ML042430608
| ML042430608 | |
| Person / Time | |
|---|---|
| Site: | Robinson, 07200003 |
| Issue date: | 08/30/2004 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML042430597 | List: |
| References | |
| -RFPFR | |
| Download: ML042430608 (2) | |
Text
Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:10:38 Report 22 4
EB1-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 2
3 OL EXAM
- INITIAL EXAM Not Applicable 08/30/2004 09/03/2004 ROBINSON/EXAMS AT POWER FACILITIES V23218 2
3 EB2ISFSI
- ISFSI CONSTRUCTION / OPERATION Other Routine 10/04/2004 10/08/2004 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 2
Other Routine 10/04/2004 10/08/2004 Operation Of An ISFSI IP 60855 2
3 PB4-PI&R
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 10/04/2004 10/08/2004 Identification and Resolution of Problems IP 71152B 2
3 PB4-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 10/18/2004 10/22/2004 Identification and Resolution of Problems IP 71152B 2
4 EB2TI159
- REVIEW OF GENERIC LETTER 89-13 Safety Issues 10/24/2004 10/28/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E IP 2515/159 2
- EP INSPECTION Baseline Inspections 12/13/2004 12/17/2004 Alert and Notification System Testing IP 7111402 2
Baseline Inspections 12/13/2004 12/17/2004 Emergency Response Organization Augmentation Testing IP 7111403 2
Baseline Inspections 12/13/2004 12/17/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 2
Baseline Inspections 12/13/2004 12/17/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 2
Baseline Inspections 12/13/2004 12/17/2004 Performance Indicator Verification IP 71151 2
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 01/17/2005 01/21/2005 Safety System Design and Performance Capability IP 7111121 2
3 PS-RP
- RP PUBLIC AND ISFSI Other Routine 01/31/2005 02/04/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 2
Baseline Inspections 01/31/2005 02/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 2
Baseline Inspections 01/31/2005 02/04/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2
Baseline Inspections 01/31/2005 02/04/2005 Radiological Environmental Monitoring Program IP 7112203 2
Baseline Inspections 01/31/2005 02/04/2005 Performance Indicator Verification IP 71151 2
- REQUAL INSPECTION Baseline Inspections 02/14/2005 02/18/2005 Licensed Operator Requalification Program IP 7111111B 2
5 EB1SSDPC - SSDPC Baseline Inspections 02/14/2005 02/19/2005 Safety System Design and Performance Capability IP 7111121 2
Baseline Inspections 02/28/2005 03/04/2005 Safety System Design and Performance Capability IP 7111121 2
1 60854
- ISFSI DRY RUN INSPECTION Other Routine 06/20/2005 06/24/2005 Preoperational Testing Of An ISFSI IP 60854 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:10:38 Report 22 2
EB2 HEAD
- REACTOR HEAD REPLACEMENT Other Routine 08/15/2005 08/19/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
Other Routine 09/05/2005 09/07/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
1 EB2-ISI
- ISI Baseline Inspections 09/06/2005 09/09/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 PS - RP
- RP OCCUPATIONAL Baseline Inspections 09/12/2005 09/16/2005 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 09/12/2005 09/16/2005 ALARA Planning and Controls IP 7112102 2
1 EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 09/19/2005 09/23/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2
Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.