(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML24297A6512024-10-23023 October 2024 5 to UFSAR, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Reports, Figures and Graphs ML23289A2232023-10-16016 October 2023 Allegations Received from All Sources External to the NRC - Sept 2023 ML23289A2302023-10-16016 October 2023 Discrimination Allegations Received Sept - 2023 ML23289A2272023-10-16016 October 2023 Allegations Substantiated - September 2023 ML23289A2292023-10-16016 October 2023 Allegations Substantiated with Regulatory Response - Sept 2023 ML23289A2212023-07-28028 July 2023 Allegations Open - Sept 2023 ML22348A0872023-07-25025 July 2023 Enclosure - VEGP Unit 4 - 103g - Final Memorandum Table ML23184A0472023-07-0303 July 2023 Dashboard Report 7-3-2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23093A0862023-04-0303 April 2023 Dashboard Report 4-3-2023 ML22214B4902023-02-0808 February 2023 Enclosure 1 - Operational Program Inspection Status Table ML22214B4932023-02-0808 February 2023 Enclosure 2 - Licensing Actions Status Table ML23038A0082023-02-0707 February 2023 Construction Reactor Oversight Process Resources Report February 7, 2023 ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22230C5162022-08-18018 August 2022 Dashboard Report 8-18-2022 ML22208A0242022-08-0101 August 2022 103g - Final Memorandum - Enclosure ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22186A0332022-07-0505 July 2022 Dashboard Report 7-5-2022 ML22186A0342022-07-0505 July 2022 Dashboard Report 7-5-2022 ML22173A0122022-06-22022 June 2022 Dashboard Report 6-22-2022 ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ND-22-0242, Request for Alternative: Alternative Requirements for Main Turbine System Valve Testing (VEGP 3&4-IST-ALT-02)2022-04-0808 April 2022 Request for Alternative: Alternative Requirements for Main Turbine System Valve Testing (VEGP 3&4-IST-ALT-02) ML22091A3162022-04-0101 April 2022 NRC Initial Test Program and Operational Programs Inspection Reports 05200025/2022002, 05200026/2022002 ML22087A0962022-03-28028 March 2022 Dashboard Report 3-28-2022 ML21277A0762021-10-0404 October 2021 Vog 4 Dashboard 10-4-2021 ML21215A0072021-08-0303 August 2021 Dashboard Report 8-2-2021 ML21215A0062021-08-0303 August 2021 Dashboard Report 8-2-2021 ML21160A0382021-06-0909 June 2021 Construction Reactor Oversight Process Resources Report June 2021 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21008A0042021-01-0404 January 2021 Dashboard Report 1-4-2021 ML20343A0742020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20281A3872020-10-0101 October 2020 Dashboard Report 10-1-2020 ML20281A4002020-10-0101 October 2020 Dashboard Report 10-1-2020 ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20191A3982020-08-14014 August 2020 Table 2 - Vogtle, Units 3 and 4, Resident Inspector Inspection Samples and Hours ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)2020-07-28028 July 2020 Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) ML20121A2902020-04-30030 April 2020 Construction Reactor Oversight Process Resources 1st Quarter CY2020 ML20038A3072020-02-0707 February 2020 Construction Reactor Oversight Process Resources. Quarterly Update. 1st Quarter 2020 ML20035C5542020-02-0404 February 2020 Attachment 1 - Targeted ITAAC Listing for Vogtle Electric Generating Plant Units 3 and 4 ML20035C5612020-02-0404 February 2020 Attachment 2 - Targeted ITAAC Family Listing for Vogtle Electric Generating Plant Units 3 and 4 ML20035C5702020-02-0404 February 2020 Attachment 3 - Targeted ITAAC Changes for Vogtle Electric Generating Plant Units 3 and 4 ML20007D9042020-01-0808 January 2020 Table of Proposed ROP Baseline Samples for Vogtle Site ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15106A3612015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Example Vogtle 1 and 2, Change Justification Matrix ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T 2024-10-23
[Table view] |
Text
Proposed ROP Baseline Samples for Vogtle Site Minimum Nominal Maximum Title Bases Sample Sample Sample 71111.01* Adverse Weather Protection Site-wide Performance. Max Samples in accordance with Baseline.
Fewer passive high and intermediate 71111.04 Equipment Alignment (Partial) 3 3 3 important structures, systems, and components (SSCs)
Fewer high and intermediate important 71111.04S Equipment Alignment (Complete) 0 1 2 AP1000 systems compared to conventional reactor.
Fire drills are independent of technology and 71111.05A Fire Protection (Annual) 1 1 1 remain unchanged.
AP1000 has less fire areas than the sample 71111.05Q Fire Protection (Quarterly) 6 7 8 size for ROP.
No operating experience of flooded cable vaults, 71111.06 Flood Protection Measures 1 1 2 Annual inspection for external flood will become biennial.
Two heat sinks, containment and passive 71111.07A Heat Sink Performance (Annual) 1 1 1 RHR. Passive will be inspected every alternating IP frequency.
71111.07T* Heat Sink Performance (Triennial) Site-wide Performance. Max Samples in accordance with Baseline.
AP1000 on a 21-month nominal RFO and 71111.08P Inservice Inspection Activities (PWR) 1 1 1 conventional reactors on an18-month nominal RFO Licensed Op Requalification &
71111.11A 1 1 1 Performance (Annual)
Inspection for conventional reactors will be Licensed Op Requalification &
71111.11B 1 1 1 the same for AP1000 Performance (Biennial)
Licensed Op Requalification &
71111.11Q 8 8 8 Performance (Quarterly)
Maintenance Effectiveness (includes 71111.12 4 4 4 RTNSS as samples)
Fewer passive high and intermediate Maintenance Risk Assessments &
71111.13 7 8 9 important SSCs Emergent Work Control Operability Determinations and 71111.15 9 10 11 Functionality Assessments 1
Proposed ROP Baseline Samples for Vogtle Site Evaluations of Changes, Tests, and 71111.17T* Site-wide Performance. Max Samples in accordance with Baseline.
Experiments 71111.18 Plant Modifications 2 2 2 Fewer passive high and intermediate important SSCs 71111.19 Post Maintenance Testing 9 10 11 Refueling and Other Outage Same sample size due to the IP focuses on 71111.20 1 1 1 Activities outage management.
71111.21M* Design Basis Assurance (Teams) Site-wide Performance. Max Samples in accordance with Baseline.
Design-Basis Capability of Power Site-wide Performance. Max Samples in accordance with Baseline. (Increase Max samples 71111.21N.02*
Operated Valves range to provide additional samples) 71111.21N.05* Fire Protection Team Inspection Site-wide Performance. Max Samples in accordance with Baseline.
Stage 2 FLEX used for and inspected at Vogtle Units 1 & 2.
71111.22 Surveillance Testing 6 7 8 No FLEX at Vogtle Units 3 & 4 Fewer Tech Spec SSCs 18 PIs to verify vice 28; 6 are site-wide, so 71151 Performance Indicator Verification 12 12 12 split verification charge between 2 sites (3 each)
Site-wide Performance. Max Samples in accordance with Baseline.
71152* Problem Identification and Resolution (Adjust routine review to account for 4-unit site) 71153 Follow-up of Events and NOED 1 1 1 Fewer LERs due to fewer active components Emergency Preparedness 71114* Site-wide Performance. Max Samples in accordance with Baseline.
(8 IPs)
Radiation Protection 71124 Combination of Individual and Site Wide.
(8 IPs)
Security 71130*i Site-wide Performance. Max Samples in accordance with Baseline.
(9 IPs)
- Site-wide program common to all four Vogtle units 2