CY-04-155, Registration of Spent Fuel Dry Cask in Use at the Plant Independent Spent Fuel Storage Installation (ISFSI)
| ML042170155 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck, 07201025 File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 07/28/2004 |
| From: | Bouchard G Connecticut Yankee Atomic Power Co |
| To: | Document Control Desk, NRC/NMSS/SFPO |
| References | |
| -RFPFR, CY-04-155 | |
| Download: ML042170155 (2) | |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
- EAST HAMPTON, CT 06424-3099 CY-04-155 Licenseth.DPR-61 Docket No. 50-213 Docket No. 72-0039 Re: 10 CFR 72.212 Director, Spent Fuel Project Office,
-~~--Office of Nuclear Material-Safety and Safeguards------------______
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Registration of Spent Fuel Drv Cask in use at the Haddam Neck Plant (HNP) Independent Spent Fuel Storaae Installation (ISFSI) a c.d i c
.it..
In accordance0'with10 CFR72.21 2(b)(1 )(ii), Connecticut Yankee Atomic Power Company (CYAPCO) is registering the use of a spent fuel dry cask to store spent fuel under a 10 CFR Part 72 general license at the HNP ISFSI.
Licensee's Name: Connecticut Yankee Atomic Power Company Licensee's Address: Haddam Neck Plant 362 Injun Hollow Road East Hampton, CT 06424-3099 Reactor License Number: DPR-61 Reactor Docket No.: 50-213 ISFSI Docket No.: 72-0039 Contact-Name and
Title:
G. P. van Noordennen; Regulatory Affairs Manager Cask Certification No.' Cerificdtae of Compliance 1025; Amendment 'No:3, October 1, 2003
.'-t.
.':'I a.={.f.Bt5
Document Control Center CY-04-155/ Page 2 Cask Model No.: NAC-MPC Cask Identification Nos.: Transportable storage canister (TSC) Identification No.
CY-MPC-TSC-414-23 Vertical Concrete Cask (VCC) Identification No.: CY-VCC-23 Date in Service: July 22, 2004 There are no regulatory commitments contained in this letter.
If you should have any questions regarding this submittal, please contact me at (860) 267-3938.
Sincerely, Gary ouca Date Director Nuclear Safety/Regulatory Affairs cc:
H. J. Miller, NRC Region 1 Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region 1 E. L. Wilds, Jr., Director, CT DEP, Monitoring and Radiation Division