MONTHYEARML0512304712004-04-28028 April 2004 Technical Specification Pages for Exigent Amendment 162 to License NPF-42, Revising TS 5.5.9 Project stage: Other ML0511000632005-04-22022 April 2005 4/22/05, Wolf Creek Generating Station - Public Notice of Exigent Request for Revision to TS 5.5.9, Steam Generator (SG) Tube Surveillance Program Project stage: Other ML0511601472005-04-27027 April 2005 Response to Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0511601002005-04-28028 April 2005 Exigent Amendment 162, Revising Technical Spectification TS 5.5.9 to Add Changes to SG Inspection Scope for WCGS for Only Current Refueling Outage 14 & Subsequent Operating Cycle Project stage: Other ET 06-0026, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program.2006-06-30030 June 2006 Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program. Project stage: Request ML0625800192006-10-10010 October 2006 Issuance of Amendment Steam Generator Tube Inspections within the Tubesheet Project stage: Approval ET 08-0010, Withdrawal of License Amendment Request for a Permanent Alternate Repair Criteria in Technical Specification (TS) 5.5.9, Steam Generator (SG) Program.2008-02-14014 February 2008 Withdrawal of License Amendment Request for a Permanent Alternate Repair Criteria in Technical Specification (TS) 5.5.9, Steam Generator (SG) Program. Project stage: Withdrawal 2005-04-28
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21061A0782021-04-23023 April 2021 Issuance of Amendment No. 228 Regarding Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ML21053A1172021-04-0808 April 2021 1 - Issuance of Amendment No. 227 TS Change Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Based on TSTF-425 ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ML18093A9142018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Chapter 16, Technical Requirements Manual (Relocated Technical Specifications) ML17166A4092017-08-28028 August 2017 Issuance of Amendment No. 218, Request to Adopt Emergency Action Level (EAL) Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML17024A2412017-03-24024 March 2017 Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation Schedule ML16081A1942016-04-15015 April 2016 Issuance of Amendment No. 215, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 Consistent with TSTF-276-A, Revise DG Full Load Rejection Test WO 15-0051, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.142015-09-23023 September 2015 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 ML15183A0522015-09-11011 September 2015 Issuance of Amendment No. 214, Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in Updated Safety Analysis Report ML15203A0052015-08-28028 August 2015 Redacted, Issuance of Amendment No. 213, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Large-Break Loss-of-Coolant Accident Analysis Methodology (Astrum) ML15169A2132015-07-28028 July 2015 Issuance of Amendment No. 212, Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation WO 15-0045, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2015-07-27027 July 2015 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML14156A2462014-08-0707 August 2014 Issuance of Amendment No. 209, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Replace Westinghouse Methodologies ML14157A0822014-07-0101 July 2014 Issuance of Amendment No. 208, Adopt TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using Consolidated Line Item Improvement Process ML14006A2182014-01-13013 January 2014 Correction to Amendment No. 206, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.10 to Increase Voltage Limit for Diesel Generator Load Rejection Test WO 13-0089, Plant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-12-17017 December 2013 Plant Specific Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revised Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process ML13197A2102013-08-23023 August 2013 Issuance of Amendment No. 205, Revise Fire Protection License Condition and the Updated Safety Analysis Report for a Deviation from Appendix R for Volume Control Tank Outlet Valves ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2013-08-13013 August 2013 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML1107500362011-03-10010 March 2011 Changes to Technical Specification Bases - Revisions 45 Through 49 WO 10-0066, Correction of Typographical Error in Technical Specification 5.7.22010-10-21021 October 2010 Correction of Typographical Error in Technical Specification 5.7.2 ML1008205172010-07-23023 July 2010 Issuance of Amendment No. 188, Revise Technical Specifications for Use of Beacon Power Distribution Monitoring System ET 10-0014, Application to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.2-12010-04-13013 April 2010 Application to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.2-1 WO 10-0010, Updated Safety Analysis Report, Revision 232010-03-11011 March 2010 Updated Safety Analysis Report, Revision 23 ML1006401412010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ET 10-0011, Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps2010-03-0404 March 2010 Supplemental Information for Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML1006400442010-03-0303 March 2010 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps ML0927506062009-10-19019 October 2009 Issuance of Amendment No. 186, Modify Technical Specification 5.5.9, Steam Generator Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for Alternate Repair Criteria ET 08-0041, Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.2008-08-14014 August 2008 Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. ET 08-0038, Application to Revise Technical Specification 5.6.6., Reactor Coolant System (RCS) Pressure and Temperature Limits Report (Ptlr).2008-07-10010 July 2008 Application to Revise Technical Specification 5.6.6., Reactor Coolant System (RCS) Pressure and Temperature Limits Report (Ptlr). ML0808400052008-04-0404 April 2008 Tech Pages for Amendment 178, Revision to Technical Specification 5.5.9 on the Steam Generator Program ML0803701212008-04-0303 April 2008 Tech Spec Pages