IR 05000293/2006012
Download: ML063350415
Text
December 1, 2006
Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC EVALUATED EMERGENCYPREPAREDNESS EXERCISE INSPECTION REPORT 05000293/2006012
Dear Mr. Balduzzi:
The enclosed report documents an inspection at the Pilgrim Nuclear Power Station whichevaluated the performance of your emergency response organization during the October 25, 2006, exercise and the post-exercise critique conducted on October 25 and 26, 2006, as specified in the reactor oversight program. The inspectors discussed the preliminary findings of this inspection with members of your staff on October 26, 2006.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed emergency plan procedures and previous drill reports, observed the exercise activities, and interviewed selected emergency preparedness personnel from your staff.Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-293License Nos.DPR-35 M. Balduzzi2
Enclosure:
Inspection Report Nos. 05000293/2006012
w/Attachment:
SupplementalInformationcc w/encl:G. J. Taylor, Chief Executive Officer, Entergy OperationsM. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
T. C. McCullough, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.
R. Walker, Radiation Control Program, Dept. of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. O'Connor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant C. McCombs, Director, MEMA and Commonwealth of Massachusetts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety