MONTHYEARML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C7742019-07-30030 July 2019 Requalification Program Inspection ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19044A6012019-02-0404 February 2019 Operator Licensing Written Exam Approval ML19029B3192019-01-28028 January 2019 Operator Licensing Operating Test Approval ML18159A3512018-06-0505 June 2018 Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3) ML18047A1692018-01-0303 January 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18047A1702017-11-0707 November 2017 Handouts to Applicants (Folder 3) ML17297A6432017-10-24024 October 2017 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3 ML17297A0132017-10-23023 October 2017 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3 ML17234A5902017-08-22022 August 2017 Requalification Program Inspection - Indian Point Nuclear Generating, Unit 3 NL-17-080, Operator Licensing Examination Data2017-06-28028 June 2017 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17206A4422016-10-31031 October 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML16365A0432016-10-31031 October 2016 Handouts to Applicants (Folder 3) ML17069A2842016-10-31031 October 2016 Final Outlines Update ES-401-2, ES-401-3 ML16365A0412016-10-31031 October 2016 Final Outlines (Folder 3) ML17206A4452016-10-31031 October 2016 Final Qa/Related Forms (Folder 1) ML16365A0442016-10-31031 October 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML16365A0422016-10-31031 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16301A2882016-10-27027 October 2016 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2 ML16298A0162016-10-20020 October 2016 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2 ML17047A5982016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Operating Test (Folder 2) ML17047A5972016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Written Exam (Folder 2) ML17047A6012016-09-0101 September 2016 Draft Operating Exam (Section a, B, and C) (Folder 2) ML17047A6002016-09-0101 September 2016 Draft Written Exam (Folder 2) ML17047A5992016-07-18018 July 2016 Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016) NL-16-073, Operator Licensing Examination Data2016-07-0707 July 2016 Operator Licensing Examination Data ML16189A0832016-07-0606 July 2016 Requalification Program Inspection - Indian Point Energy Center, Unit 2 ML16119A0012016-04-27027 April 2016 Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2 ML15223A0162015-08-10010 August 2015 Requalification Program Inspection-Indian Point Energy Ctr, Unit 3 IR 05000286/20153012015-06-24024 June 2015 Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report ML15163A2302015-06-0404 June 2015 Draft - Outlines (Folder 2) ML15163A2322015-06-0404 June 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15163A2312015-06-0404 June 2015 Draft Written Exam (Folder 2) ML15163A2292015-06-0404 June 2015 All Comments on Draft NRC-Developed Exam (Operating) (Folder 2) ML15160A4702015-06-0404 June 2015 Final Outlines (Folder 3) ML15160A4642015-06-0404 June 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15160A4562015-06-0404 June 2015 Handouts to Applicants (Folder 3) ML15160A4092015-06-0404 June 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15282A3072015-06-0101 June 2015 Final Qa/Related Forms (Folder 1) ML14308A0522014-10-29029 October 2014 Final Outlines (Folder 3) ML14307B5652014-10-29029 October 2014 Draft Operating Exam (Section a) (Folder 2) ML14307B5212014-10-29029 October 2014 Draft-Outlines (Folder 2) ML14307B3852014-10-29029 October 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14308A2512014-10-29029 October 2014 Final Operating Exam (Section a) (Folder 3) ML14251A2402014-09-0808 September 2014 Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2 2021-01-12
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C7742019-07-30030 July 2019 Requalification Program Inspection ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19029B3192019-01-28028 January 2019 Operator Licensing Operating Test Approval ML18159A3512018-06-0505 June 2018 Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3) ML18047A1692018-01-0303 January 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18047A1702017-11-0707 November 2017 Handouts to Applicants (Folder 3) ML17297A6432017-10-24024 October 2017 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3 ML17297A0132017-10-23023 October 2017 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3 NL-17-080, Operator Licensing Examination Data2017-06-28028 June 2017 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16365A0442016-10-31031 October 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML17206A4422016-10-31031 October 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17206A4452016-10-31031 October 2016 Final Qa/Related Forms (Folder 1) ML17069A2842016-10-31031 October 2016 Final Outlines Update ES-401-2, ES-401-3 ML16365A0422016-10-31031 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16365A0412016-10-31031 October 2016 Final Outlines (Folder 3) ML16365A0432016-10-31031 October 2016 Handouts to Applicants (Folder 3) ML16301A2882016-10-27027 October 2016 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2 ML16298A0162016-10-20020 October 2016 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2 ML17047A5972016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Written Exam (Folder 2) ML17047A5982016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Operating Test (Folder 2) ML17047A6002016-09-0101 September 2016 Draft Written Exam (Folder 2) ML17047A6012016-09-0101 September 2016 Draft Operating Exam (Section a, B, and C) (Folder 2) ML17047A5992016-07-18018 July 2016 Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016) NL-16-073, Operator Licensing Examination Data2016-07-0707 July 2016 Operator Licensing Examination