for Amendment No. 177, Revise TS 3.3.2, ESFAS and TS 3.7.3, Main Feedwater Isolation Valves by Addition of Main Feedwater Regulating Valves and Associated Bypass Valves ML0729700282008-03-0303 March 2008 Tech Spec Pages for Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 ML0720603282007-08-28028 August 2007 Tech Spec Pages for Amendment 174 Adoption of TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times WO 07-0012, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-05-0303 May 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program ML0705500202007-04-17017 April 2007 Tech Spec Pages for License Amendment No. 173 Adopting TSTF-372 on Limiting Condition for Operation 3.0.8, Inoperability of Snubbers ET 07-0004, Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement2007-03-14014 March 2007 Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement ET 06-0053, Application for Technical Specification to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2006-12-15015 December 2006 Application for Technical Specification to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0631202612006-11-0707 November 2006 Tech Spec Pages for Amendment 171 Regarding Addition of Actuator Trains to Main Steam and Feedwater Isolation Valves Technical Specifications ML0630502562006-10-31031 October 2006 Technical Specifications, Revision to Reactor Coolant System Specific Activity ML0627201792006-09-28028 September 2006 Tech Spec Pages for Amendment 167 Regarding Extended Containment Isolation Valve Completion Times ML0627000632006-09-26026 September 2006 Tech Spec Pages for Amendment 166 Regarding Changes to the Reactor Coolant System (RCS) Leakage Detection Instrumentation Methodology ET 06-0026, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program.2006-06-30030 June 2006 Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program. ET 06-0024, Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.2006-06-26026 June 2006 Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation. ML0612804712006-05-0808 May 2006 Tech Spec Pages for Amendment 164, Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ML0611702372006-04-26026 April 2006 Technical Specifications, Extended Diesel Generator Completion Times ET 06-0015, Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process2006-03-28028 March 2006 Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process ET 06-0004, Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program2006-02-21021 February 2006 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program ET 06-0012, Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidate Line Item Improvement Process2006-02-21021 February 2006 Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidate Line Item Improvement Process 2023-10-03
[Table view] |
Text
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program Steam generator tube integrity shall be demonstrated by performance of the following augmented inservice inspection program.
The provisions of SR 3.0.2 are applicable to the SG Tube Surveillance Program test frequencies.
- a. Steam Generator Sample Selection and Inswection - Steam generator tube integrity shall be determined during shutdown by selecting and inspecting at least the minimum number of steam generators specified in Table 5.5.9-1.
- b. Steam Generator Tube Sample Selection and Inspection - The steam generator tube minimum sample size, inspection result classification, and the corresponding action required shall be as specified in Table 5.5.9-2.
The inservice inspection of steam generator tubes shall be performed at the frequencies specified in Specification 5.5.9.c and the inspected tubes shall be verified acceptable per the acceptance criteria of Specification 5.5.9.d. The tubes selected for each inservice inspection shall include at least 3% of the total number of tubes in all steam generators; the tubes selected for these inspections shall be selected on a random basis except:
- 1. Where experience in similar plants with similar water chemistry indicates critical areas to be inspected, then at least 50% of the tubes inspected shall be from these critical areas;
- 2. The first sample of tubes selected for each inservice inspection (subsequent to the preservice inspection) of each steam generator shall include:
a) All nonplugged tubes that previously had detectable wall penetrations (greater than 20%),
b) Tubes in those areas where experience has indicated potential problems, and c) A tube inspection (pursuant to Specification 5.5.9.d.1 .h) shall be performed on each selected tube. If any selected tube does not permit the passage of the eddy current probe
-for a tube inspection, this shall be recorded and an (continued)
Wolf Creek - Unit 1 5.0-1 1 Amendment No. 423,159
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program (continued) adjacent tube shall be selected and subjected to a tube inspection.
- 3. The tubes selected as the second and third samples (if required by Table 5.5.9-2 during each inservice inspection may be subjected to a partial tube inspection provided:
a) The tubes selected for these samples include the tubes from those areas of the tube sheet array where tubes with imperfections were previously found, and b) The inspections include those portions of the tubes where imperfections were previously found.
- 4. For Refueling Outage 14, a sample of the SG B and C inservice tubes from the top of the hot leg tubesheet to 10 inches below the top of the tubesheet shall be inspected by rotating probe. This sample shall include a 20% minimum sample of the total population of bulges and overexpansions within the SG from the top of the hot leg tubesheet to 17 inches below the top of the tubesheet.
The results of each sample inspection shall be classified into one of the following three categories:
Cateoorv Inspection Results C-1 Less than 5% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective.
C-2 One or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes.
C-3 More than 10% of the total tubes inspected are degraded tubes or more than 1% of the inspected tubes are defective.
