Hurricane Gustav

From kanterella
Revision as of 20:46, 11 February 2018 by StriderTol (talk | contribs) (Created page with "{{hurricane-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

31 August 2008

See also: Hurricane

Scrams (1)

 Start dateScramSiteTitle
ENS 444571 September 2008 23:02:00Manual ScramRiver BendPlanned Manual Plant Shutdown Due to Grid Conditions

General

 Start dateSiteTitle
ML19274C6601 October 2019Nuclear Energy Innovation and Modernization Act NEIMA - Patricia Milligan 2019 National State Liaison Officer Conference Presentation
RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)28 February 2018River BendApplication for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 201520 December 2016Palisades
Indian Point
Grand Gulf
Pilgrim
Arkansas Nuclear
River Bend
Vermont Yankee
Waterford
Big Rock Point
FitzPatrick
Entergy - Form 10-K for Fiscal Year Ended December 31, 2015
RBG-47695, Response to Request to Additional Information Regarding RBS License Amendment Request to Extend Type a and Type C Test Frequencies27 July 2016River BendResponse to Request to Additional Information Regarding RBS License Amendment Request to Extend Type a and Type C Test Frequencies
ML16088A32623 March 2016WaterfordLicense Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 4 of 9)
ML15204A32421 July 2015WaterfordAttachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146
W3F1-2015-0042, Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End21 July 2015WaterfordAttachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End
ML13057A11622 February 2013River BendResponse to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3
ML12319A8341 November 2012Indian PointIntervenor Pre-filed Evidentiary Hearing Exhibit CLE000065, in Hurricane'S Wake, Decision Not to Evacuate Hospitals Raise Questions (November 1, 2012)
RBG-47290, Response to the March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 for Completing Emergency Communication Assessments31 October 2012River BendResponse to the March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 for Completing Emergency Communication Assessments
W3F1-2010-0079, Response to NRC Request for Additional Information Regarding Exemption Request3 November 2010WaterfordResponse to NRC Request for Additional Information Regarding Exemption Request
W3F1-2010-0041, Annual Radiological Environmental Operating Report - 200930 April 2010WaterfordAnnual Radiological Environmental Operating Report - 2009
ML09352012718 December 2009Grand Gulf
Arkansas Nuclear
River Bend
Waterford
Nrc/Entergy Operations, Inc., Management Meeting
ML0931002576 November 2009WaterfordIR 05000382-09-008; 12/15/08 - 09/24/09; Waterford Steam Electric Station, Unit 3; Operability Evaluation
05000382/LER-2009-00622 October 2009Docket NumberDegraded Hydraulic Fluid Causes Both Main Feedwater Isolation Valves to Fail Inservice Test Stroke
W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-122 October 2009WaterfordLicense Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1
RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval16 June 2009River BendRequest for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval
W3F1-2009-0015, Annual Radiological Environmental Operating Report - 200830 April 2009WaterfordAnnual Radiological Environmental Operating Report - 2008
RBG-46911, Radioactive Effluent Release Report for 200830 April 2009River BendRadioactive Effluent Release Report for 2008
RBG-46912, Submittal of Radiological Environmental Operating Report for 200830 April 2009River BendSubmittal of Radiological Environmental Operating Report for 2008
IR 05000382/200800511 February 2009WaterfordIR 05000382-08-005; on 09/17/2008 - 12/31/2008; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Heat Sink Performance; Routine Review of Identification and Resolution of Problems; and Other
RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request8 December 2008River BendLicense Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request
IR 05000458/20080046 November 2008River BendIR 05000458-08-004; Energy Operations, Inc; 06/29/2008 - 09/27/2008; River Bend Station, NRC Integrated Inspection Report
IR 05000382/200800431 October 2008WaterfordIR 05000382-08-004, on 07/01/2008 - 09/16/2008, Waterford Steam Electric Station, Unit 3, Operability Evaluations, Postmaintenance Testing
ML08305070530 October 2008WaterfordExtension Request to NRC for Implementation of TS Amendment 215 Diesel Fuel Oil
IR 05000416/200800417 October 2008Grand GulfIR 05000416-08-004, on 06/22/2008 - 09/21/2008, Grand Gulf, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, and Problem Identification and Resolution
ML08291056617 October 2008Grand GulfIR 05000416-08-004, on 06/22/2008 - 09/21/2008, Grand Gulf, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, and Problem Identification and Resolution
ML08291017315 October 2008WaterfordExtension Request to NRC for Implementation of TS Amendment 216 Diesel Fuel Oil
ML0828202428 October 2008River Bend
Waterford
Letter Regional Administrator, Appreciation of Staff
ML1012600832 October 2008Washington Public Power Supply SystemOperating Experience Community Communication on River Bend Winds Forces Exceed Turbine Building Siding Construction
05000416/FIN-2008004-0230 September 2008 23:59:59Grand GulfFailure to Perform an Adequate Risk Assessment During Adverse Weather Conditions
05000382/FIN-2008004-0130 September 2008 23:59:59WaterfordIntersystem loss of coolant event
ML08254039510 September 2008River Bend
Waterford
PNO-IV-2008-008A - Entergy Operations, Inc. (Waterford-3 and River Bend Station), NRC Response to Hurricane Gustav Update, 09/10/2008
ML0823805909 September 2008WaterfordGeneric Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling. Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action (Tac No. MD7894)
ENS 444692 September 2008 05:00:00Nondestructive And Visual InpectionAgreement State - Overexposure from Stuck Radiography Source
ML0824606222 September 2008River Bend
Waterford
PNO-IV-2008-008, Entergy Operations, Inc., Waterford-3 and River Bend Station, NRC Response to Hurricane Gustav
ENS 444571 September 2008 23:02:00River BendPlanned Manual Plant Shutdown Due to Grid Conditions
ENS 444541 September 2008 04:00:00WaterfordNotification of Unusual Event Due to Hurricane Warning Onsite
Press Release-08-159, NRC Monitoring Approach of Hurricane Gustav; Waterford Plant to Shut Down31 August 2008WaterfordPress Release-08-159: NRC Monitoring Approach of Hurricane Gustav; Waterford Plant to Shut Down