Application for Amends to Licenses DPR-24 & DPR-27, Consisting of Tech Spec Change Request 139,clarifying Limiting Conditions for Operation of Safety Injection Accumulators
ML20043D278
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/01/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043D282 List:
References
CON-NRC-90-053, CON-NRC-90-53 VPNPD-90-262, NUDOCS 9006070326
Download: ML20043D278 (3)


Text

_ _

J-i : . , ;g

  • i*; ,

WIS000 Sin

? 1 Electnc

- POWER COMPANY 231 w uchgart RO Box 2045. Mdwoukee. WI 532ca (4u)2212345 E LVPNPD-90-262' 10 CFR 50'.59, 50.90 i NRC-90-053 '

June.1,;1990.

U. S. NUCLEAR REGULATORY COMMISSION

-Document' Control Desk Mail Stop P1-137 Washington, D. C. 20555 Gentlemen:

y DOCKETS'50-266 AND 50-301 I 4 TECHNICAL SPECIFICATION CHANGE REOUEST 139 SAFETY INJECTION ACCUMULATQB LIMITING CONDITIONS FOR OPERATION  ;

' POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 In accordance with the: requirements of 10 CFR 50.59(c) and.10 CFR

_ 50.90,1 Wisconsin Electric Power Company (Licensee) requests an amendment to Facility Operating Licenses DPR-24 and DPR-27 for ,

Point' Beach Nuclear Plant, Units.1 und 2 respectively. This ]

amendment request includes proposed changes to the Point Beach j ~

_ Technical Specifications which will clarify the limiting condition for: operation of safety injection accumulators in

_ Specification 15.3.3.A.2 and add an example of the application of this limiting condition for operation to_the bases-for

' Specification 15.3.3..lA change is also proposed.to correct a reference in the bases'to Specification 15.3.0.A. Technical Specification pages with the-proposed changes identified by.

margin bars in the right-hand margin are attached. A discuscion of the changes follows.

During evaluation of a recent event detailed in LER-89-003-00 dated August 9, 1989 for Point Beach Nuclear Plant,= Unit 2, in a which the accumulators were cross-connected through their fill '

and vent lines in order to regain level indication on one of the accumulators following a level instrument failure, we determined

'that cross-connecting the-accumulators may limit the water

. available'for injection during a LOCA resulting from a cold leg break. The LOCA analysis for the Point Beach Nuclear Plant assumesLthat in the event of a cold leg break, the accumulator on the faulted loop injects directly to containment via the pipe break while the accumulator on the non-faulted loop injects to 900'6070326 900601 PDR P- ADOCK 05000266-ppc h

a mmm-anan

'Q ..

.9-

'NRC Document Control Desk-

- June 1, 1990 Page 2 the_ reactor core. In-the event of a cold leg break with accumulators cross-connected, assuming reactor system pressure prevents injection into the non-faulted loop, water and gas will

, flow from the accumulator on the non-faulted loop to the accumulator on the faulted loop. This limits the water available for injection into the reactor core from the accumulators. Thus,

[' cross-connecting accumulators results in one accumulator being L

potentially inoperable and unable to perform its design function in the event of a LOCA resulting from a cold leg break.

' Point Beach Technical Specification 15.3.3.A.2.a presently allows an accumulator to be isolated for up to one hour for a check n valve leakage check. Since isolation of an accumulator will.

prevent it from injecting during a LOCA, the accumulator is

[ inoperable for the time the accumulator is isolated. This m situation bounds the case where accumulators are cross-connected.

We, therefore, propose to modify Technical Specification 15.3.3.A.2.a to include a one-hour limiting condit;an for

' operation anytime an accumulator is determined to be inoperable for any reason. This one-hour limit is consistent with the standard Technical Specifications and the bases to Technical Specification 15.3.0, which implies that the one-hour limit for isolating an accumulator also applies to anytime an accum.!ab.r is considered inoperable.

__ The bases for Technical Specification 15.3.3 have been mcdified to include an example application of a Limiting Condition for Operation using Specification 15.3.3.A.2.a.

The bases for Technical Specification 15.3.0 A incorrectly references Technical Specification 15.3.3.A.2.e for the limiting

~

P condition for operation related to the safety injection accumulators.- This reference should be changed to 15.3.3.A.2.a.

Specification 15.3.3.a.2.e was renumbered by Amendments 66 and 71 to DPR-24 and DPR-27 respectively.

We have evaluated the' changes proposed in this amendment application in accordance with the requirements of 10 CFR 50.91(a) using the standards in 10 CFR 50.92 and have determined that the changes do not result in a significant hazards consideration. A proposed amendment does not result in a significant hazards consideration if operation of the facility in accordance with the proposed amendment does not (1) involve a significant increase in the probability or consequences of an

=- accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.- The modification to the limiting condition for operation r-_

I t,

'kl  :$

d' r Do'cument Control Desk

June-1, 1990 page 3 of the> safety injection accumulators to= include anytime an ,

accumulator is inoperable imposes an additional limitation or NRC restriction.not presently included in the Technical

. Specifications. The addition of an example to the bases is administrative and does not change the meaning or intent of the bases or specification. The correction of the reference in the

. bases is for consistency only and is, therefore, purely administrative. These are examples of amendments not likely to involve a significant hazards consideration as provided in the statement of consideration published at 51 FR 7744. +

if you have any questions regarding this proposed change, please contact us.

Very truly your ,

/

f ff/O '

C. w. ay l Vice President L Nuclear Power Enclosures

(

Copies'to NRC Regional Administrator, Region III NRC Resident Inspector Subscribed and sworn to before me this I #5 day of % ne_ , 1990.

,0 ) x %c Notary Public, State'bf Wisconsin My Commission expires dI*SL1- 97.

._ _ _ _ _ _ _ ._