ML18003B291

From kanterella
Revision as of 18:33, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info Re Phase I of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Info Addresses Specially Design Lifting Devices,Per SER Confirmatory Item 21
Date released: 08/31/2018 Download: ML18003B291


Rev 3 to Technical Support Mgt Procedure TMM-104, Determination of Technical & QA Requirements for Procurement Documents.
ML18003B296
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/14/1985
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003B296 (33)
Rev 2 to Procurement & Matl Control Procedure PMC-001, Procurement & Cataloging of Parts,Matl,Equipment & Svcs.
ML18003B295
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/09/1985
From: Gibson
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003B295 (58)
Rev 0 to Maint Mgt Procedure MMM-021, Marking, Identification,Procurement & Record Mgt of Hoisting Equipment & Rigging.
ML18003B294
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1984
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003B294 (15)
Rev 2 to Maint Mgt Procedure MMM-020, Operation Testing, Maint & Insp of Cranes & Matl Handling Equipment.
ML18003B292
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/21/1985
From: Campbell
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18003B292 (108)
Forwards Addl Info Re Phase I of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Info Addresses Specially Design Lifting Devices,Per SER Confirmatory Item 21
ML18003B290
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/02/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR
Download: ML18003B290 (6)