - Potential Transducer Component Defect ML17124A7342017-05-0404 May 2017 Final Part 21 Report for General Electric Hitachi Model AKR-2BE- 50 Breaker ML17101A3642017-04-0707 April 2017 Part 21 - Circuit Breaker Defect Discovered During Current Injection Testing ML16344A1182016-12-0909 December 2016 Interim 10 CFR 21 Report for General Electric Hitachi Model AKR-2BE-50 Breaker ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML13213A2832013-07-26026 July 2013 Closure of Part 21 Interim Report for Flowserve Four Inch Regulating Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML12319A4732012-11-0909 November 2012 Interim Part 21 Report for Flowserve Four Inch Regulating Value ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0414104452004-04-27027 April 2004 During Unpacking of Boxes for Palo Verde I SG I at Ansaldo Plant It Was Revealed That Some Tubes Had Been Damaged by Screws During Packing in Sandviken. During Sandvik Reinspection of Boxes at the Ansaldo Plant, Further Damaged Tubes Were F ML0320500522003-07-11011 July 2003 Response to NRC Letter Regarding Westinghouse Part 21 Reviews 2019-09-06
[Table view] |
Text
~i QUALITY ASSURANCE DOCUMENT DEVIATION DISPOSITION REQUEST Manufacturer Material Report No AB Sandvik Materials Technology Steam Generator Tubes DDR 6301 Sandvik Order No Size Rev No 381-00502/00503 19.05 x 1.07 mm 0 Purchaser Sandvik Grade Page of Ansaldo Sanicro 69 1 1 Purchase Order No Grade Sandvik Quality Plan 4700030516 Alloy 690 QP 63 Rev 2 Specification Project Sandvik Procedure PX-SPV-20-AESCOOI Rev I Palo Verde I CP 6344 Rev 6 Deviation: During unpacking of boxes for Palo Verde I SG I at the Ansaldo plant it was revealed that some tubes had been damaged by screws during packing in Sandviken. During Sandvik reinspection of boxes at the Ansaldo plant, further damaged tubes were found.
All damaged tubes are listed below:
Row No Column No Tube No Box No 41 146 3002 7 49 144 5501 9 55 90 975 9 71 88 63459 11 95 24 64899 13 103 130 64374 13 Cause for deviation: The completion of the boxes was not performed in the correct way as intended in CP 6344 Rev 2. Even though the personnel were informed about the danger of not inserting the screws at the correct place and in a correct angle, some persons did not perform a correct assembly of the boxes. Root cause: Human error.
Corrective Action: All 6 tubes will be replaced acc. to QP 63 and all applicable Control Procedures, i.e. the requirements of all Ansaldo specifications will be met.
Preventive Action: For the current packing of Palo Verde I SG 2, the following actions have been taken. The 4 first actions have also been incorporated in CP 6344 Rev 6.
- Only qualified persons are allowed to use screws to finish the boxes.
- The positioning of the screws has been changed to horisontal, at half the height of the blocking.
- Each row shall be QA inspected in the box. The approval of each row will be documented by adding a personal QA inspector stamp on each vertical divider, at the top screw position.
- The height of the blocks has been increased to 80 mnm.
- The tubes will be inspected by Miz 30 after box assembly. This is valid for tubes I and 27 in each row package. This action will be incorporated in next revision of CP 6344.
10 CFR 21 Condition: The technique of using screws in the boxes has also been used for the RSG Projects Palo Verde 2 (Ansaldo) and Sequoyah 1 (Doosan). This means that there is a potential risque that similar damage to tubes could have been caused during packing of these 2 projects for the US market.
Name Position Date Signature Per-Olof Lund QA Mgr, Specialty Tubes 2004-04-27 /-° Adk Purchaser's decision: