Category:REFERENCE SAFETY ANALYSIS REPORT & AMENDMENTS (RSAR)
MONTHYEARML20077G7321983-07-22022 July 1983 Amend 19 to GESSAR-II ML20077B6961983-07-18018 July 1983 Amend 18 to GESSAR-238 ML20072H5101983-06-15015 June 1983 Nonproprietary Amend 16 to GESSAR-II,providing Assessment of Design Features Which Reduce Sabotage Risk ML20072H5301983-06-15015 June 1983 Amend 17 to GESSAR-II,furnishing New App 1G & Revised Section 1.8 & Clarifying Discrepancies in Text ML20071N5681983-05-24024 May 1983 Amend 15 to GESSAR-II ML20064G4021982-12-21021 December 1982 Nonproprietary Version of Amend 12 to Gessar II ML20066J5171982-11-0808 November 1982 Amend 9 to GESSAR-II ML20065N3391982-09-23023 September 1982 Amend 7 to Gessar II ML20063L5181982-08-31031 August 1982 Amend 6 to Gessar ML20058G5531982-07-30030 July 1982 Amend 5 to Gessar II ML20052G2171982-03-19019 March 1982 Nonproprietary Version of Amend 2 to Application for Final Design Approval Review of 238 Nuclear Island Gessar II Containing Probabilistic Risk Assessment ML20049H2741982-02-12012 February 1982 App 3G to Gessar, Pipe Failure Analysis. ML20049H2641982-02-12012 February 1982 Chapter 1 to Gessar, Introduction & General Description of Plant. ML20049H2651982-02-12012 February 1982 Chapter 2 to Gessar, Site Characteristics. ML20049H2671982-02-12012 February 1982 App 3A to Gessar, Seismic Soil Structure Interaction Analysis of Nuclear Island. ML20049H2691982-02-12012 February 1982 App 3C to Gessar, Computer Programs Used in Design of Seismic Category I Structures. ML20049H2701982-02-12012 February 1982 App 3D to Gessar, Analysis of Recirculation Motor & Pump Under Accident Conditions. ML20049H2711982-02-12012 February 1982 App 3E to Gessar, Description of Safety-Related Mechanical & Electrical Equipment. ML20049H2731982-02-12012 February 1982 App 3F to Gessar, Dynamic Buckling Criteria for Containment Vessel. ML20049H2751982-02-12012 February 1982 App 3H to Gessar, Effect of Concrete Annulus Below Elevation (-) 5 ft,3 Inches,On Seismic Design Loads & Bldg Responses. ML20049H2851982-02-12012 February 1982 Chapter 10 to Gessar, Steam & Power Conversion Sys. ML20049H2941982-02-12012 February 1982 Chapter 17 to Gessar, Qa. ML20049H2931982-02-12012 February 1982 Chapter 16 to Gessar, Tech Specs. ML20049H2921982-02-12012 February 1982 App 15B to Gessar, BWR/6 Generic Rod Withdrawal Error Analysis. ML20049H2911982-02-12012 February 1982 App 15A to Gessar, Plant Nuclear Safety Operational Analysis. ML20049H2901982-02-12012 February 1982 Chapter 15 to Gessar, Accident Analysis. ML20049H2891982-02-12012 February 1982 Chapter 14 to Gessar, Initial Test Program. ML20049H2881982-02-12012 February 1982 Chapter 13 to Gessar, Conduct of Operations. ML20049H2871982-02-12012 February 1982 Chapter 12 to Gessar, Radiation Protection. ML20049H2861982-02-12012 February 1982 Chapter 11 to Gessar, Radwaste Mgt. ML20049H2841982-02-12012 February 1982 App 9A to Gessar, Fire Hazard Analysis. ML20049H2831982-02-12012 February 1982 Chapter 9 to Gessar, Auxiliary Sys. ML20049H2821982-02-12012 February 1982 Chapter 8 to Gessar, Electric