05000334/LER-1999-012, :on 990915,inoperability of Loop 1 Over Temperature Delta Temperature Function,Was Discovered.Caused by Personnel Error.Discussed with I&C Technicians.With1999-10-12012 October 1999
- on 990915,inoperability of Loop 1 Over Temperature Delta Temperature Function,Was Discovered.Caused by Personnel Error.Discussed with I&C Technicians.With
05000334/LER-1999-011, :on 990909,inadequate Axial Flux Difference Monitor Alarm Surveillance Was Noted.Caused by Lack of Info in Operations Surveillance Test Procedures 1OST-5A.1 & 2OST-5A.1.Revised Procedures.With1999-10-0909 October 1999
- on 990909,inadequate Axial Flux Difference Monitor Alarm Surveillance Was Noted.Caused by Lack of Info in Operations Surveillance Test Procedures 1OST-5A.1 & 2OST-5A.1.Revised Procedures.With
05000334/LER-1999-010, :on 990906,reactor Manually Tripped Due to Main Unit Generator Voltage Regulator Malfunction.Logic Drawer of Voltage Regulator for Main Unit Generator Was Replaced with Spare.With1999-10-0101 October 1999
- on 990906,reactor Manually Tripped Due to Main Unit Generator Voltage Regulator Malfunction.Logic Drawer of Voltage Regulator for Main Unit Generator Was Replaced with Spare.With
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999
Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with
ML20211J3161999-08-30030 August 1999
Safety Evaluation Supporting Amends 225 & 102 to Licenses DPR-66 & NPF-73,respectively
05000334/LER-1999-009-01, :on 990429,missed Surveillance of Ccws 10 & 8 Header cross-connect Inlet Isolation Valve ICCR-42 Was Noted.Caused by Personnel Error.Involved Personnel Have Been Counseled on Scrutiny of Surveillances.With1999-08-23023 August 1999
- on 990429,missed Surveillance of Ccws 10 & 8 Header cross-connect Inlet Isolation Valve ICCR-42 Was Noted.Caused by Personnel Error.Involved Personnel Have Been Counseled on Scrutiny of Surveillances.With
05000412/LER-1999-008-01, :on 990722,identified That TS SR 4.8.1.1.2.f Re Simultaneous Start Test of EDGs Not Fully Verified Due to Human Error.Ts & Safety Culture Training Has Been Conducted for Applicable Personnel.With1999-08-19019 August 1999
- on 990722,identified That TS SR 4.8.1.1.2.f Re Simultaneous Start Test of EDGs Not Fully Verified Due to Human Error.Ts & Safety Culture Training Has Been Conducted for Applicable Personnel.With
05000412/LER-1999-009, :on 990817,shutdown Was Initiated IAW TS 3.8.1.1 Due to Degraded Flow in Edg.Caused by Ineffective Programs to Keep Live Zebra Mussels from Entering Sws.Plant Zebra Mussel Control Plan Will Be Reviewed & Revised1999-08-19019 August 1999
- on 990817,shutdown Was Initiated IAW TS 3.8.1.1 Due to Degraded Flow in Edg.Caused by Ineffective Programs to Keep Live Zebra Mussels from Entering Sws.Plant Zebra Mussel Control Plan Will Be Reviewed & Revised
ML20210U9511999-08-18018 August 1999
Safety Evaluation Supporting Amend 101 to License NPF-73
05000412/LER-1999-006-01, :on 990716,loss of Plant 4kV Train B Emergency Bus Occurred.Caused by Detected Ground Overcurrent Condition.Three Associated Control Relays in EDG 2-2 Voltage Regulator Were Replaced.With1999-08-16016 August 1999
- on 990716,loss of Plant 4kV Train B Emergency Bus Occurred.Caused by Detected Ground Overcurrent Condition.Three Associated Control Relays in EDG 2-2 Voltage Regulator Were Replaced.With
ML20210P1711999-08-10010 August 1999
Safety Evaluation Supporting Amends 224 & 100 to Licenses DPR-66 & NPF-73,respectively
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999
Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With
ML20209D9531999-06-27027 June 1999
Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999
ML20195C8401999-06-0303 June 1999
Safety Evaluation Supporting Amends 223 & 99 to Licenses DPR-66 & NPF-73,respectively
L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999
Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with
05000334/LER-1999-008, :on 990423,missed IST Program Surveillance Attribute,Was Identified.Caused by Inappropriate Exclusion of Testing Two Valves in Closed Direction within Original IST Program.Ist Program Revised.With1999-05-21021 May 1999
- on 990423,missed IST Program Surveillance Attribute,Was Identified.Caused by Inappropriate Exclusion of Testing Two Valves in Closed Direction within Original IST Program.Ist Program Revised.With
ML20206N5001999-05-12012 May 1999
Safety Evaluation Supporting Amend 222 to License DPR-66
05000334/LER-1999-007, :on 990413,manually Initiated Reactor Trip Signal During pre-planned Shutdown of Unit While in Mode 3. Caused by Failure of Cabinet Air Conditioner.Replaced Failed Cabinet Air Conditioner.With1999-05-11011 May 1999
- on 990413,manually Initiated Reactor Trip Signal During pre-planned Shutdown of Unit While in Mode 3. Caused by Failure of Cabinet Air Conditioner.Replaced Failed Cabinet Air Conditioner.With
05000334/LER-1999-006, :on 990409,inadequate pre-fire Plan Procedure Guidance Resulted in Potential Damage to Edgs.Caused by Personnel Error.Implemented Appropriate Revs to Affected Procedures.With1999-05-10010 May 1999
- on 990409,inadequate pre-fire Plan Procedure Guidance Resulted in Potential Damage to Edgs.Caused by Personnel Error.Implemented Appropriate Revs to Affected Procedures.With
L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999
Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable
05000412/LER-1999-005-01, :on 990329,4KV-2A Bus Trip on Ground Overcurrent Relay 51-VA207X,occurred.Caused by Erratic DC Supply Voltage Caused by Loose connection.4 Kv Bus 2A Meggered with 5,000 Volts Dc,Satisfactorily1999-04-28028 April 1999
- on 990329,4KV-2A Bus Trip on Ground Overcurrent Relay 51-VA207X,occurred.Caused by Erratic DC Supply Voltage Caused by Loose connection.4 Kv Bus 2A Meggered with 5,000 Volts Dc,Satisfactorily
05000334/LER-1999-005, :on 990319,noted Inadequate Meteorological Wind Speed Instrumentation Calibr Range Which Led to Failure to Comply with Ts.Caused by Inadequate Procedures.Plant Wind Speed Sensors Were Removed & re-calibr.With1999-04-19019 April 1999
- on 990319,noted Inadequate Meteorological Wind Speed Instrumentation Calibr Range Which Led to Failure to Comply with Ts.Caused by Inadequate Procedures.Plant Wind Speed Sensors Were Removed & re-calibr.With
ML20205Q9441999-04-16016 April 1999
Safety Evaluation Supporting Amend 221 to License DPR-66
05000334/LER-1999-004-01, :on 990317,inadequate pre-fire Plan Procedure Guidance Resulted in Potential Damage to Charging/Hhsi Pumps.Caused by Inadequate Consideration of Required Operator Actions.Procedure Revised.With1999-04-14014 April 1999
- on 990317,inadequate pre-fire Plan Procedure Guidance Resulted in Potential Damage to Charging/Hhsi Pumps.Caused by Inadequate Consideration of Required Operator Actions.Procedure Revised.With
05000412/LER-1999-004, :on 990312,inadequate Basis for Seismic Instrument Setpoints & Calibration Led to TS Noncompliance. Caused by Discrepancy in Tss.Noncompliances Were Corrected & Appropriate Procedures Were Revised.With1999-04-12012 April 1999
