MONTHYEARML20056E5101993-08-11011 August 1993 Comment Opposing Proposed Rule 10CFR20 Re Radiological Criteria for Decommissioning ML20059P0531990-10-15015 October 1990 Comment Opposing Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal IR 05000358/19820101986-06-24024 June 1986 Applicant Exhibit A-49,consisting of Forwarding Partially Withheld Safety Insp Rept 50-358/82-10 on 820607- 0818 (Ref 10CFR2.790) & Notice of Violation ML20129A3751985-05-16016 May 1985 Order Revoking CPPR-88,based on Util 840127 Plan to Convert Facility to Coal Fuel ML20133N3621985-03-14014 March 1985 Unexecuted Amend 3 Terminating Indemnity Agreement B-85 ML20094C3571984-08-0202 August 1984 Transmittal of Info Re Util 840320 Motion for Withdrawal of OL Application.Fuel Removed from Site,Steam Supply Sys Modified & CRD Mechanisms Removed.Certificate of Svc Encl ML20087H7881984-03-20020 March 1984 Motion Requesting Issuance of Order Authorizing Withdrawal of Application.Plant Will Be Used as Part of New Fossil fuel-fired Electric Generating Plant.Certificate of Svc Encl ML20087N2281984-03-0101 March 1984 Endorsement 25 to Nelia Policy NF-249 ML20079F8181984-01-16016 January 1984 Response Opposing Miami Valley Power Project 831231 Proposed Issues & Support for Contentions Re Qa.Issues Not Specific or Litigable.Certificate of Svc Encl ML20083J5321983-12-31031 December 1983 Proposed Issues & Prospective Witnesses Supporting Miami Valley Power Project Proposed Contentions Re Qa,Character & Competence.Certificate of Svc Encl ML20079H6901983-12-14014 December 1983 Petition Per 10CFR2.206 to Defer Judgment or Decision on Proposed Course of Action for Completion of Facility Until Suppl Created for Record of J Keppler 831215 Briefing.W/O Encls ML20082P8501983-12-0606 December 1983 Response Opposing City of Mentor 831115 Memorandum in Support of NRC 831031 Motion to Defer Rulings on Miami Valley Power Project Motion to Reopen Record.Motion W/O Merit.Certificate of Svc Encl.Related Correspondence ML20082M5791983-12-0202 December 1983 Response Opposing Applicant 831115 Answer to NRC 831031 Motion to Defer Ruling on Petition for Reconsideration & Motion for Leave to File Addl Evidence Prior to 831215 Conference of Counsel.Certificate of Svc Encl ML20082L0991983-11-30030 November 1983 Memorandum in Support of City of Mentor Motion to Further Defer Rulings Until Completion of Investigation Into Matl False Statements by NRC & Applicants.Certificate of Svc Encl ML20082D6991983-11-15015 November 1983 Memorandum in Support of NRC Motion to Defer Rulings on Miami Valley Power Project Motion to Reopen & City of Mentor Motion to Further Defer Rulings Until Completion of Investigation.Certificate of Svc Encl ML20081M7951983-11-15015 November 1983 Answer Opposing NRC Motion to Defer Rulings on Miami Valley Power Project (MVPP) 831003 Motion to Reopen Record.Decision Should Not Be Deferred to Await Completion of Investigation. Certificate of Svc Encl ML20085K7841983-10-18018 October 1983 Answer Opposing Miami Valley Power Project 831003 Petition for Reconsideration of ASLB 830915 Memorandum & Order Denying Project Motion to Reopen Record to Admit Eight Late Filed Contentions on Qa.Certificate of Svc Encl ML20078K5621983-10-13013 October 1983 Memorandum in Support of Miami Valley Power Project (MVPP) Petition for Reconsideration of ASLB 830915 Order.Mvpp Urges ASLB to Address Stds for Reopening Record.Issues Should Be Included to Ensure Complete Record.Certificate of Svc Encl ML20078F9641983-10-0606 October 1983 Notification to Commission of Miami Valley Power Project Misrepresentation