Power. ML20049H2801982-02-12012 February 1982 App 6A to Gessar, Improved Decay Heat Correlation for LOCA Analysis. ML20049H2791982-02-12012 February 1982 Chapter 6 to Gessar, Esfs. ML20049H2781982-02-12012 February 1982 Chapter 5 to Gessar, RCS & Connected Sys. ML20049H2771982-02-12012 February 1982 App 4A to Gessar, Control Rod Patterns & Associated Power Distribution for Typical Bwr. ML20049H2761982-02-12012 February 1982 Chapter 4 to Gessar, Reactor. ML20039D9991981-12-14014 December 1981 Nonproprietary Version of Amend 3 to Gessar II ML19343B1731980-12-0202 December 1980 Amend 1 to GESSAR-II ML20147J3401978-12-21021 December 1978 Amend 47 to Appl for Extension of GESSAR-238 Nuc Island, Consisting of Replacement Pages W/Corrected Rev ML20148T5031978-11-30030 November 1978 Amend 46 to Appl for Extension of GE Standard Safety Analysis Rept-238 Nuc Island,Consisting of Append C & Assessment of 238 Island Design Against Category 1,2,3 & 4 Matters Approved by NRC Since 740301 1983-07-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20199B0731986-05-31031 May 1986 Safety Evaluation Report Related to the Design Approval of the Gessar II BWR/6 Nuclear Island Design.Docket No. 50-447. (General Electric Company) ML20155G1061986-04-25025 April 1986 Nonproprietary Rev 21 to Amend 21 to Gessar II,238 Nuclear Island ML20132F7131985-07-31031 July 1985 Safety Evaluation Report Related to Final Design Approval of the Gessar II BWR/6 Nuclear Island Design.Docket No. 50-447.(General Electric Company) ML20117J6531985-04-30030 April 1985 Generic Emergency Response Info Sys (Basic Rtad) Software Validation ML20126E0191985-04-0404 April 1985 Response to Gessar Source-Term Issue 9:Suppression Pool Bypass in Bwrs ML20108F2611985-02-28028 February 1985 Addendum 1 to Power Generation Control Complex Design Criteria & Safety Evaluation ML20126D2841985-02-15015 February 1985 Rev 2 to GESSAR-II App 15.D.3,BWR/6 PRA, GESSAR-II App C, Event Trees & GESSAR-II App D,Fault Trees ML20090E1491984-07-12012 July 1984 Gessar II External Event Risk ML20093F5321984-06-30030 June 1984 Resolution of Applicable Unresolved Safety Issues & Generic Issues for Gessar II ML20126D3121983-12-29029 December 1983 Marked-up Pages to GESSAR-II Seismic Event Uncertainty Analysis, Forwarded W/Jf Quick to DG Eisenhut ML20126D3041983-11-17017 November 1983 Marked-up Pages to GESSAR-II Internal Event PRA Uncertainty Analysis Forwarded W/ Jf Quick to DG Eisenhut ML20126J1151983-11-17017 November 1983 Pages 2-7 - 2-16 of GESSAR-II Internal Event PRA Uncertainty Analysis.Portions Deleted ML20126D2871983-11-0707 November 1983 Sanitized Pages 2-17 & 2-18 to GESSAR-II Fire & Flood External Event Analysis Forwarded by Jf Quirk to DG Eisenhut ML20112F9671983-10-24024 October 1983 Speech Entitled, Aerosol Instrumentation for Marviken Aerosol Transport Tests Presented at 830915-16 Conference. Viewgraphs from Ge/Nrc 840320 Meeting Encl ML20126D2991983-09-21021 September 1983 Sanitized Pages to GESSAR-II Seismic Event Analysis Forwarded W/Jf Quirk to DG Eisenhut ML20080C1211983-07-31031 July 1983 Rev 0 to