NL 133 ENCLOSURE IPEC UNIT 2 INITIAL LICENSED OPERATOR NRC WRITTEN EXAMINATION 10/22/04 Questions Asked and Answered During the Examination
- 1) Question 9
- a. Do I need to know the current suction pressure to the feed pumps?
- b. Use the information provided in the question
- 2) Question 49
- a. Were the reactor trip breakers supposed to open? Is this an ATWS?
- b. Use the information as provided in the question.
- 3) Question 42
- a. Do we assume the block valve is open
- b. Yes, assume the block valve is open (Informed all examinees to assume the block valve is open)
- 4) Question 30
- a. Do you mean a void is forming or response to a void?
- b. Use the information provided in the question
- 5) Question 49
- a. IB-1 does not affect spray. No right answer.
- b. Answer question as written,
- 6) Question 84
- a. Does stem imply that you have completed E-O?
- b. Yes. Add when exiting E-O to the question, ie. Which of the following is indicated by the given plant conditions and what procedure must be implemented when exiting E-O? (Informed all examinees)
- 7) Question 82
- a. What equipment was not operating or what was the timeline for the event?
- b. Use the information as provided in the question.
- 8) Question 29
- a. Loss of 125 VDC is the buswork to the RPS or to the breaker operations only?
- b. Stem contains appropriate restrictions to focus of question
- 9) Question 60
- a. Is the question distracter C referring to the suction piping?
- b. Consider C to refer to the suction piping. (Informed all examinees)