in 831003 Motion for Reconsideration of ASLB 830915 Order.No Util Counsel Communicated W/Govt Accountability Project.Certificate of Svc Encl ML20078F8891983-10-0606 October 1983 Notice of Jh Laverty Employment W/Conner & Wetterhahn,Pc. Laverty Will Not Participate in Matters Leading to OL Issuance Due to Previous Employment W/Commissioner Roberts. Certificate of Svc Encl ML20078F8751983-10-0606 October 1983 Notice of Jh Laverty Employment W/Conner & Wetterhahn,Pc. Previous Employment W/Commissioner Roberts Eliminates Any Contribution to Zimmer Case ML20080P0771983-10-0303 October 1983 Motion for Extension to File Appeal Until 10 Days After Svc of ASLB Decision on Miami Valley Power Project Petition for Reconsideration.Certificate of Svc Encl ML20080P0141983-10-0303 October 1983 Petition for Reconsideration of ASLB 830915 Order Denying Miami Valley Power Project Motion to Reopen Record for Admission of Eight Proposed Contentions.Addl Info Provided Since Original Decision.Certificate of Svc Encl ML20080P0481983-09-26026 September 1983 Affidavit of T Devine Summarizing 830919 Discussion W/ C Weaver Re Summary of Interview in Torrey Pines Rept. Weaver Seriously Challenges Completeness of Interview Summary ML20080P0291983-09-26026 September 1983 Affidavit of D Jones for Govt Accountability Project Protesting Torrey Pines Rept Chapter on Cases Studies.Ref to Author Interviews Incomplete & Thus Inaccurate.Analysis of Whistleblower Missed Real Problem of Lack of Freedom ML20080P0671983-09-24024 September 1983 Affidavit of R Reiter for Govt Accountability Project Expressing Dissatisfaction of W/Summarized Interview in Torrey Pines Rept ML20080F2451983-09-13013 September 1983 Memorandum Supporting Miami Valley Power Project 830603 Motion to Reopen Record for Admission of Eight Contentions. Torrey Pines Mgt Review & NRC Repts Confirm Project Substantially Correct on Qa.Certificate of Svc Encl ML20080E6921983-09-12012 September 1983 Answer Opposing Miami Valley Power Project 830826 Motion for Leave to Submit New Documents & for ASLB Review of Pending Investigations.Motion Unjustified Attempt to Bend Rules on Late Contentions.W/Certificate of Svc ML20080D2791983-08-26026 August 1983 Motion for Leave to Submit New Evidence in Support of 830603 Proposed Contentions & for ASLB Review of Significant Pending Investigations.Certificate of Svc Encl ML20080C7171983-08-25025 August 1983 Answer Opposing Miami Valley Power Project 830811 Motion for Leave to File Reply Brief to Util & NRC Answers to Project 830712 Motion to Compel Discovery.Project Had Opportunity to Brief Issue in Original Motion.Certificate of Svc Encl ML20076A6451983-08-15015 August 1983 Notice of Substitution of Counsel for Amicus Curiae Brief & Appearance Before Aslb.Certificate of Svc Encl ML20024E5591983-08-11011 August 1983 Motion for Leave to File Reply Brief to Applicant & NRC 830803 & 01,respectively,answers Opposing Miami Valley Power Project Motion to Compel Discovery.Assertion of Boundary on Discovery Should Be Briefed.Certificate of Svc Encl ML20024E3941983-08-0505 August 1983 Motion for Leave to File Reply Brief & for Clarification of Responsibility to Duplicate Previous Analysis & Evidentiary Submissions.Util Challenge Frivolous,Heavy on Chutzpah & Deficient on Common Sense.Certificate of Svc Encl ML20077L5161983-08-0303 August 1983 Response Opposing Miami Valley Power Project 830707 Reply Brief Supporting Project 830603 Motion to Reopen Record.Aslb Lacks Jurisdiction to Hear Motion to Reopen to Admit Eight late-filed Contentions.Certificate of Svc Encl ML20024D1381983-07-27027 July 1983 Answer Opposing Miami Valley Power Project 830712 Motion for Protective Order to Withhold Identity of Persons Upon Whose Allegations Project Relied in Seeking to Reopen Record.Motion W/O Merit.Certificate of Svc Encl ML20024D1261983-07-27027 July 1983 Answer Opposing Miami Valley Power Project 830712 Motion to Reopen Record for Admission of Eight QA Contentions. Motion Actually Is Untimely Appeal from Earlier ASLB Rulings.Relief Sought Contrary to Commission Orders ML20024D1171983-07-27027 July 1983 Answer Opposing Miami Valley Power Project 830712 Motion to Defer Ruling on Review of ALAB-727 Pending Ruling on Motions to Reopen.No Justification Given to Delay Review for Unrelated Matters ML20080A2721983-07-21021 July 1983 Response to Applicant Motion for Leave to Respond to Miami Valley Power Project Reply Brief.Applicant Should Respond Only to Substance of Proposed Contentions Re QA Program Inadequacy.Certificate of Svc Encl ML20076L4691983-07-15015 July 1983 Motion for Leave to Respond by 830729 to Miami Valley Power Project (MVPP) Reply Brief Re Applicant Opposition to Eight QA Contentions.Mvpp Reply Distorts Record & Applicant Position.Certificate of Svc Encl ML20072N4501983-07-12012 July 1983 Reply Brief Supporting Miami Valley Power Project 830603 Motion to Reopen Record for Admission of Eight Contentions on QA & Corporate Character & Competence & Motion to Compel Discovery on Contentions ML20072N4631983-07-12012 July 1983 Motion to Reopen Record for Admission of Eight Contentions on QA & Corporate Character & Competence.Aslab Has Jurisdiction Even If ASLB Lacks Jurisdiction to Reopen Record ML20072N4741983-07-12012 July 1983 Motion to Defer Ruling on Whether to Review ALAB-727 Until ASLB & Aslab Rule on Miami Valley Power Project 830603 & 0712 Motions to Reopen Record to Admit Contentions on QA & Character & Competence,Or Alternatively,To Reopen Record ML20072N4901983-07-12012 July 1983 Motion for Protective Order to Shield Identity of Affiants Providing Portion of Basis for Miami Valley Power Project Eight Proposed Contentions.Certificate of Svc Encl ML20072K7331983-07-0101 July 1983 Answer Opposing Miami Valley Power Project 830629 Motion for Leave to File Reply Brief to Util & NRC Answers to Project 830603 Motion to Reopen Record.No Purpose Would Be Served by Permitting Redundant Discussion.Certificate of Svc Encl ML20024B0591983-06-29029 June 1983 Motion for Leave to File Reply Brief,By 830706,to NRC & Util 830630 Answers to Miami Valley Power Project 830603 Motion to Reopen Record to Admit Eight Contentions on QA & Util Character & Competence.Certificate of Svc Encl ML20072F4481983-06-22022 June 1983 Memorandum Supporting Miami Valley Power Project 830602 Motion to Reopen Record to Admit Eight Contentions on QA & Lack of Corporate Character & Competence.Reopening Necessary to Foster Public Confidence in Nrc.W/Certificate of Svc ML20024A6661983-06-20020 June 1983 Response Opposing Motions to File Amicus Curiae Brief in Support of Miami Valley Power Project Motion to Reopen Record for Admission of Eight QA Contentions.Certificate of Svc Encl ML20024A6621983-06-20020 June 1983 Response Opposing Miami Valley Power Project 830603 Motion to Reopen Record for Admission of Eight QA Contentions. Motion Untimely ML20076J1201983-06-16016 June 1983 Petition for Leave to File Amicus Curiae Brief Re Miami Valley Power Project Motion to Reopen Record to Admit Eight Contentions on QA & Character & Competence.Requests Extension of Time.Certificate of Svc Encl ML20076J1361983-06-16016 June 1983 Ohio Sierra Club Amicus Curiae Brief Supporting Miami Valley Power Project Motion to Reopen Record to Admit Eight Contentions.Contentions Provide Evidence That QA Problems Exist.Certificate of Svc Encl 1993-08-11
