IR 05000245/2013403

From kanterella
Revision as of 07:58, 23 January 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000336-13-403, 05000423-13-403, 4/8/2013 - 4/12/2013; Millstone Power Station, Units 2 and 3, Identification and Resolution of Problems LETTER ONLY
ML13142A060
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/20/2013
From: Anthony Dimitriadis
Plant Support Branch 1
To: Heacock D A
Dominion Resources
References
IR-13-403
Download: ML13142A060 (4)


Text

May 20, 2013

Mr. David President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd. Glen Allen, VA 23060-6711

SUBJECT: MILLSTONE POWER STATION UNITS 2 AND 3 - NRC BASELINE SECURITY INSPECTION REPORT 05000336/2013403 AND 05000423/2013403

Dear Mr. Heacock:

On April 12, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Millstone Power Station, Units 2 and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 12, 2013, with Stephen E. Scace, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

One NRC identified finding of very low security significance (i.e., Green as determined by the Baseline Security Significance Determination Process) was identified during this inspection. The finding did not involve a violation of NRC requirements and the deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.

A cross-cutting aspect was assigned to the finding in the area Human Performance, Decision-Making [H.1 (a)]. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I and the NRC Resident Inspector at Millstone Power Station, Units 2 and 3.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR §2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold From Public Disclosure Under 10 CFR §2.390" in accordance with 10 CFR §2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/

Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-336, 50-423 License Nos. DPR-65, NPF-49

Enclosure:

Inspection Report 05000336/2013403 and 05000423/2013403

w/Attachment:

Supplemental Information (OUO-SRI)

cc w/encl; w/OUO-SRI: P. Baumann, Security Manager, Millstone Station E. Wilds, Jr., Ph.D., Director, State of Connecticut SLO J. Hauer, Commissioner, NY State Div. of Homeland Security and Emergency Services F. Murray, President & CEO, NY State Energy Research and Development Authority cc w/o enclosure: Distribution via ListServ