Note: In all inspections, previously degraded tubes must exhibit significant (greater than 10%) further wall penetrations to be included in the above percentage calculations.
- c. Inspection Frequencies - The above required inservice inspections of steam generator tubes shall be performed at the following frequencies:
(continued)
Wolf Creek - Unit 1 5.0-1 2 Amendment No. 1423, 162
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program (continued)
- 1. The first inservice inspection shall be performed after 6 Effective Full Power Months but within 24 calendar months of initial criticality. 'Subsequent inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection. If two consecutive inspections not including the preservice inspection, result in all inspection results falling into the C-1 category or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months;
- 2. If the results of the inservice inspection of a steam generator conducted in accordance with Table 5.5.9-2 at 40 month intervals fall in Category 0-3, the inspection frequency shall be increased to at least once per 20 months. The increase in inspection frequency shall apply until the subsequent inspections satisfy the criteria of Specification 5.5.9.c.1. The interval may then be extended to a maximum of once per 40 months; and
- 3. Additional, unscheduled inservice inspections shall be performed on each steam generator in accordance with the first sample inspection specified in Table 5.5.9-2 during the shutdown subsequent to any of the following conditions:
a) Reactor-to-secondary tube leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.13; or b) A seismic occurrence greater than the Double Design Earthquake, or c) -A loss-of-coolant accident requiring actuation of the Engineered Safety Features, or d) A main steam line or feedwater line break.
- d. Acceptance Criteria
- 1. As used in this Specification:
(continued)
Wolf Creek - Unit 1 5.0-1 3 Amendment No. 423, 162 l
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program (continued) a) Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections; b) Degradation means a service-induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube; c) Degraded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation; d) % Degradation means the percentage of the tube wall thickness affected or removed by degradation; e) Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective; f) Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40% of the nominal tube wall thickness. During Refueling Outage 14 and the subsequent operating cycle, this criterion does not apply to degradation identified in the portion of the tube below 17 inches from the top of the hot leg tubesheet. Degradation found in the portion of the tube below 17 inches from the top of the hot leg tubesheet does not require plugging. During Refueling Outage 14 and the subsequent operating cycle, all tubes with degradation identified in the portion of the tube within the region from the top of the hot leg tubesheet to 17 inches below the top of the tubesheet shall be removed from service; g) Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of a Double Design Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 5.5.9.c.3.c, above; (continued)
Wolf Creek - Unit 1 5.0-1 4 Amendment No. 423, 162
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program (continued) h) Tube Inspection means an inspection of the steam generator tube from the tube end (hot leg side) completely around the U-bend to the top support of the cold leg.
During'Refueling Outage 14 and the subsequent operating cycle, the portion of the tube below 17 inches from the top of the hot le'g tubesheet is excluded; i) Preservice Inspection means an inspection of the full length of each tube in each steam generator performed by eddy current techniques prior to service to establish a baseline condition of the tubing. This inispection shall be performed after the field hydrostatic test and prior to initial Power Operation using the equipment and techniques expected to be used during subsequent inservice inspections; and j) During Refueling Outage 14 and the subsequent operating cycle:
Bulge refers to a tube diameter deviation within the tubesheet of 18 volts or greater as measured by bobbin probe; and Overexpansion refers to a tube diameter deviation within the tubesheet of 1.5 mils or greater as measured by bobbin probe.
- 2. Steam generator tube integrity shall be determined after completing the corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 5;5.9-2.
- e. Reports The contents and frequency of reports concerning the steam generator tube'surveillahce program shall be in accordance with Specification 5.6.10.
(continued)
Wolf Creek - Unit 1 5.0-1 5 Amendment No. 4-23, 162
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program (continued)
TABLE 5.5.9-1 MINIMUM NUMBER OF STEAM GENERATORS TO BE INSPECTED DURING INSERVICE INSPECTION Preservice Inspection No Yes No. of Steam Generators per Unit TwoI Three I Four Two Three Four First Inservice Inspection All One Two Two Second & Subsequent Inservice Inspections One3 One' one2 One3 TABLE NOTATIONS
- 1. The inservice inspection may be limited to one steam generator on a rotating schedule encompassing 3 N % of the tubes (where N is the number of steam generators in the plant) if the results of the first or previous inspections indicate that all steam generators are performing in a like manner. Note that under some circumstances, the operating conditions in one or more steam generators may be found to be more severe than those in other steam generators. Under such circumstances the sample sequence shall be modified to inspect the most severe conditions.
- 2. The other steam generator not inspected during the first inservice inspection shall be inspected. The third and subsequent inspections should follow the instructions described in 1 above.
- 3. Each of the other two steam generators not inspected during the first inservice inspections shall be inspected during the second and third inspections. The fourth and subsequent inspections shall follow the instructions described in I above.
(continued)
Wolf Creek - Unit 1 5.0-1 6 Amendment No. 123