[Table view] Category:PLEADINGS
MONTHYEARML20087H7881984-03-20020 March 1984 Motion Requesting Issuance of Order Authorizing Withdrawal of Application.Plant Will Be Used as Part of New Fossil fuel-fired Electric Generating Plant.Certificate of Svc Encl ML20079F8181984-01-16016 January 1984 Response Opposing Miami Valley Power Project 831231 Proposed Issues & Support for Contentions Re Qa.Issues Not Specific or Litigable.Certificate of Svc Encl ML20079H6901983-12-14014 December 1983 Petition Per 10CFR2.206 to Defer Judgment or Decision on Proposed Course of Action for Completion of Facility Until Suppl Created for Record of J Keppler 831215 Briefing.W/O Encls ML20082P8501983-12-0606 December 1983 Response Opposing City of Mentor 831115 Memorandum in Support of NRC 831031 Motion to Defer Rulings on Miami Valley Power Project Motion to Reopen Record.Motion W/O Merit.Certificate of Svc Encl.Related Correspondence ML20082M5791983-12-0202 December 1983 Response Opposing Applicant 831115 Answer to NRC 831031 Motion to Defer Ruling on Petition for Reconsideration & Motion for Leave to File Addl Evidence Prior to 831215 Conference of Counsel.Certificate of Svc Encl ML20082L0991983-11-30030 November 1983 Memorandum in Support of City of Mentor Motion to Further Defer Rulings Until Completion of Investigation Into Matl False Statements by NRC & Applicants.Certificate of Svc Encl ML20081M7951983-11-15015 November 1983 Answer Opposing NRC Motion to Defer Rulings on Miami Valley Power Project (MVPP) 831003 Motion to Reopen Record.Decision Should Not Be Deferred to Await Completion of Investigation. Certificate of Svc Encl ML20085K7841983-10-18018 October 1983 Answer Opposing Miami Valley Power Project 831003 Petition for Reconsideration of ASLB 830915 Memorandum & Order Denying Project Motion to Reopen Record to Admit Eight Late Filed Contentions on Qa.Certificate of Svc Encl ML20078K5621983-10-13013 October 1983 Memorandum in Support of Miami Valley Power Project (MVPP) Petition for Reconsideration of ASLB 830915 Order.Mvpp Urges ASLB to Address Stds for Reopening Record.Issues Should Be Included to Ensure Complete Record.Certificate of Svc Encl ML20080P0771983-10-0303 October 1983 Motion for Extension to File Appeal Until 10 Days After Svc of ASLB Decision on Miami Valley Power Project Petition for Reconsideration.Certificate of Svc Encl ML20080P0141983-10-0303 October 1983 Petition for Reconsideration of ASLB 830915 Order Denying Miami Valley Power Project Motion to Reopen Record for Admission of Eight Proposed Contentions.Addl Info Provided Since Original Decision.Certificate of Svc Encl ML20080F2451983-09-13013 September 1983 Memorandum Supporting Miami Valley Power Project 830603 Motion to Reopen Record for Admission of Eight Contentions. Torrey Pines Mgt Review & NRC Repts Confirm Project Substantially Correct on Qa.Certificate of Svc Encl ML20080E6921983-09-12012 September 1983 Answer Opposing Miami Valley Power Project 830826 Motion for Leave to Submit New Documents & for ASLB Review of Pending Investigations.Motion Unjustified Attempt to Bend Rules on Late Contentions.W/Certificate of Svc ML20080D2791983-08-26026 August 1983 Motion for Leave to Submit New Evidence in Support of 830603 Proposed Contentions & for ASLB Review of Significant Pending Investigations.Certificate of Svc Encl ML20080C7171983-08-25025 August 1983 Answer Opposing Miami Valley Power