Data ML16119A0012016-04-27027 April 2016 Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2 ML15223A0162015-08-10010 August 2015 Requalification Program Inspection-Indian Point Energy Ctr, Unit 3 IR 05000286/20153012015-06-24024 June 2015 Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report ML15163A2312015-06-0404 June 2015 Draft Written Exam (Folder 2) ML15163A2322015-06-0404 June 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15160A4562015-06-0404 June 2015 Handouts to Applicants (Folder 3) ML15163A2302015-06-0404 June 2015 Draft - Outlines (Folder 2) ML15163A2292015-06-0404 June 2015 All Comments on Draft NRC-Developed Exam (Operating) (Folder 2) ML15160A4092015-06-0404 June 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15160A4702015-06-0404 June 2015 Final Outlines (Folder 3) ML15160A4642015-06-0404 June 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15282A3072015-06-0101 June 2015 Final Qa/Related Forms (Folder 1) ML14308A0522014-10-29029 October 2014 Final Outlines (Folder 3) ML14307B5652014-10-29029 October 2014 Draft Operating Exam (Section a) (Folder 2) ML14307B5212014-10-29029 October 2014 Draft-Outlines (Folder 2) ML14307B3852014-10-29029 October 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14308A2512014-10-29029 October 2014 Final Operating Exam (Section a) (Folder 3) ML14251A2402014-09-0808 September 2014 Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2 ML14195A0902014-07-14014 July 2014 Requalification Program Inspection-Indian Point Station, Unit 2 IR 05000247/20143012014-03-31031 March 2014 Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report ML14091A6922014-03-31031 March 2014 Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report 2021-01-12
[Table view] |
Text
ENTERGY - I N D I A N P O I N T ENERGY CENTER TO: TODD FISH, CHIEF EXAMINER FROM B I U ALTIC, AUTHOR - IP2 OPERATING EXAMINATION
SUBJECT:
CHANGE
SUMMARY
DATE: 10/5/2004 SCENARIOS Scenario I :
Removed Event 4,23 RCP High Vibration. BOP operator Task, not needed. Renumbered all subsequent events.
Reworded Critical Task 3 to Stop all SI pumps within 45 minutes of SI actuation. Original wording is valid for initiation from 100% power only. 45 minute limit is per the IP2 UFSAR.
Revised the initial conditions to provide turnover with Main Feedwater already in service. This eliminates the actions to shift from Auxiliary Feedwater to Main Feedwater; task not needed.
Scenario 2:
Added note to event description for events 1 and 2 to indicate that these events require SRO Technical Specification reference.
Changed scenario initial conditions to provide a required BOP operator action to start a Non-Essential SWP after loss of Bus 6A. Added note to setup to ensure that 23 S W P is in service.
Scenario 3:
Added note to event description for events 2 and 3 to indicate that these events require SRO Technical Specification reference.
Revised wording of event description for event 7 to more accurately reflect the malfunction.
Both recirculation pumps will not start vice fail to auto start. Added further clarification that RHR will be used for low head recirculation.
Added to shift turnover instructions: Reactor Engineer recommends that control rods be withdrawn 10 steps prior to continuing dilution.
Scenario 4:
Added note to event description for event 2 to indicate that this event requires SRO Technical Specification reference.
Swapped sequence of events 2 and 3 to improve scenario flow path.
Added a new event number 5: AFW Flow Control Valve to faulted SG does not close from the Control Room. Renumbered subsequent event.
JPMS Sim-D Replaced RCP MalfunctionJPM with a bank JPM. New task has better discriminatory value.
Simplified initial conditions and initiating cue to improve/clarifj directions for applicant. Added critical step to attempt start of 23 Aux F W Pump.
Increased scope of task to include removal of instrument control power. Additional steps improve discriminatory value of the JPM.
Phnt-I Replaced JPM with new task to improve discriminatory value. New task is also a new alternate path JPM.
Admin RO-2 Removed SRO level steps from task performance. JPM includes only RO level actions.
2
ES-401 Written Examination Form ES-401-9 Review Worksheet
[Refer to Section D of ES-401 and Appendix 6 for additional information regarding each of the following concepts.]
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. - - -
Enter the level of difficulty (LOD)of each question using a 1 5 (easy difficult) rating scale (questions in the 2 4 range are acceptable).
- 3. Check the appropriate box if a psychometric flaw is identified:
The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
The answer choices are a collection of unrelated true/false statements.
One or more t@wmedistractors is not credible.
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradictedby stem).
- 4. Check the appropriate box if a job content error is identified:
The question is no! linked to the job requirements @e., the question has a valid WA but, as written, is.not peerational in content).
The question requires the recall of knowledge that is too specific f0.r the c!osed reference test mode (i.e.., it is not required to.be known from memory).
The question contains data with an unrealistic !eve1 of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question requires reverse logic or application compared to the job requirements.
- 5. Check questions that are sampled for conformance with the approved WA and those that are desianated SRO-only (WA and license level mismatches are unacceptable).
- 6. Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 7. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
33 of 34 NUREG-I 021, Draft Revision 9
ES-401 2 Form ES-401-9 Explanation 34 of 34 NUREG-1021, Draft Revision 9
ES-401 2 Form ES-401-9 34 of 34 NUREG-1021, Draft Revision 9