ML20008F729

From kanterella
Revision as of 04:58, 28 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1981
ML20008F729
Person / Time
Site: Crystal River 
Issue date: 04/06/1981
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20008F726 List:
References
NUDOCS 8104210550
Download: ML20008F729 (4)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-302

. DATE h/6/81 COMPLETED BY Mx culver TELEPHONE (Ooh) 705-6h86 OPERATING STATUS Crystal River Unit 3 Note 5

1. Unit Name:
2. Reporting Period: 3/1/81 - 3/31/81
3. Licensed Thermal Power (MWI):

2452

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): _._
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

N/A

9. Power Lesel To which Restricted.lf Any Net MWe): NOU*
10. Reasons For Restrictions.If Any:

one , , _

This Month Yr..to.Date Cumulative 7hk 2260 35520

11. Hours In Reporting Pen.o d
12. Number Of Hours Reactor Was Critical 0 0 1129 22
13. Reactor Reserve Shutdown Hours 444 1563 5 20948.66
14. Hours Generator On.Line 0 0 0
15. Unit Reserve Shutdown Hours 10h3552 3675526.3 46353936 .
16. Gross Thermal Energy Generated (MWH) 355645 1263683 2 15767614
17. Gross Electrical Energy Generated (MWH) _

338588 1202672 14946242

18. Net Electrical Energy Generated (MWH) 59.7% 73.3% 58.96%
19. Unit Service Factor 59 7% 73.3% 56 965
20. Unit Availability Factor 58.2% 71.2% 53.65
21. Unit Capacity Factor (Using MDC Net) 55 2% 67.5% 51.09
22. Unit Capacity Factor (Using DER Net) 27.49% 9 67, 27.61%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

Refteling outage starting 9/19/61 a-2 lasting approxn.ately 12 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: h/6/81
26. Units In Test Status (Prior Io Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 1/1k /II INITIA L ELECTRICITY 1/30/77 COMM EllCI AL OPER ATION 3/13/77

("/77 8 8 10421 05 50

DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE h/6/81 COMPLETED BY M- u_ N1 vy REPORT MONTil March TELEPHONE (90h) 795 6h86 d

- e,

= .

T -

c Licensee 5-r, E *. Cause & Carrective

, .E E E 4 s.n4:

No . liste i 58 4 .5 i $ Event u7 81 Action to f3 5 3 5 e- Report # iA U v

hO Present Recurrence e y Q

1 N/A CB PUMPXX Continuation of RCP seal outage from 81-16 810301 S 131.7 A last month.

81-17 810317 F 37.1 G 3 N/A IA CKTBRK While performing a surveillance pro-cedure, an instrument technician accidentally opened CRI! Breaker "A" with CRD Breaker "B" already open.

This resul.ted in an automatic reactor /

turbine trip.

81-18 810326 F 131.2 A 1 N/A RC FUELXX Plant was shut down due to a loose part in steam generator B2. The part has been tentatively identified as a control rod guide tube nut.

l 3 4 I 2 F: Forced Reason: Methtml: Exhibit G-Instructions A Equipment Failure (Explain) 1 Manual for Preparation of Data 5 Scheduled Entry Sheets for Licemce B-Maintenance or Test 2 Manual Scram.

C Refueling 3. Automatic Scram. Event Pepori ti.ERI File tNIIRI G-D Regulatory Restriction 4-Ot her ( Explain) 0161) li-Operator Training & License Fxamination F Administrative 5 .

G. Operational Liror (Explain) I sinbit

  • S ime Sonice l'8/77) Il-Ot her t INplain t

AVERAGE TAILY UNIT POWER LEVEL DOCKET NO. 50-302

(  : FLCRP-3 UNIT DATE k/1/01

  • COMPLETED BY M. W. Culver TELEPlf0NE (90h) 795-6486 e

MONTH March DAY , AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (Mwe.Neti O 17 .h86 I

0 o 2 ,

502 3 19 0 20 780' 4

0 21 795 5

191 22 794 6

625 79h

( 7 808 23 803 a 24

'l76 25 789 9

795 hol Io 26 0

11 796 27 800 0 12 28 0

13 791 29 0

793 30 14 o

15 793 3, 16 795 INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawart.

?

(9177)

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE h/6/81 COMPLETED BY M. W. Culver TELEPHONE (90h) 795-6h86 MONTH March, 1981

SUMMARY

STATEMENT:

The unit began the month with a continuation of an outage from last month. Two additional outages were experienced during the remainder of March.

1

_ ,, _ _ _ _ _ . _ _ , . . - _ . , _ _ . . , , . , - - . , - . . - -- - - - - ,