MONTHYEARML0414104452004-04-27027 April 2004 During Unpacking of Boxes for Palo Verde I SG I at Ansaldo Plant It Was Revealed That Some Tubes Had Been Damaged by Screws During Packing in Sandviken. During Sandvik Reinspection of Boxes at the Ansaldo Plant, Further Damaged Tubes Were F Project stage: Request ML0425702862004-09-10010 September 2004 Summary of Telephone Conference with TVA Re Sequoyah Unit 1 Preservice Steam Generator Tube Inspections Project stage: Other ML0425702292004-09-10010 September 2004 Summary of Meeting with Tennessee Valley Authority Regarding Potential Fabrication Damage to Steam Generator Tubes at Sequoyah, Unit 1 Project stage: Meeting ML0501901092005-01-16016 January 2005 1/16/05, DC Cook - Tech Specs - Issuance of Emergency Amendment Regarding One-Time Allowed Outage Time Extension for West Centrifugal Charging Pump Project stage: Approval ML0501807372005-01-16016 January 2005 1/16/05, DC Cook - Issuance of Emergency Amendment One-Time Allowed Outage Time Extension for West Centrifugal Charging Pump Project stage: Approval 2004-09-10
[Table View] |
Similar Documents at Cook |
---|
Category:Technical Specifications
MONTHYEARAEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML22046A2332022-06-21021 June 2022 Issuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level Instrumentation ML21125A5762021-04-19019 April 2021 9 Technical Specification Bases, List of Effective Pages (Unit 2) ML21125A5482021-04-19019 April 2021 2 to Technical Specifications Bases, List of Effective Pages (Unit 1) ML20366A1552021-01-15015 January 2021 Issuance of Amendments Nos. 357 and 336 Regarding Revision to Technical Specifications Bases Control Program ML20329A0012021-01-12012 January 2021 Issuance of Amendment No. 356 Regarding Updating the Reactor Coolant System Pressure-Temperature Limits ML20322A4282021-01-0606 January 2021 Issuance of Amendment Nos. 355 and 335, Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues AEP-NRC-2020-78, License Amendment Request Regarding a Change to the Steam Generator (SG) Program to Allow for a One-Time Deferral of SG Inspections2020-12-14014 December 2020 License Amendment Request Regarding a Change to the Steam Generator (SG) Program to Allow for a One-Time Deferral of SG Inspections ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML17131A2772017-06-0707 June 2017 Issuance of Amendments License Amendment Request Regarding Containment Leakage Rate Testing Program ML16195A0042016-08-0404 August 2016 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008 01, Managing Gas Accumulation ML14197A0972015-11-30030 November 2015 Issuance of Amendment Regarding Restoration of Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions ML15328A4512015-11-19019 November 2015 Enclosures 1 - 5: Affirmation, Description of Proposed Changes, Probabilistic Risk Assessment Technical Adequacy, and CNP Units 1 & 2 TS Pages Marked to Show Proposed Changes ML15187A0022015-07-10010 July 2015 Issuance of Amendment No. 328 (Exigent) Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System AEP-NRC-2015-62, Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2015-06-29029 June 2015 Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML15076A2262015-04-0606 April 2015 Issuance of Amendments Adoption of TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability, Revision 2 AEP-NRC-2015-05, Correction of Technical Specification Typographical Error2015-02-0202 February 2015 Correction of Technical Specification Typographical Error ML14282A1182014-11-20020 November 2014 Issuance of Amendments Regarding Containment Divider Barrier Seal AEP-NRC-2014-09, License Amendment Request to Revise Technical Specification Section 5.5.14, Containment Leakage Rate Testing Program2014-03-0707 March 2014 License Amendment Request to Revise Technical Specification Section 5.5.14, Containment Leakage Rate Testing Program ML13282A2142013-10-0909 October 2013 Issuance of Amendment Revision to Technical Specification 3.6.9, Distributed Ignition System (Dis) (Emergency Circumstances) AEP-NRC-2013-79, License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 52013-10-0808 October 2013 License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 5 ML11182A1782011-07-28028 July 2011 License Amendment, Issuance of Amendments Cyber Security Plan AEP-NRC-2009-71, Response to Request for Additional Information Regarding a License Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology2009-11-20020 November 2009 Response to Request for Additional Information Regarding a License Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology AEP-NRC-2009-23, License Amendment Request Regarding Large Break Loss-of-Coolant Accident Analysis Methodology2009-03-19019 March 2009 License Amendment Request Regarding Large Break Loss-of-Coolant Accident Analysis Methodology ML0903502102009-01-14014 January 2009 License Amendment Request to Revise Operating Licenses DPR-58 and DPR-74, Appendix B, Environmental Technical Specifications, Part II, Non-Radiological Environmental Protection Plan ML0826004692008-09-0404 September 2008 Supplement