MONTHYEARML23305A0412023-11-0101 November 2023 Updated Steam Generator Tube Inspection Report RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23223A0542023-08-11011 August 2023 Attachment 1 - Braidwood Station, Unit 2: Form OAR-1 Owner'S Activity Report BW230019, Steam Generator Eddy Current Inspection Report Refueling Outage 23 (A1R23) - October 20222022-10-31031 October 2022 Steam Generator Eddy Current Inspection Report Refueling Outage 23 (A1R23) - October 2022 BW220019, Steam Generator Tube Inspection Report Refueling Outage 22 (A2R22)2022-04-27027 April 2022 Steam Generator Tube Inspection Report Refueling Outage 22 (A2R22) ML22031A0442022-01-31031 January 2022 Form OAR-1 Owner'S Activity Report BW210083, Revision to Unit 1 Inservice Inspection Summary Report2021-12-15015 December 2021 Revision to Unit 1 Inservice Inspection Summary Report ML21202A1932021-07-21021 July 2021 Owner'S Activity Report (OAR) for Refueling Outage A1R22 BW210032, Inservice Testing Program Fourth Ten Year Interval July 29, 2018- July 28, 20282021-04-28028 April 2021 Inservice Testing Program Fourth Ten Year Interval July 29, 2018- July 28, 2028 BW200095, Inservice Inspection Summary Report2020-12-0909 December 2020 Inservice Inspection Summary Report BW210002, Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 32020-11-25025 November 2020 Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 3 RS-20-085, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2020-07-24024 July 2020 Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20017A1332020-01-17017 January 2020 Inservice Inspection Summary Report NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 RS-19-084, Relief Request Associated with the Third Ten-Year Lnservice Inspection Program Interval2019-08-27027 August 2019 Relief Request Associated with the Third Ten-Year Lnservice Inspection Program Interval NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants2019-04-30030 April 2019 Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants ML19030B0872019-01-30030 January 2019 Submittal of Inservice Inspection Summary Report ML18264A1552018-09-21021 September 2018 Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 1 ML18208A2942018-07-27027 July 2018 Fourth Ten-Year Interval Inservice Testing Program Plan ML18208A3272018-07-27027 July 2018 Lnservice Inspection Summary Report ML17236A4572017-08-24024 August 2017 Steam Generator Tube Inspection Report for Refueling Outage 19 ML17244A2332017-08-18018 August 2017 Inservice Inspection Summary Report ML17058A0852017-02-27027 February 2017 Steam Generator Tube Inspection Report for Refueling Outage 19 ML17024A3982017-01-24024 January 2017 Inservice Inspection Summary Report for Refueling Outage 19 (A1R19) ML16021A0802016-01-21021 January 2016 Inservice Inspection Summary Report ML15198A1952015-07-16016 July 2015 Inservice Inspection Summary Report RS-15-155, Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2015-05-29029 May 2015 Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations ML14318A2112014-11-14014 November 2014 Steam Generator Tube Inspection Report for Refueling Outage 17 RS-14-251, Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2014-09-0808 September 2014 Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations ML14232A3242014-08-20020 August 2014 Inservice Inspection Summary Report ML13358A4002013-12-20020 December 2013 Inservice Inspection Summary Report for Refueling Outage 17 ML13037A5062013-02-0606 February 2013 Inservice Inspection Summary Report ML12251A3592012-08-17017 August 2012 (Returned to DCD) Braidwood Station, Unit 1, Steam Generator Tube Inspection Report for Refueling Outage 15 ML12230A2262012-08-17017 August 2012 Inservice Inspection Summary Report ML11227A2532011-08-10010 August 2011 Inservice Inspection Summary Report RS-11-069, Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations2011-04-19019 April 2011 Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations RS-11-050, Third 10-Year Inservice Inspection Interval Relief Request I3R-08, Alternative Requirements to ASME Section XI Appendix VII (Supplements 2 and 