MONTHYEARML17241A4441999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A3521999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8421998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7461998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7421998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4601997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section ML17229A4321997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 ML17229A4211997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A1811996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits. ML17229A1591996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values ML17229A1171996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel ML17229A1071996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1041996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2401995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 ML17228B2431995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 ML17228B1871995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks ML17228B1771995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs ML17309A7921995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status ML17228B1451995-05-17017 May 1995 Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1421995-05-17017 May 1995 Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update ML17228B0881995-04-0303 April 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Incorporate line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 ML17228B0571995-02-27027 February 1995 Application for Amend to License NPF-16,modifying Surveillance Requirement 4.9.8.1 & 4.9.8.2 to Allow Reduction in Required Min Shutdown Cooling Flow Rate Under Certain Conditions During Operational Mode 6 ML17228B0501995-02-27027 February 1995 Application for Amend to License NPF-16,revising TS Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relay ML17228B0311995-02-22022 February 1995 Application for Amends to Licenses DPR-67 & NPF-16,deleting Refs to Automatic Tester for Containment Personnel Air Lock from TS 4.6.1.3 ML17228A9901995-01-20020 January 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Operability Requirements for Incore Detectors (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillances ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17228A9011994-11-0202 November 1994 Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17309A7511994-10-27027 October 1994 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes ML17228A6501994-07-28028 July 1994 Application for Amends to Licenses DPR-67,revising TS 3/4.4.13 to Incorporate LTOP Requirements Similar to LTOP Requirements Recommended by NRC Via GL 90-06,in Accordance W/Resolution of Generic Issue 94 ML17228A6571994-07-25025 July 1994 Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6541994-07-25025 July 1994 Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5751994-05-23023 May 1994 Application for Amend to License DPR-67,revising TS 3.5.2 for ECCS by Removing Option That Allows HPSI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-08-18
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17241A4441999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A3521999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8421998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7461998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7421998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4601997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section ML17229A4321997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 ML17229A4211997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A1811996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits. ML17229A1591996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values ML17229A1171996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel ML17229A1071996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1041996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2401995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 ML17228B2431995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 ML17228B1871995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks ML17228B1771995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs ML17309A7921995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status ML17228B1451995-05-17017 May 1995 Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1421995-05-17017 May 1995 Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update ML17228B0881995-04-0303 April 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Incorporate line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 ML17228B0571995-02-27027 February 1995 Application for Amend to License NPF-16,modifying Surveillance Requirement 4.9.8.1 & 4.9.8.2 to Allow Reduction in Required Min Shutdown Cooling Flow Rate Under Certain Conditions During Operational Mode 6 ML17228B0501995-02-27027 February 1995 Application for Amend to License NPF-16,revising TS Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relay ML17228B0311995-02-22022 February 1995 Application for Amends to Licenses DPR-67 & NPF-16,deleting Refs to Automatic Tester for Containment Personnel Air Lock from TS 4.6.1.3 ML17228A9901995-01-20020 January 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Operability Requirements for Incore Detectors (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillances ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17228A9011994-11-0202 November 1994 Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17309A7511994-10-27027 October 1994 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes ML17228A6501994-07-28028 July 1994 Application for Amends to Licenses DPR-67,revising TS 3/4.4.13 to Incorporate LTOP Requirements Similar to LTOP Requirements Recommended by NRC Via GL 90-06,in Accordance W/Resolution of Generic Issue 94 ML17228A6571994-07-25025 July 1994 Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6541994-07-25025 July 1994 Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5751994-05-23023 May 1994 Application for Amend to License DPR-67,revising TS 3.5.2 for ECCS by Removing Option That Allows HPSI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-08-18
[Table view] |
Text
,n t
)
t
(
,,REGULA ATaR INFORMATION DISTRIBUTION <TEM (BIDS' 1
ACCESSION"NBR: 8603060181 DOC. DATE: 86/02/28 NOTARIZED: YES FACIL: 50-335 St. Lucie Plant> Unit 1> Florida Power 5 Light Co.
AUTH. NAME AUTHOR AFFILIATION WOODY'. O. Fl or i da Power Zc Light Co.
RECIP. NAME RECIPIENT AFFlLIATION MIRAGLIAiF. J. Division of Pressurized Water Reactor Licensing 8 (post 8
SUBJECT:
Application for amend to License DPR-67'xtending OL expiration date from 100701 to 160301. Supporting info enc DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PWR-8 ADTS 1 0 PWR-8 PDS PD 01 5 5 PWR-8 EB 1 1 PWR-8 PEICSB 1 1 PWR-8 FOB 1 SELLS' ) 1 PWR-8 PEICSB 1 1 PWR-8 RSB 1 1 INTERNAL: ADM/LFMB 1 0 ELD/HDS2 1 0 NRR/DHFT/TSCB 1 1 NRR/GRAS 1 0 04 1 1 RGN2 1 EXTERNAL: 24X 1 1 EGSG BRUSKEi S 1' LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 p,a<', Hfg 7<g, 5 TOTAL NUMBER OF COPIEB REQUIRED: LTTR ~ ENCL'
Ã
t.4
(
( itlR> I'UJ'U44 '4'1KYuutAlihlht >'tM ('<~t']K>Haik v JTA ~l19aR U
hl
~ ~
'U 4>> ~
'I 4
4 Ur>> IU
~ ' 4 Utf, 'I 4 f'4'
.' Jl;.>
F
.f44<<'L tP >It ) ~ h It l"Ut it
'U
' 'UU 4t lt t UI + 44 %4 3'p44 S Itt
) j.34 4 U ~ ll "I4,4. l
~
Et t'.UI l'~J h
'f 3 ~
l/
h ~ 4 jt 4
~, hh jthll U
,'4 l 4 4
P OX 14000, JUNO BEACH, FL 33408 W.~ ~d ~ ~ o FLORIDA POWER & LIGHT COMPANY FEB 2 81S88 L-86-66 Office of Nuclear Reactor Regulation Attention: Mr. Frank J. Miraglia, Director Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Miraglia:
Re: St. Lucie Unit I Docket No. 50-335 Proposed License Amendment 0 eratin License Ex iration Date ln accordance with IO CFR 50.90, Florida Power & Light Company submits three signed originals and forty copies of a request to amend Facility Operating License DPR-67.
This amendment will extend the date of expiration of the St. Lucie Unit I operating license so that the forty year term begins with the date of issuance of the operating license rather than the date of issuance of the construction permit.
The term of the operating license of St. Lucie Unit I would be extended from July I, 20 I 0 to March I, 20 I 6. The proposed change is shown on the accompanying page 5 of the Operating License DPR-67. A discussion of the change is included in the attached safety evaluation/no significant hazards considerations determination.
The proposed amendment has been reviewed by the St. Lucie Plant Facility Review Group and the Florida Power & Light Company Nuclear Review Board.
A copy of the proposed amendment is being forwarded to the state designee for the State of Florida, in accordance with IO CFR 50.9I (b)(l). FPL Check No. 0520 is attached as remittance for the license amendment application fee as specified in IO CFR 170.2I.
Should you have any questions regarding this submittal, please feel free to contact Use Very truly yours,
/~~~I gA: de luau dgu7s-C. O. Woody i6 Group V esident 8go306018i 860228 t i Nuclear Energy pOR aOOCIIl, O50oo~~si P PDR~
COW/R JS/gp Attachments cc: Dr. J. Nelson Grace,USNRC, Region II Mr. Allan Schubert, Florida Department of Health & Rehabilitative Services Harold Reis, Esquire, Newman & Holtzinger RJS3/015/1 PEOPLE... SERVING PEOPLE
0 a .Jb VV f
I I' 'I I
t j \
A a
Ja t
Appendix'B to this license, the Environmental Technical Specificationsf contains requirements that implement these and other environmental conditions of this license. ~P+
Q Q
~~ This license is effective as of the date of issuance and shall p~ Rv.
I,ROIL.
'l k
~is= -" >
~ ~ gg'~W P
)
f FOR THE NUCLEAR. REGULATORY COMMISSION 4
':"" go-7 V
g Roger S. Boyd, Director Division of. Prospect Management Office of Nuclear Reactor Regulation
Enclosures:
- l. Incomplete Construction Items, Preoperational Tests, Startup Tests, and Other Items Vhich Must'e Completed
- 2. Appendices A 4 B-Technical Specifications Date of Issuance: h)AR 01 1Sl6
~ ~
r I
SAFETY EVALUATION NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION BACKGROUND The Atomic Energy Act of l954, as amended, specifies in Section l03 c. that a license shall be issued for a specified period of time, not exceeding forty years.
This limitation has been codified in 10 CFR 50.5 I.
Prior to l982, the Commission granted operating licenses to nuclear power reactors with the date of expiration linked to the issuance date of construction permits. This practice was modified in response to a request by Commonwealth Edison Company for the Commission to issue operating licenses (OL) for La Salle Units I & 2 for a full term of forty years beginning with the date of issuance of the operating licenses. This request was approved, and La Salle Unit I received an OL for forty years from the date of OL issuance in l982. In an August l6, l982 memorandum to the Commission, Mr. William Dircks elaborated on the new OL position and directed the staff to issue an OL for the term requested by the applicant, but in no case to exceed forty years from the date of issuance of the OL.
Other requests from utility applicants for forty year licenses, starting from the date of issuance of the license, have been granted for new plants. This includes Florida Power & Light Company St. Lucie Unit 2, which received a forty year license beginning with the issuance of the OL in I 983.
The Commission practice of granting effective forty year OLs has also, upon request by the licensee, been extended to plants licensed prior to I 982. Baltimore Gas & Electric Company requested a license amendment to change the OL expiration dates of its Calvert Cliffs Units I and 2 to extend the duration of both licenses to forty years from the date of issuance. The Commission granted this request and issued these amendments in mid I 985.
Florida Power & Light Company s St. Lucie Unit I license is similar to the Calvert Cliffs Units'icenses in that they were all licensed before l982 and their forty year lifetime originally started from the date of their construction permits. This amendment request for St. Lucie Unit I is to modify its license in the same manner that was granted to the Calvert Cliffs Units'icenses, that is, to extend the duration of the license to forty years by changing the license expiration date.
DISCUSSION The construction permit for St. Lucie Unit l was issued on July I, l970.
Construction activities were completed six years later and the Commission issued the operating license on March I, 1976. The license granted was for a term of forty years, commencing with the issuance of the construction permit.
Considering the time that was required for plant construction, the operating license was, in reality, for a term of'approximately thirty-four years, terminating in the year 20IO. This proposed license amendment is for a full forty year operating license term for St. Lucie Unit I beginning with the date of issuance of the OL and ending in the year 20I6.
R JS3/0 I 5/2
4I 4 ~ t I
ill
~ I ~ K I C t
~ / 4 t r I ~ ~
I ft 4 I M
"'d
'I 4
4 il, r A H
';;4 f. I I 4 /r'I 4
4', 4 It I /
~ 4 H
/ I' A I I
I 'I d A
,4", I. . 'I I I tWH P
r ~ . /ll
'I I
A li I 'A
"- 4 I 4 I
M /',' I 4
4
~ I II A
I M
4 M 'I It A M I HA 4 I
~ ~
I A 4 K I
~ ~ ~ VI I /4 4 ~
tr V ,t ~ I '4 I
4 I
A I' M
'I I/,V K 4
i ff I 4'W.d 4 V M
I A MA I I I 4
~ 'll I
I 4 V If "I
4 WA ~ . A I 4 I I 4 ~, <
Two requirements were identified in the policy established in the April 20, l985 memorandum from Hugh L. Thompson, Jr. to Harold R. Denton, for operating plants requesting a forty-year term starting from the date of the operating license. Florida Power Bc Light Company has determined that operation of St.
Lucie Unit 1 for forty years meets these two requirements in that (I) there is no significant impact on the final safety analysis report (FSAR) and (2) all environmental effects have been evaluated as addressed in the St. Lucie Unit I and Unit 2 Final Environmental Statements.
The Commission, by granting St. Lucie Unit I an operating license, had reviewed and determined that these two requirements were met for the approximately thirty-four years of operating life. All issues associated with extending the duration of the operating license to an effective duration of forty years were considered in the original design as defined in the FSAR and are the subject of these ongoing programs:
Mechanical Equipment - Inspection and testing in accordance with Section XI of the ASME Code and the Technical Specifications insure detection of unexpected degradation.
Electrical Equipment - Aging analyses have been performed for all safety-related electrical equipment in accordance with the requirements of IO CFR 50.49, identifying qualified lifetimes for this equipment.
These lifetimes are incorporated into plant equipment maintenance and replacement practices to ensure that all safety-related electrical equipment remains qualified and available to perform its safety function throughout a forty year lifetime.
Structures and Systems - The plant is designed for a forty year service life and incorporates features to facilitate inspections.