to Emergency Diesel Generator Maximum Steady State Frequency Amendment Request ML0815108932008-05-28028 May 2008 Correction of Amendment No. 304 for Unit 1 and 287 for Unit 2, (Tac Nos. MD6317 & MD6318) - Tech Specs ML0812302702008-04-28028 April 2008 Tech Spec Pages for Amendments 304 & 287 to Add a Surveillance Requirement for When Offsite Power Is Provided Via Backfeed Through the Main Transformer and a Unit Auxiliary Transformer ML0812302692008-04-28028 April 2008 Tech Spec Pages for Amendments 305 and 288 Regarding Maximum Ventilation System Filter Pressure Drop ML0806600672008-03-0505 March 2008 Tech Spec Page for Amendments 302 & 285 to Revise a Specification Inadvertently Omitted by Previous Amendments Power Range Neutron Flux High Negative Rate Trip Function ML0801106652008-01-11011 January 2008 Tech Spec Pages for Amendments 301 and 284 Regarding Operational Test of the Reactor Trip on Turbine Trip ML0800800492008-01-0404 January 2008 Technical Specifications, Correction of Amendment No. 282 Containment Sump Modifications Per Generic Letter 2004-02 ML0735204032007-12-17017 December 2007 Technical Specifications, Issuance of Amendment RTS and ESFAS Bypass Testing Capability ML0729501002007-10-18018 October 2007 Technical Specifications, Issuance of Amendments Containment Sump Modifications Per Generic Letter 2004-02 (TAC Nos. MD5901 & MD5902) ML0725306592007-09-19019 September 2007 Technical Specifications, Issuance of Amendment Replacement of Resistance - Temperature Detectors and Associated Piping ML0714200712007-05-11011 May 2007 Technical Specification Change of Conditional Surveillance Frequency ML0710100972007-04-0606 April 2007 Technical Specification Page Correction of Administrative Error in Amendment No. 298, Steam Generator Tube Integrity ML0708101332007-03-14014 March 2007 D.C. Cook, Technical Specifications, Steam Generator Integrity ML0708607652007-03-14014 March 2007 Corrections to Technical Specification Table of Contents ML0700305172006-12-26026 December 2006 Supplement to Application for Technical Specification (TS) Improvement Regarding Steam Generator Tube Integrity ML0628303132006-10-0606 October 2006 D.C. Cook, Tech Spec Pages for Amendment 296, Regarding Elimination of the Resistance Temperature Detector (RTD) Bypass Loop ML0624901142006-09-0101 September 2006 D.C. Cook, Technical Specification Pages Re AC Sources - Operating ML0618801572006-07-0505 July 2006 Technical Specifications Pages Regarding Leakage ML0616004492006-05-31031 May 2006 Application for Amendment to Revise Technical Specification Surveillance Requirement for Channel Calibration of Overtemperature Differential Temperature and Overpower Differential Temperature Reactor Protection System Functions ML0610805842006-04-21021 April 2006 Correction of Amendments Technical Specifications, Conversion to Improved Format ML0610404022006-04-13013 April 2006 Technical Specification - Issuance of Amendment Under Emergency Circumstances Regarding Diesel Generator Votage Limit Requirements ML0607603742006-03-0707 March 2006 Application for Amendment to Revise Technical Specification 5.5.2, Leakage Monitoring Program. ML0604400222006-02-10010 February 2006 Technical Specifications, Delete the Power Range Neutron Flux High Negative Rate Trip Function ML0601700302006-01-12012 January 2006 Tech Spec Pages for Amendments 292 and 274 Regarding Elimination of Requirements for Monthly Operating Reports and Occupational Radiation Exposure Reports 2024-08-28
[Table view] |
Text
3. Identification of process sampling points;
- 4. Procedure for the recording and management of data;
- 5. Procedures defining corrective actions for off control point chemistry conditions; and
- 6. A procedure identifying (a) the authority responsible for the interpretation of the data, and (b)the sequence and timing of administrative events required to initiate corrective actions.
(8) Deleted by Amendment No. 279 (9) Deleted by Amendment No. 279 (10) Deleted by Amendment No. 279 (11) Deleted by Amendment No. 279 (12) The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed outage time of Technical Specifications 3.1.2.4 and 3.5.2, Action "a," which was entered at 0130 on January 13, 2005, may be extended by an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to complete repair and testing of the 1 West Centrifugal Charging Pump.
D. Physical Protection The Indiana Michigan Power Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans', which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Donald C. Cook Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0," submitted by letter dated October 12, 2004.
E. Deleted by Amendment No. 80 F. Deleted by Amendment No. 80 G. In all places of this license, the reference to the Indiana and Michigan Electric Company is amended to read Indiana Michigan Power Company.
H. System Integrity The licensee shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low a practical levels. The program shall include the following:
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Amendment No. 2IO, 285 Revised by letter dated October: 28, 2001