- on 990312,inadequate Basis for Seismic Instrument Setpoints & Calibration Led to TS Noncompliance. Caused by Discrepancy in Tss.Noncompliances Were Corrected & Appropriate Procedures Were Revised.With
ML20205L0401999-04-0909 April 1999
SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2
05000412/LER-1999-003-01, :on 990311,containment Equipment Hatch Was Not Completely Closed During Refueling Operations.Caused by Failure to Understand Supporting Function of Chain Hoists. Revised Procedure.With1999-04-0808 April 1999
- on 990311,containment Equipment Hatch Was Not Completely Closed During Refueling Operations.Caused by Failure to Understand Supporting Function of Chain Hoists. Revised Procedure.With
05000412/LER-1999-002-01, :on 990305,discovered Potential Damage to Charging HHSI Pumps Due to Inadequate pre-fire Plan Procedure Guidance.Caused by Inadequate Analysis in 1987. Procedures Revised Addressing Subj Issue.With1999-04-0505 April 1999
- on 990305,discovered Potential Damage to Charging HHSI Pumps Due to Inadequate pre-fire Plan Procedure Guidance.Caused by Inadequate Analysis in 1987. Procedures Revised Addressing Subj Issue.With
05000334/LER-1999-003, :on 990308,noted Failure to Set Esg Degraded Setpoint IAW Required,Per Ts.Caused by Misinterpretation of Symbol Contained in Degraded Voltage Ts.Revised Procedures & Submitted LAR to NRC on 990118.With1999-04-0505 April 1999
- on 990308,noted Failure to Set Esg Degraded Setpoint IAW Required,Per Ts.Caused by Misinterpretation of Symbol Contained in Degraded Voltage Ts.Revised Procedures & Submitted LAR to NRC on 990118.With
ML20205D7281999-03-26026 March 1999
Safety Evaluation Supporting Amends 220 & 97 to Licenses DPR-66 & NPF-73,respectively
ML20205D9821999-03-26026 March 1999
Safety Evaluation Supporting Amend 98 to License NPF-73
05000412/LER-1999-001-01, :on 990227,failure to Comply with TSs Due to Not Meeting Acceptance Criteria for Source Range Monitor During Surveillance Testing,Was Discovered.Caused by Lack of Attention.Procedure 20ST-2.3 re-performed.With1999-03-25025 March 1999
- on 990227,failure to Comply with TSs Due to Not Meeting Acceptance Criteria for Source Range Monitor During Surveillance Testing,Was Discovered.Caused by Lack of Attention.Procedure 20ST-2.3 re-performed.With
ML20196K7981999-03-25025 March 1999
Rev 4 to COLR, for Cycle 8
05000334/LER-1999-002, :on 990121,4 Input Parameters Were Identified Which Underestimated DBA Dose.Caused by non-conservative Concurrent Iodine Spike Radiological Dose Calculation Methodology.Acs Have Been Implemented.With1999-03-0303 March 1999
- on 990121,4 Input Parameters Were Identified Which Underestimated DBA Dose.Caused by non-conservative Concurrent Iodine Spike Radiological Dose Calculation Methodology.Acs Have Been Implemented.With
ML20203E1181999-02-10010 February 1999
SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description
ML20196F7011999-01-31031 January 1999
BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626
ML20207E6631999-01-28028 January 1999
Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13
ML20210G7041999-01-22022 January 1999
BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122
05000334/LER-1998-029, :on 981218,inadequate Meterological Instrumentation Calibr Led to Failure to Comply with Tss.Caused by Human Error.Current Wind Direction Sensor Was Replaced.With1999-01-15015 January 1999
- on 981218,inadequate Meterological Instrumentation Calibr Led to Failure to Comply with Tss.Caused by Human Error.Current Wind Direction Sensor Was Replaced.With