10), Examinations of Class 1 Pressure Retaining Welds Conducted from the Inside.2011-04-11011 April 2011 Third 10-Year Inservice Inspection Interval Relief Request I3R-08, Alternative Requirements to ASME Section XI Appendix VII (Supplements 2 and 10), Examinations of Class 1 Pressure Retaining Welds Conducted from the Inside. ML1103505122011-02-0404 February 2011 Inservice Inspection Summary Report ML1003302732010-01-27027 January 2010 Inservice Inspection Summary Report ML0921105382009-07-27027 July 2009 Submittal of Inservice Testing Program Plan for the Third Ten-Year Interval ML0920502512009-07-16016 July 2009 Submittal of Inservice Inspection Summary Report, Fourteenth Refueling Outage (A1R14) ML0920502592009-07-16016 July 2009 Fourteenth Refueling Outage Steam Generator Inservice Inspection Summary Report ML0908607152009-03-25025 March 2009 Submittal of Third Inservice Inspection (ISI) Interval Program Plan RS-08-160, Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure .2008-12-10010 December 2008 Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure . ML0829007072008-08-13013 August 2008 Inservice Inspection Summary Report for: Interval 2, Period 3, Outage 2 A2R13 Outage ML0802205262008-01-22022 January 2008 Inservice Inspection Summary Report ML0801804372008-01-18018 January 2008 Thirteenth Refueling Outage Steam Generator Inservice Inspection Summary Report ML0727403892007-10-17017 October 2007 Review of Twelfth Refueling Outage Steam Generator Tube Inservice Inspection Report ML0705403462007-02-23023 February 2007 Second 10-Year Inservice Inspection Interval, Relief Request I2R-48, Structural Weld Overlays on Pressurizer Spray, Relief, Safety and Surge Nozzle Safe-Ends and Associated Alternative Repair Techniques ML0702906712007-01-29029 January 2007 Inservice Inspection Summary Report 2023-08-11
[Table view] |
Text
Exe Iukn.
Exelon Generation Company, LLC www.exeloncorp.com Nuclear Braidwood Station 35100 South Rt 53, Suite 84 Braceville, IL 60407-9619 Tel. 815-417-2000 October 29, 2004 BW040098 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Braidwood Station, Unit 1 Facility Operating License No. NPF 72 NRC Docket No. STN 50-456
Subject:
October 2004, Eleventh Refuel Outage Steam Generator Inservice Inspection Report In accordance with Technical Specification 5.6.9, "Steam Generator (SG) Tube Inspection Reports," Exelon Generation Company, LLC is reporting the number of tubes plugged or repaired during the SG inservice inspection activities conducted during the Braidwood Station, Unit 1 October 2004 eleventh refueling outage. Technical Specification 5.6.9.a requires that following each inservice inspection of the SG tubes, the number of tubes plugged or repaired in each SG shall be reported to the NRC within 15 days.
The Braidwood Station Unit 1 October 2004 eleventh refueling outage SG tube eddy current inspection scope included 100% full-length bobbin coil inspection of the 1B SG. Scope expansion into the 1A,1 C and 1D was also conducted. The 1A,1 C and 1D scope expansion included approximately 22% bobbin coil inspection of the hot leg tubing. In addition, the peripheral tube regions of the cold leg tubing were inspected equaling approximately 15.5% of the cold leg tubing.
+PointM coil inspection was conducted on bobbin coil indications classified as requiring additional diagnostic testing.
The SG tube inspections were completed on October 18, 2004. No tube sleeving was performed during this outage. The Braidwood Unit 1 Steam Generator Tube Plugging Summary summarizes the inspection results during the October 2004 eleventh refueling outage and number of tubes removed from service to date by tube plugging.
BRAIDWOOD UNIT 1 STEAM GENERATOR TUBE PLUGGING
SUMMARY
- SGA l SGB SG C SG D Total Prema* Rugged 10 12 3 0 25 Rugged Durting October 2004 Refueling outage 0 2 2 1 5 Total 10 14 5 1 30 Please direct any questions regarding this submittal to Dale F. Ambler, Braidwood Regulatory Assurance Manager, (815) 417-2800.
Sincerely, T.P.Jy Site Vice President Braidwood Station cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Braidwood Station