Project 830811 Motion for Leave to File Reply Brief to Util & NRC Answers to Project 830712 Motion to Compel Discovery.Project Had Opportunity to Brief Issue in Original Motion.Certificate of Svc Encl ML20024E5591983-08-11011 August 1983 Motion for Leave to File Reply Brief to Applicant & NRC 830803 & 01,respectively,answers Opposing Miami Valley Power Project Motion to Compel Discovery.Assertion of Boundary on Discovery Should Be Briefed.Certificate of Svc Encl ML20024E3941983-08-0505 August 1983 Motion for Leave to File Reply Brief & for Clarification of Responsibility to Duplicate Previous Analysis & Evidentiary Submissions.Util Challenge Frivolous,Heavy on Chutzpah & Deficient on Common Sense.Certificate of Svc Encl ML20077L5161983-08-0303 August 1983 Response Opposing Miami Valley Power Project 830707 Reply Brief Supporting Project 830603 Motion to Reopen Record.Aslb Lacks Jurisdiction to Hear Motion to Reopen to Admit Eight late-filed Contentions.Certificate of Svc Encl ML20024D1381983-07-27027 July 1983 Answer Opposing Miami Valley Power Project 830712 Motion for Protective Order to Withhold Identity of Persons Upon Whose Allegations Project Relied in Seeking to Reopen Record.Motion W/O Merit.Certificate of Svc Encl ML20024D1261983-07-27027 July 1983 Answer Opposing Miami Valley Power Project 830712 Motion to Reopen Record for Admission of Eight QA Contentions. Motion Actually Is Untimely Appeal from Earlier ASLB Rulings.Relief Sought Contrary to Commission Orders ML20024D1171983-07-27027 July 1983 Answer Opposing Miami Valley Power Project 830712 Motion to Defer Ruling on Review of ALAB-727 Pending Ruling on Motions to Reopen.No Justification Given to Delay Review for Unrelated Matters ML20080A2721983-07-21021 July 1983 Response to Applicant Motion for Leave to Respond to Miami Valley Power Project Reply Brief.Applicant Should Respond Only to Substance of Proposed Contentions Re QA Program Inadequacy.Certificate of Svc Encl ML20076L4691983-07-15015 July 1983 Motion for Leave to Respond by 830729 to Miami Valley Power Project (MVPP) Reply Brief Re Applicant Opposition to Eight QA Contentions.Mvpp Reply Distorts Record & Applicant Position.Certificate of Svc Encl ML20072N4501983-07-12012 July 1983 Reply Brief Supporting Miami Valley Power Project 830603 Motion to Reopen Record for Admission of Eight Contentions on QA & Corporate Character & Competence & Motion to Compel Discovery on Contentions ML20072N4631983-07-12012 July 1983 Motion to Reopen Record for Admission of Eight Contentions on QA & Corporate Character & Competence.Aslab Has Jurisdiction Even If ASLB Lacks Jurisdiction to Reopen Record ML20072N4741983-07-12012 July 1983 Motion to Defer Ruling on Whether to Review ALAB-727 Until ASLB & Aslab Rule on Miami Valley Power Project 830603 & 0712 Motions to Reopen Record to Admit Contentions on QA & Character & Competence,Or Alternatively,To Reopen Record ML20072N4901983-07-12012 July 1983 Motion for Protective Order to Shield Identity of Affiants Providing Portion of Basis for Miami Valley Power Project Eight Proposed Contentions.Certificate of Svc Encl ML20072K7331983-07-0101 July 1983 Answer Opposing Miami Valley Power Project 830629 Motion for Leave to File Reply Brief to Util & NRC Answers to Project 830603 Motion to Reopen Record.No Purpose Would Be Served by Permitting Redundant Discussion.Certificate of Svc Encl ML20024B0591983-06-29029 June 1983 Motion for Leave to File Reply Brief,By 830706,to NRC & Util 830630 Answers to Miami Valley Power Project 830603 Motion to Reopen Record to Admit Eight Contentions on QA & Util Character & Competence.Certificate of Svc Encl ML20072F4481983-06-22022 June 1983 Memorandum Supporting Miami Valley Power Project 830602 Motion to Reopen Record to Admit Eight Contentions on QA & Lack of Corporate Character & Competence.Reopening Necessary to Foster Public Confidence in Nrc.W/Certificate of Svc ML20024A6661983-06-20020 June 1983 Response Opposing Motions to File Amicus Curiae Brief in Support of Miami Valley Power Project Motion to Reopen Record for Admission of Eight QA Contentions.Certificate of Svc Encl ML20024A6621983-06-20020 June 1983 Response Opposing Miami Valley Power Project 830603 Motion to Reopen Record for Admission of Eight QA Contentions. Motion Untimely ML20076J1201983-06-16016 June 1983 Petition for Leave to File Amicus Curiae Brief Re Miami Valley Power Project Motion to Reopen Record to Admit Eight Contentions on QA & Character & Competence.Requests Extension of Time.Certificate of Svc Encl ML20076J1361983-06-16016 June 1983 Ohio Sierra Club Amicus Curiae Brief Supporting Miami Valley Power Project Motion to Reopen Record to Admit Eight Contentions.Contentions Provide Evidence That QA Problems Exist.Certificate of Svc Encl ML20024A0801983-06-10010 June 1983 Motion of Appalachia-Science for Extension to File Previously Submitted Amicus Curiae Brief Supporting Miami Valley Power Project Renewed Attempt to Obtain Hearing on Eight QA Contentions.Certificate of Svc Encl ML20024A0771983-06-10010 June 1983 Motion of Cumberland Chapter of Sierra Club for Extension to File Previously Submitted Amicus Curiae Brief Supporting Miami Valley Power Project Renewed Attempt to Obtain Hearings on Eight QA Contentions ML20071P9121983-06-0606 June 1983 Motion for Leave to File Amicus Curiae Brief Supporting Miami Valley Power Project Motion to Reopen Record to Admit Eight Contentions on QA & Character & Competence ML20071P8901983-06-0606 June 1983 Brief Supporting Miami Valley Power Project Request to Reopen Licensing Hearing Re Plant Operation.Certificate of Svc Encl ML20071P8851983-06-0606 June 1983 Request to File Amicus Curiae Brief Supporting Miami Valley Power Project Efforts to Obtain Further Public Hearing ML20071Q0241983-06-0303 June 1983 Amicus Curiae Brief Supporting Miami Valley Power Project Motion to Reopen Record for Admission of Eight Contentions on QA & Util Character & Competence.Hearings Only Comprehensive Way to Address Problems.W/Certificate of Svc ML20023D8641983-06-0303 June 1983 Motion to Reopen Record for Admission of Eight Contentions on QA & Character & Competence Or,Alternatively,For ASLB to Exercise Discretion to Consider Whether Stds for 830715 Demonstration of Sua Sponte Authority Met ML20072N4281983-06-0202 June 1983 Motion to Reopen Record for Admission of Eight Contentions on QA & Corporate Character & Competence,Or Alternatively, for ASLB to Consider Whether Stds for 820715 Exercise of Sua Sponte Authority Exists ML20076J2001983-05-31031 May 1983 Cumberland Chapter of Sierra Club Request to File Amicus Curiae Brief Supporting Miami Valley Power Project Renewed Attempt to Obtain Hearing on Eight QA Contentions ML20076J2091983-05-20020 May 1983 Cumberland Chapter of Sierra Club Amicus Curiae Brief Supporting Miami Valley Power Project Renewed Attempt to Obtain Hearing on Eight QA Contentions.Util Cannot Be Trusted to Correct Deficiencies.Certificate of Svc Encl ML20076J1641983-05-20020 May 1983 Appalachia-Science in the Public Interest Request to File Amicus Curiae Brief Supporting Miami Valley Power Project Attempt to Obtain Hearing on Eight QA Contentions ML20076J1691983-05-17017 