Reactor Pressure Vessel'- The design of the reactor vessel and its internals considered the effects of forty years of operation at full power with a plant capacity of 80% (32 effective full power years). Analyses have demonstrated that expected'cumulative neutron fluences will not be a limiting consideration. The RT (PTS) at the end of the 40 year operating life was calculated in accordance with the requirements of IO CFR 50.6I and found to be below the 50.6l screening criteria. In addition to these calculations, surveillance capsules placed inside the reactor vessel provide a means of monitoring the cumulative effects of power operation.
Based upon these programs and our evaluation of the potential impacts associated with this request, Florida Power & Light has determined that the proposed change does not pose any safety problems for the additional six years of operation requested in this amendment change.
Environmental impacts associated with a forty year license were originally evaluated in the St. Lucie Unit I Environmental Report. Since the publishing of this document, another evaluation of environmental impacts has been conducted for the St. Lucie site. The "Final Environmental Statement related to the operation of St. Lucie Plant, Unit No. 2" (NUREG-0842) was published in April l982 and assessed the environmental impacts of the operation of Unit 2 which began commercial operation in l 983. As stated earlier, the Commission evaluated R JS3/0 I 5/3
1 tl 1
I 1 lt 1 I 1
i I 4 I
r ~ II 4 I 4" I I h
I I, R
1 C
h I it I'4 4 4
lith II
'rh, 1 *rjj 4
I I I
'I '
1 II
, ',tlt, II 41 1 4 I
~ 1 1 ~ I 1
~
1 I tl hh, Jl I 1 lt 1
1 h
~,
1 1'
I
>I Ih
> 1.
4 I
~ I II 1
~ 4 t, i 4
h.",
h tl i 4 11
~ 1> I fh'h I 4
I
>I,,
A t
4 1 ~ 4 P 4
~ 4 4 h A Ih h ~ 1 I 1
t 1
4 4
'I I I ~ It I'
I I 1 h>tt ~
"'ll I Rt I tl "J
I 1 ~
A lt 1
I ~
Oh
~0 g ~
4 the environmental impacts and based upon its evaluation, granted a forty year operating license to Unit 2 beginning with the date of operation rather than the date of construction. Thus, the Commission has assessed that the environmental consequences and mitigation actions were acceptable to the year 2023. This date is approximately seven years beyond this request to amend the St. Lucie Unit I license to terminate on March I, 20I6. Therefore, the environmental impacts associated with the operation of St. Lucie Unit I for forty years are bounded by the St. Lucie Unit 2 evaluation and are acceptable.
CONCLUSION The proposed change to the Operating License does not involve an unreviewed safety question nor any significant hazards considerations because:
I. a. The probability of the occurrence of an accident previously evaluated in the FSAR has not been affected because the FSAR determination was based on the fact that a forty year life was considered during the design and construction of the plant.
- b. The consequences of an accident previously evaluated in the FSAR have not been adversely affected because they were determined based upon a forty year life.
- c. The probability of a malfunction of equipment important to safety
'reviously evaluated in the FSAR has not been reduced because the calculations for determining the probability were based upon a forty year life. All safety-related electrical equipment meet the Environmental Qualifications requirements of IO CFR 50.49.
- d. The consequences of a malfunction of equipment important to safety have not been changed because they were originally determined for a facility that would operate for forty years.
2i ao The possibility of an accident of a different type than analyzed in the FSAR has not been created because all the accidents analyzed were based upon a facility with an operating life of forty years.
- b. The possibility of a malfunction of equipment important to safety of a different type than any analyzed in the FSAR has not been created for the reason given in 2.a.
3o ao The margin of safety as defined in the basis for any Technical Specifications is not reduced by the proposed change. The length of the license does not affect any of the bases since any bases that relied on length of plant operation was calculated upon a forty year period of operation.
RJS3/OI5/4
~A M
A Np, A A P, A
W A W
~ I
~ ~ A I
p I
II P ~
A M
N A
N P ~
A W Iw A
STATE OF FLORIDA )
) ss.
COUNTY OF DADE )
~C.D.W d bi fi dt--,
- d That he is a Grou Vice President of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to, execute the document on behalf of said Licensee.
C. O. Woody Subscribed and sworn to before me this
~g, day'of Fwnn~~, t l9 F4
".J)~>*,
~bP~TARY',PUBLlC, in and for the County of Dade,'tate of Florida HOARY NNIC STATE OF FLORIDA QY COMMISSION EXPIPZS DEC 5 l084
)0NDED THRU GENERAL INs RANGE UN My Comm ssion expir s.
tT
'I ~f ~
'E
'I I'-,
II f,
e r 0 P Jp V1 p I II l 'I h
'