CY-04-155, Registration of Spent Fuel Dry Cask in Use at the Plant Independent Spent Fuel Storage Installation (ISFSI)

From kanterella
Revision as of 00:02, 17 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Registration of Spent Fuel Dry Cask in Use at the Plant Independent Spent Fuel Storage Installation (ISFSI)
ML042170155
Person / Time
Site: Haddam Neck, 07201025  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/28/2004
From: Bouchard G
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR, CY-04-155
Download: ML042170155 (2)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD

-~~--Office of Nuclear Material-Safety and Safeguards------------______

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Registration of Spent Fuel Drv Cask in use at the Haddam Neck Plant (HNP) Independent Spent Fuel Storaae Installation (ISFSI) c.d a .it

.. .i c ..... .. . '. . .

In accordance0'with10 CFR72.21 2(b)(1 )(ii), Connecticut Yankee Atomic Power Company (CYAPCO) is registering the use of a spent fuel dry cask to store spent fuel under a 10 CFR Part 72 general license at the HNP ISFSI.

Licensee's Name: Connecticut Yankee Atomic Power Company Licensee's Address: Haddam Neck Plant 362 Injun Hollow Road East Hampton, CT 06424-3099 Reactor License Number: DPR-61 Reactor Docket No.: 50-213 ISFSI Docket No.: 72-0039 Contact-Name and

Title:

G. P. van Noordennen; Regulatory Affairs Manager Cask Certification No.' Cerificdtae of Compliance 1025; Amendment 'No:3, October 1, 2003

'. ' . .'-t. .':'I '

, ,.,. a.={.f.Bt5

Document Control Center CY-04-155/ Page 2 Cask Model No.: NAC-MPC Cask Identification Nos.: Transportable storage canister (TSC) Identification No.

CY-MPC-TSC-414-23 Vertical Concrete Cask (VCC) Identification No.: CY-VCC-23 Date in Service: July 22, 2004 There are no regulatory commitments contained in this letter.

If you should have any questions regarding this submittal, please contact me at (860) 267-3938.

Sincerely, Gary ouca Date Director Nuclear Safety/Regulatory Affairs cc: H. J. Miller, NRC Region 1 Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region 1 E. L. Wilds, Jr., Director, CT DEP, Monitoring and Radiation Division