Confirmatory Soil-Structure Interaction Analyses for GESSAR-II ML20077G7321983-07-22022 July 1983 Amend 19 to GESSAR-II ML20077B6961983-07-18018 July 1983 Amend 18 to GESSAR-238 ML20072H5101983-06-15015 June 1983 Nonproprietary Amend 16 to GESSAR-II,providing Assessment of Design Features Which Reduce Sabotage Risk ML20072H5301983-06-15015 June 1983 Amend 17 to GESSAR-II,furnishing New App 1G & Revised Section 1.8 & Clarifying Discrepancies in Text ML20071N5681983-05-24024 May 1983 Amend 15 to GESSAR-II ML20064G4021982-12-21021 December 1982 Nonproprietary Version of Amend 12 to Gessar II ML20066J5171982-11-0808 November 1982 Amend 9 to GESSAR-II ML20065N3391982-09-23023 September 1982 Amend 7 to Gessar II ML20063L5181982-08-31031 August 1982 Amend 6 to Gessar ML20058G5531982-07-30030 July 1982 Amend 5 to Gessar II ML20052G2171982-03-19019 March 1982 Nonproprietary Version of Amend 2 to Application for Final Design Approval Review of 238 Nuclear Island Gessar II Containing Probabilistic Risk Assessment ML20049H2651982-02-12012 February 1982 Chapter 2 to Gessar, Site Characteristics. ML20049H2641982-02-12012 February 1982 Chapter 1 to Gessar, Introduction & General Description of Plant. ML20049H2671982-02-12012 February 1982 App 3A to Gessar, Seismic Soil Structure Interaction Analysis of Nuclear Island. ML20049H2941982-02-12012 February 1982 Chapter 17 to Gessar, Qa. ML20049H2931982-02-12012 February 1982 Chapter 16 to Gessar, Tech Specs. ML20049H2921982-02-12012 February 1982 App 15B to Gessar, BWR/6 Generic Rod Withdrawal Error Analysis. ML20049H2911982-02-12012 February 1982 App 15A to Gessar, Plant Nuclear Safety Operational Analysis. ML20049H2901982-02-12012 February 1982 Chapter 15 to Gessar, Accident Analysis. ML20049H2891982-02-12012 February 1982 Chapter 14 to Gessar, Initial Test Program. ML20049H2881982-02-12012 February 1982 Chapter 13 to Gessar, Conduct of Operations. ML20049H2871982-02-12012 February 1982 Chapter 12 to Gessar, Radiation Protection. ML20049H2861982-02-12012 February 1982 Chapter 11 to Gessar, Radwaste Mgt. ML20049H2851982-02-12012 February 1982 Chapter 10 to Gessar, Steam & Power Conversion Sys. ML20049H2841982-02-12012 February 1982 App 9A to Gessar, Fire Hazard Analysis. ML20049H2831982-02-12012 February 1982 Chapter 9 to Gessar, Auxiliary Sys. ML20049H2821982-02-12012 February 1982 Chapter 8 to Gessar, Electric Power. ML20049H2801982-02-12012 February 1982 App 6A to Gessar, Improved Decay Heat Correlation for LOCA Analysis. ML20049H2791982-02-12012 February 1982 Chapter 6 to Gessar, Esfs. ML20049H2781982-02-12012 February 1982 Chapter 5 to Gessar, RCS & Connected Sys. ML20049H2771982-02-12012 February 1982 App 4A to Gessar, Control Rod Patterns & Associated Power Distribution for Typical Bwr. ML20049H2761982-02-12012 February 1982 Chapter 4 to Gessar, Reactor. ML20049H2751982-02-12012 February 1982 App 3H to Gessar, Effect of Concrete Annulus Below Elevation (-) 5 ft,3 Inches,On Seismic Design Loads & Bldg Responses. ML20049H2741982-02-12012 February 1982 App 3G to Gessar, Pipe Failure Analysis. 1986-05-31
[Table view] |