Hurricane Matthew
Jump to navigation
Jump to search
6 October 2016
- See also: Hurricane
Scrams (0)
General
Start date | Site | Title | |
---|---|---|---|
NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes | 31 May 2023 | NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes | |
ML19191A252 | 9 July 2019 | Robinson | NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Robinson Flooding Integrated Assessment Dated December 19, 2018 |
ML18183A016 | 21 June 2018 | Turkey Point | 2018-06-21 - Comment a E-mail Regarding Tp 3&4 Slr EIS Scoping_Redacted |
ML18183A028 | 21 June 2018 | Turkey Point | 2018-06-21 - Comment C E-mail Regarding Tp 3&4 Slr EIS Scoping - Redacted |
IR 05000335/2018010 | 20 June 2018 | Saint Lucie | Nuclear Regulatory Commission Problem Identification and Resolution Inspection Report 05000335/2018010 and 05000389/2018010 |
ML18065A196 | 28 February 2018 | Millstone Kewaunee Surry North Anna 07200002 07200055 | Submission of Annual Financial Report and Nuclear Liability Insurance Endorsements |
ML18113A145 | 31 January 2018 | Turkey Point | Appendix E, Applicant'S Environmental Report Subsequent Operating License Renewal Stage (Public Version) |
ML18037A836 | 31 January 2018 | Turkey Point | Appendix E - Turkey Point Nuclear Plant Units 3 and 4 Environmental Report Subsequent Operating License Renewal Stage |
ML19008A410 | 31 December 2017 | Clinch River | Usgcrp 2017: Climate Science Special Report: Fourth National Climate Assessment Vol 1 |
ML20311A366 | 6 November 2017 | Surry | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000261/2017001 | 5 May 2017 | Robinson | NRC Integrated Inspection Report 05000261/2017001 |
HNP-17-024, Annual Environmental (Nonradiological) Operating Report | 28 April 2017 | Harris | Annual Environmental (Nonradiological) Operating Report |
L-2017-078, Annual Environmental Operating Report, 2016 | 26 April 2017 | Saint Lucie | Annual Environmental Operating Report, 2016 |
L-2017-053, Annual Radiological Environmental Operating Report for Calendar Year 2016 | 17 April 2017 | Saint Lucie | Annual Radiological Environmental Operating Report for Calendar Year 2016 |
ML17088A184 | 28 March 2017 | North Carolina State University | North Carolina State University - Annual Report for 2016 |
ML17079A214 | 3 March 2017 | Oconee | Final After Action Report, Radiological Emergency Preparedness Exercise, Exercise Date: December 13, 2016 |
IR 05000324/2016004 | 9 February 2017 | Brunswick | NRC Integrated Inspection Report 05000325/2016004 and 05000324/2016004 |
IR 05000395/2016004 | 8 February 2017 | Summer | NRC Integrated Inspection Report 05000395/2016004 |
IR 05000424/2016004 | 7 February 2017 | Vogtle | NRC Integrated Inspection Report 05000424/2016004 and 05000425/2016004 and Followup Assessment Letter |
IR 05000280/2016004 | 1 February 2017 | Surry | NRC Integrated Inspection Report 05000280/2016004 and 05000281/2016004 |
IR 05000321/2016004 | 31 January 2017 | Hatch | NRC Integrated Inspection Report 05000321/2016004 and 05000366/2016004 |
IR 05000400/2016004 | 27 January 2017 | Harris | NRC Integrated Inspection Report 05000400/2016004 |
IR 05000261/2016004 | 24 January 2017 | Robinson | NRC Integrated Inspection Report 05000261/2016004 |
IR 05000335/2016004 | 18 January 2017 | Saint Lucie | NRC Integrated Inspection Report 05000335/2016004 and 05000389/2016004 |
05000281/FIN-2016004-02 | 31 December 2016 23:59:59 | Surry | Inadequate Design Change Post Maintenance Testing Causes Water Intrusion into Station Service Transformer and a Reactor Trip |
ML17024A036 | 31 December 2016 | Beaver Valley Browns Ferry Byron Arkansas Nuclear Braidwood Brunswick Bellefonte | Operating Data Report for 2016 |
05000400/LER-2016-005 | 8 October 2016 7 December 2016 | Harris | Offsite Power Undervoltage Caused Actuation of Several Systems LER 16-005-00 for Shearon Harris Nuclear Power Plant, Unit 1 Regarding Offsite Power Undervoltage Caused Actuation of Several Systems |
05000281/LER-2016-001 | 9 October 2016 2 December 2016 | Surry | Unit 2 Reactor Trip due to Generator Differential Lockout LER 16-001-00 for Surry Power Station, Unit 2, Regarding Reactor Trip Due to Generator Differential Lockout |
ML16306A469 | 28 October 2016 | Harris Saint Lucie Brunswick Robinson | (1) FEMA Cover Letter (10-28-16) - Post Hurricane Matthew Disaster Initiate Review Findings |
L-2016-191, Environmental Protection Plan Report for 10/09/2016 Unusual or Important Environmental Event - Turtle Mortality | 24 October 2016 | Saint Lucie | Environmental Protection Plan Report for 10/09/2016 Unusual or Important Environmental Event - Turtle Mortality |
ENS 52291 | 8 October 2016 17:28:00 | Harris | Unusual Event Declared Due to Loss of Offsite Power |
ML16281A591 | 7 October 2016 | Saint Lucie | PNO--II-16-002A, St. Lucie, Units 1 and 2: Update - Shutdown Greater than 72 Hours Due to Natural Phenomena (Hurricane Matthew) |
ML16281A506 | 6 October 2016 | Saint Lucie | PNO-16-002, St. Lucie, Units 1 and 2, Shutdown Greater than 72 Hours Due to Natural Phenomena (Hurricane Matthew) |
Press Release-II-16-035, NRC Preparing for Hurricane Matthew | 6 October 2016 | Saint Lucie Brunswick Turkey Point 07001113 | Press Release-II-16-035: NRC Preparing for Hurricane Matthew |