Corporate Notification Letter No. 50-297/OL-08-01, North Carolina State University
ML073460139
Person / Time
Site: North Carolina State University
Issue date: 12/14/2007
From: Young P
NRC/NRR/ADRA/DPR/PRTB
To: Hawari A
North Carolina State University
Young P, NRC/NRR/ADRA/DPR, 415-4094
References
Download: ML073460139 (9)


Text

December 14, 2007 Dr. Ayman I. Hawari, Director Nuclear Reactor Program North Carolina State University Campus Box 7909 2500 Stinson Drive Raleigh, NC 27695-7909

SUBJECT:

CORPORATE NOTIFICATION LETTER NO. 50-297/OL-08-01, NORTH CAROLINA STATE UNIVERSITY

Dear Dr. Hawari:

I made arrangements with Mr. Andrew Cook for the administration of operator licensing examinations at the North Carolina State University reactor. The written and operating examinations are scheduled for the week of February 11, 2008.

In order to meet this schedule, please furnish the material listed in Enclosure 1, "Reference Material for Reactor/Senior Reactor Operator Licensing Examinations (Non-Power)" as soon as possible by mail to the following address:

U.S. Nuclear Regulatory Commission ATTN: Phillip T. Young Mail Stop O-12 G-15 11555 Rockville Pike Rockville, MD 20852-2738 , Administration of Written Examinations, describes your responsibilities for conducting written examinations. Enclosure 3, Procedures for the Administration of Written Examinations, describes applicant responsibilities during the administration of the written examinations. Please ensure that all applicants are aware of these rules.

Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, "Facility Review of Written Examinations."

Final, signed senior reactor operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and process the applications. If our review cannot be completed in time to make a determination of applicant eligibility, the candidate may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.

Dr. Hawari The NRC has posted copies of the application forms, Personal Qualification Statement Licensee (NRC Form 398) and Certification of Medical History by Facility Licensee (NRC Form 396) on the agencys Web site at www.nrc.gov/reading-rm/doc-collections/

forms/nrc396.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc398.pdf, respectively.

These forms are in Adobe Acrobat format.

This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-4094, or email at pty@nrc.gov.

Sincerely,

/RA/

Phillip T. Young, Chief Examiner Research and Test Reactors Branch B Division of Policy and Rule Making Office of Nuclear Reactor Regulation Docket No. 50-297

Enclosures:

1. Reference Material for Reactor/Senior Operator Licensing Examinations
2. Administration of Written Examinations
3. Procedures for the Administration of Written Examinations
4. Facility Review of Written Examinations cc: Mr. Andrew Cook, North Carolina State University Manager of Engineering and Operations

Dr. Hawari The NRC has posted copies of the application forms, Personal Qualification Statement Licensee (NRC Form 398) and Certification of Medical History by Facility Licensee (NRC Form 396) on the agencys Web site at www.nrc.gov/reading-rm/doc-collections/

forms/nrc396.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc398.pdf, respectively.

These forms are in Adobe Acrobat format.

This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-4094, or email at pty@nrc.gov.

Sincerely,

/RA/

Phillip T. Young, Chief Examiner Research and Test Reactors Branch B Division of Policy and Rule Making Office of Nuclear Reactor Regulation Docket No. 50-297

Enclosures:

1. Reference Material for Reactor/Senior Operator Licensing Examinations
2. Administration of Written Examinations
3. Procedures for the Administration of Written Examinations
4. Facility Review of Written Examinations cc: Mr. Andrew Cook, North Carolina State University Manager of Engineering and Operations DISTRIBUTION:

PUBLIC RidsNrrDprPrta RidsNrrDprPrtb Facility File (CHart) O-12 D-19 ADAMS ACCESSION #: ML073460139 TEMPLATE #: NRR-079 Office PRTB/CE IOLB/OLA PRTB/BC Name PYoung pty CHart cah PI for JEads Date 12/14/07 12/14/07 12/14/07 OFFICIAL RECORD COPY

REFERENCE MATERIAL FOR NRC OPERATOR LICENSING EXAMINATIONS (NON-POWER)

1. Training materials should include all substantive written material used for preparing applicants for initial RO and SRO licensing. The written material should include learning objectives if available and the details presented during lectures, rather than outlines. Training materials should be identified, bound, and indexed. Training materials should include the following:

System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation. System training material should draw parallels to the actual procedures used for operating and applicable system.

