Text
- - - -
11/7/83 Letter to D. G. Eisenhut from J. F. Quirk re:
GESSAR-II Fire and Flood External Event Analysis (81 pages)
~B506150012 850215 PDR FOIA CURRAN 84-A-66 PDR
hE GENERAL ELECTRIC COMPANY PROPRIETARY INFORMATION 2.5 Quantification of Fire-Induced Accident Sequences Table 2.5-1 presents the core damage contribution for each critical location.
-8 The total fire contribution to core damage frequency was found to be 7.5 x10 /yr which is 1.6 %of the total internal event core damage frequency (4.7x10-6),
1 sS 2-17 e
~----_
GENERAL ELECTRIC COMPANY PROPRIETARY INFORMATION l
2.o Release-Frequena 1.nt'jsis contribution to plant risk was calcu-The calculated fire-induced lated by summing over all release categories.
which isl.6 percent of the contribution to plant risk was 2.6 x 10' internal event plant risk.