Tech Spec Pages for Amendment 166 Regarding Changes to the Reactor Coolant System (RCS) Leakage Detection Instrumentation Methodology
ML062700063
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/26/2006
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Donohew J N, NRR/DLPM,415-1307
Shared Package
ML062690257 List:
References
TAC MC8214
Download: ML062700063 (4)


Text

RCS Leakage Detection Instrumentation 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE:

a. The containment sump level and flow monitoring system;
b. One containment atmosphere particulate radioactivity monitor; and
c. One containment air cooler condensate monitoring system. I APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required containment A.1 ----------- NOTE ------

sump level and flow Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitoring system after establishment of inoperable, steady state operation.

Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore required 30 days containment sump level and flow monitoring system to OPERABLE status.

(continued)

Wolf Creek - Unit I 3.4-37 Amendment No. 423, 155, 166

RCS Leakage Detection Instrumentation 3.4.15 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required containment B.1.1 Analyze samples of the Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> atmosphere particulate containment atmosphere.

radioactivity monitor inoperable. OR B.1.2 -.-.-.--.-.-.- NOTE ----.........-

Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.2.1 Restore required' 30 days containment atmosphere particulate radioactivity monitor to OPERABLE status.

OR B.2.2 Verify containment air 30 days cooler condensate monitoring system is OPERABLE.

C. Required containment C.1 Perform SR 3.4.15.1. Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooler condensate monitoring system OR inoperable.

C.2 ----- NOTE--------

Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)

Wolf Creek - Unit 1 3.4-38 Amendment No.-42,, 166

RCS Leakage Detection Instrumentation 3.4.15 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required containment D.1 Restore required 30 days atmosphere particulate containment atmosphere radioactivity monitor particulate radioactivity inoperable, monitor to OPERABLE status.

AND OR Required containment cooler condensate D.2 Restore required 30 days monitoring system containment cooler inoperable, condensate monitoring system to OPERABLE status.

E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. All required monitoring F.1 Enter LCO 3.0.3. Immediately methods inoperable.

Wolf Creek - Unit 1 3.4-39 Amendment No.42-3, 166

RCS Leakage Detection Instrumentation 3.4.15 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.15.1 Perform CHANNEL CHECK of the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphere particulate radioactivity monitor.

SR 3.4.15.2 Perform COT of the required containment 92 days atmosphere particulate radioactivity monitor. I SR 3.4.15.3 Perform CHANNEL CALIBRATION of the required 18 months containment sump level and flow monitoring system.

SR 3.4.15.4 Perform CHANNEL CALIBRATION of the required 18 months containment atmosphere particulate radioactivity monitor.

SR 3.4.15.5 Perform CHANNEL CALIBRATION of the required 18 months containment cooler condensate monitoring system.

Molf Creek - Unit I 3.4-40 Amendment No.---2,, 166