Complete and operationally useful descriptions of all safety-system interactions, secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.

Training material used to clarify and strengthen understanding of emergency operating procedures.

2. Complete Procedure Index (including temporary procedures).
3. All administrative procedures as applicable to reactor operation or safety.
4. All integrated plant procedures, normal or general operating procedures and procedures for experiments.
5. All emergency procedures, emergency instructions, abnormal or special procedures.
6. Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
7. Applicable procedures (procedures that are run frequently).
8. Fuel-handling and core-loading procedures and initial core-loading procedure, when appropriate.
9. Any annunciator/alarm procedures, as applicable.
10. Radiation protection manual, radiation control manual or procedures.
11. Emergency plan implementing procedures.
12. Safety Analysis Report, Technical Specifications and interpretations, if available.
13. System operating procedures, including experiments.
14. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams, as applicable.
15. Technical Data Book, and/or plant curve information as used by operators and facility precautions, limitations, and set points for the facility.
16. Questions and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by facility licensee).
17. Additional material as requested by the examiners to develop examinations that meet the requirements of the Non-power Reactor Examiner Standards and Regulations.

The above reference material should be approved final issues and so marked. If a facility has not finalized some of the material, the Chief Examiner should verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.

ADMINISTRATION OF WRITTEN EXAMINATIONS

1. The facility licensee must provide a single room for the administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.
2. Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).
3. The facility must make arrangements acceptable to the chief examiner if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.
4. The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed.
5. Applicants may bring pens, pencils, calculators and slide rules into the examination room.

Only black ink or dark pencils should be used for writing answers to questions.

6. The Chief Examiner must approve any wall charts, models, or other training materials present in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.
7. The facility staff will be provided a copy of the written examination with answer key at the beginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.

ENCLOSURE 2

PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS

1. Verify candidate identity.
2. Pass out examinations and all handouts. Instruct applicants not to review examination until instructed to do so.

READ THE FOLLOWING INSTRUCTIONS VERBATIM:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. When you have completed your examination, you must sign the statement at the bottom of the cover sheet. This must be done after you complete the examination.

READ THE FOLLOWING INSTRUCTIONS:

1. Restroom trips are to be limited and only one applicant at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating.
2. Use black ink or dark pencil only to facilitate legible reproductions.
3. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
4. Mark your answers on the answer sheet provided.
5. The point value for each question is shown in [brackets] after the question.
6. If the intent of a question is unclear, ask questions of the examiner only.
7. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper.
8. To pass the examination, you must achieve a grade of 70 percent or greater in each category.
9. There is a time limit of one hour per section of the examination. A one section examination has a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.
10. After turning in your examination, leave the examination area (DEFINE THE AREA). If you are observed in this area while the examination is still in progress, your license may be denied or revoked.

ENCLOSURE 3

FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION

1. At the option of the Program Director, New, Research and Test Reactors (RNRP), the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by the facility.

Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.

a. Pre-Examination Security Agreement I ______________________ acknowledge that I have acquired specialized knowledge concerning the examination scheduled for _________________ at ___________________ as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.

Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.

b. Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of ____________________________ at

____________________ or any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.

Signature/Date ENCLOSURE 4

2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration.

If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.

3. The following format should be used for submittal of specific comments:
a. Listing of NRC question, answer and reference
b. Facility comment/recommendation
c. Reference (to support facility comment)

NOTES: 1. No change to the examination will be made without a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.

2. Comments made without a concise facility recommendation will not be addressed.
3. A two-hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.