Page 1 of 2 Robinson 08/30/2004 14:10:38 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-TFP - FIRE PROTECTION-TRIENNIAL 4 2 IP 7111105T Fire Protection 08/30/2004 09/03/2004 Baseline Inspections OL EXAM - INITIAL EXAM 3 2 V23218 ROBINSON/EXAMS AT POWER FACILITIES 08/30/2004 09/03/2004 Not Applicable EB2ISFSI - ISFSI CONSTRUCTION / OPERATION 3 2 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 10/04/2004 10/08/2004 Other Routine 2 IP 60855 Operation Of An ISFSI 10/04/2004 10/08/2004 Other Routine PB4-PI&R - PROBLEM IDENTIFICATION & RESOLUTION 3 2 IP 71152B Identification and Resolution of Problems 10/04/2004 10/08/2004 Baseline Inspections PB4-PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 3 2 IP 71152B Identification and Resolution of Problems 10/18/2004 10/22/2004 Baseline Inspections EB2TI159 - REVIEW OF GENERIC LETTER 89-13 4 2 IP 2515/159 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E 10/24/2004 10/28/2004 Safety Issues OL EP - EP INSPECTION 1 2 IP 7111402 Alert and Notification System Testing 12/13/2004 12/17/2004 Baseline Inspections 2 IP 7111403 Emergency Response Organization Augmentation Testing 12/13/2004 12/17/2004 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/13/2004 12/17/2004 Baseline Inspections 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/13/2004 12/17/2004 Baseline Inspections 2 IP 71151 Performance Indicator Verification 12/13/2004 12/17/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 2 IP 7111121 Safety System Design and Performance Capability 01/17/2005 01/21/2005 Baseline Inspections PS-RP - RP PUBLIC AND ISFSI 3 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/31/2005 02/04/2005 Other Routine 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/31/2005 02/04/2005 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/31/2005 02/04/2005 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program 01/31/2005 02/04/2005 Baseline Inspections 2 IP 71151 Performance Indicator Verification 01/31/2005 02/04/2005 Baseline Inspections OL RQ - REQUAL INSPECTION 2 2 IP 7111111B Licensed Operator Requalification Program 02/14/2005 02/18/2005 Baseline Inspections EB1SSDPC - SSDPC 5 2 IP 7111121 Safety System Design and Performance Capability 02/14/2005 02/19/2005 Baseline Inspections 2 IP 7111121 Safety System Design and Performance Capability 02/28/2005 03/04/2005 Baseline Inspections 60854 - ISFSI DRY RUN INSPECTION 1 2 IP 60854 Preoperational Testing Of An ISFSI 06/20/2005 06/24/2005 Other Routine This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
Page 2 of 2 Robinson 08/30/2004 14:10:38 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2 HEAD - REACTOR HEAD REPLACEMENT 2 2 IP 71007 Reactor Vessel Head Replacement Inspection 08/15/2005 08/19/2005 Other Routine 2 IP 71007 Reactor Vessel Head Replacement Inspection 09/05/2005 09/07/2005 Other Routine EB2-ISI - ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/06/2005 09/09/2005 Baseline Inspections PS - RP - RP OCCUPATIONAL 1 2 IP 7112101 Access Control to Radiologically Significant Areas 09/12/2005 09/16/2005 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 09/12/2005 09/16/2005 Baseline Inspections EB2SGISI - STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/19/2005 09/23/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 1 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/30/2006 02/03/2006 Baseline Inspections 2 IP 7111117B Permanent Plant Modifications 01/30/2006 02/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.