May 1983 Appalachia-Science in the Public Interest Amicus Curiae Brief Supporting Miami Valley Power Project Renewed Attempt to Obtain Hearings on Eight QA Contentions.Certificate of Svc Encl ML20070M1601983-01-0707 January 1983 Answer in Opposition to Miami Valley Power Project 821223 Memorandum & Motion for Notification of Future Communications & Prohibition of Further Improper Ex Parte Contacts.Nrc Correspondence & Certificate of Svc Encl ML20079J1781982-12-23023 December 1982 Supplemental Memorandum in Support of Miami Valley Power Project 820820 Petition for Reconsideration of Commission 820730 Order & Motion for Notification of All Future third- Party Communications.Certificate of Svc Encl ML20070F1091982-12-16016 December 1982 Answer Opposing Miami Valley Power Project 821130 Petition to Establish Detailed Structure for Public Participation Through Audit.Intervenor Fails to Demonstrate Process Necessary to Carry Out NRC Goals.Certificate of Svc Encl ML20070C5211982-12-10010 December 1982 Memorandum Supporting Zimmer Area Citizens-Zimmer Area Citizens of Ky & City of Mentor,Ky 821119 Petition for Appointment of Consulting Firm to Review & Monitor third- Party Audit.Certificate of Svc Encl 1984-03-20
[Table view] |
Text
. _ _
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
The Cincinnati Gas & Electric ) Docket No. 50-358 Company, et al. )
(Wm. H. Zimmer Nuclear Power )
S tation) )
APPLICANT'S STATEMENT OF MATERIAL FACTS AS TO WHICH THERE IS NO GENUINE ISSUE TO BE HEARD RESPECTING CONTENTION 17 Contention 17
- 1. The fire protection provisions for the Zimmer Station are described in detail in the Fire Protection Evaluation Report ("FPER").
- 2. The Fire Protection Evaluation Report describes those systems utilized to provide early detection of fires and provides a detailed description of those systems de-signed to limit the consequerces of a fire should one occur.
- 3. The fire protection program and plant arrangements ,
are evaluated in the FPER with respect to the effect of a fire on the' performance of necessary safe plant shutdown functions.
- 4. The Zimmer Station complies with all design criteria and requirements for fire protection as promulgated by the Nuclear Regulatory Commission. -
i73b i 791102 0 h "t,N
- 5. The design of the Zimmer Station provides for safe plant operation and shutdown with regard to the fire protection system and programs to be utilized.
- 6. Certain cable trays in specific locations had to be protected in order that redundant divisions would not be adversely affected by a postulated fire.
- 7. The determination of the specific cable trays to be protected was made on the basis of an evaluation of each area in consultation with the Nuclear Regulatory Commission Staff which also participated in the specification of the protection required.
- 8. Where protection of a cable tray is required, that cable tray will be cocooned with three one-inch layers of "Kaowool," a ceramic fiber made into an insulating blanket.
- 9. The Applicant participated in various tests to qualify the insulating material and the method of insulating the cable trays.
- 10. The test of relevance as far as the qualification of the cocooned cable trays utilized at the Zimmer Station is the one described in Revision 13 to the Fire Protection ~
Evaluation Report, the CTL Report.
- 11. The CTL test was performed by Construction Technology Laboratories under the direction of Melvin S. Abrams, an expert in fire protection.
- 12. The CTL test is fully described in Revision 13 to the Fire Protection Evaluation Report. _
i }5h \ .
