Press Release Requesting Comment by Persons in Two Creeks, Manitowoc County,Wi Affected by Purchase & Installation of Spare Steam Generators at Facility
ML20002E107
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/20/1981
From: Mendl J
WISCONSIN, STATE OF
To:
References
6630-CE-20, PR-810120, NUDOCS 8101260426
Download: ML20002E107 (2)


Text

,

tale O $5COhsin \ PUBLIC SERVICE COMMISSION MANLEY YORK.CHAIRM AN January 20, 1981 . EDWARD M. PARSONS.JR COMMISSIONER WILLIE J. NUNNERY, COMMISSIONER Hill Forms State Office Building Madison, Wisconsin 53702 (608)266-1241 To the Person Addressed: Fh No. 6630-CE-20 INFORMATION FOR PERSONS AFFECTED BY PURCHASE -

AND INSTALLATION OF SPARE STEAM GENERATORS -

AT POINT BEACH NUCLEAR POWER PLANT UNIT 1 IN THE TOWN OF TWO CREEKS, MANITOWOC COUNTY, WIGCONSIN The Wisconsin Electric Power Company (WEPCO) plans to purchase and store two replacement steam generator lower sections and .

primary moisture separators for the Point Beach Nuclear Power Plant, Unit 1, in the town of Two Creeks, Manitowoc County, Wisconsin. The replacement parts will be shipped to the site on a barge and will be unloaded either in Kewaunee or at the site. If the barges are unloaded at the site, a barge slip must be dredged along the shoreline. This was done (and the slip filled in) for delivery of the present steam generators.

There are three possible alternative actions: a) to continue to operate Point Beach 1 at less than full power and to plug tubes in the steam generators as they begin to leak; b) to repair the existing steam generators by inserting metal

" sleeves" into the steam generator tubes; and c) to decommis-sion Point Beach 1 in the near future. WEPCO has not decided whether to install the replacement steam generators or whether to store the replacement steam generators and repair the pre-sent steam generators.

The total estimated project costs are: S12.5 million for pur-chase and storage of the steam generators and $5.5 million for repair of the steam generators (assuming cost sharing with Westinghouse). The estimated cost of steam generator replace-ment is $48.5 (cost to WEPCO $34 million).

The Systems Planning, Environmental Review and Consumer Analy-sis Division (SPERCA) of the Public Service Commission is con-ducting an environmental screening on the above project and its alternatives and would like your comment. The screening is being conducted to determine whether an environmental impact statement is necessary. If you would like to comment on this project, you may do so by writing Sarah Jenkins, Public Service Commission, 4802 Sheboygan Avenue, Madison, Wisconsin 53702, or b

s 91 01260 % p 14

Q 6630-CE-20 Screening Notice Page.2 by telepho'ning Ms. Jenkins at (608) 266-5990. Comments must be submitted by February 2, 1981.

. - ~

Sincerely, Rk e.

Jerry E. Mendl Division Administrator Systems Planning, Environmental Review and Consumer Analysis JEM/SJ/kmw I