- 13. The cable trays and Kaowool utilized in the CTL test and the method of application are the same as utilized in the Zimmer Station.
- 14. The cables utilized in the CTL tests were the same which will be cocooned in Kaowool at the Zimmer Station.
- 15. Four cable tray specimens were fabricated for the fire test.
- 16. Cables were placed in a random manner in each of the trays by personnel of CTL.
- 17. Prior to putting cables in trays, thermocouples were attached to the trays.
- 18. After a tray was filled, the insulating cover was placed on the tray and the entire assembly banded with steel bands in accordance with the specifications.
- 19. The cable trays were fixed in the CTL furnace to simulate the vertical separation of cable trays.
- 20. Furnace atmosphere temperatures were programmed to follow the time temperature relationship specified in ASTM Designation E119.
- 21. The wrapping of the cable trays with the Raowool ~
blanket protected the circuit continuity of cables in the trays for a minimum of 94 minutes.
- 22. No short circuits occurred during the test period.
- 23. In addition, no short circuits occurred at a cable
-jacket temperature of 200 C which is considered as the maximum,
4 _
continuous service temperature for maintaining continuity for this type of cable jacketing.
- 24. The cables which were removed from the furnace 30 minutes afre : the end of the test period and af ter temperatures of the cables had increased about 50*F over those at the end of the test showed no damage to the cable jacketing material.
- 25. Cables removed some 3 1/2 hours af ter the test was terminated (and after temperatures of the cables had continued to rise an additional 100 to 200 F for about 1 1/2 hours af ter the test was terminated) showed some softening of jacket material, but the cable tested still maintained circuit continuity.
- 26. The insulating barrier of Kaowool, using the ap-plication techniques and thickness described in detail 4
in the CTL report, proved to be qualified as a fire thermal barrier between the enclosed system and external area of exposure fire, for the system arrangement used during the testing program.
~~
- 27. The 90 minute test period for the CTL tesE was determined in consultation with the NRC Staff.
- 28. The test period was determined on the basis that if this test were passed, sufficient fire protection as needed in the "immer facility would be provided considering the locations of cable trays, ignition and fuel sources, and fire detection and fire protection measures at the various critical locationL. gc, i L. J
}2)
5-
- 29. Applicant is not relying on the Husky fire tests which were run during the period September 1978 through January 1979 in order to qualify the Kaowool-cocooned cable trays.
- 30. Any asserted deficiency in the Husky tests done to qualify Kaowool cocooned cable trays are irrelevant.
- 31. The Underwriters Laboratory Test Report R8758 is not being relied upon.
- 32. Any asserted deficiencies in the Underwriters Laboratory Test are irrelevant.
- 33. Cables which pass through cable trays to be cocooned in Kaowool have ceen suitably derated in order that their design temperatures are not exceeded either in normal operation or as a result of a postulated fire.
- 34. A design feature of the Zimmer Station is the utilization of concrete curbs around penetrations of floors through which cable trays are routed such that any flammable or other liquids spilled on the floor cannot contact a vertical cable tray or penetrate into the Kaowool cocoon.
- 33. When Kaowool butts to a floor, ceiling or' wall, a
~
qualified fire retardant sealant will be used to prevent penetration of any flammable liquid into a Kaowool wrapped cable tray.
- 36. Adequate fire protection has been provided for the 2immer Station as described in the Fire Protecrion Evaluation Report.
\ ),
- 37. Adequate consideration has been given to protection of redundant cables against specified fire hazards.
- 38. Where necessary, one of the redundant cable divisions has been protected with a qualified Kaowool cocoon.
- 39. The type and amount of insulation for cable trays has been determined considering the location and available fire detection and protection methods.
- 40. The Kaowool insulating material has been qualified by test to assure that all NRC requirements and criteria are met.
- 41. Other design measures have been taken to assure the functioning of the cables both during normal operation and during a fire.