ML050760404

From kanterella
Revision as of 11:16, 23 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Technical Specifications, Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports
ML050760404
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/08/2005
From: Gratton C
NRC/NRR/DLPM/LPD2
To: Sumner H
Southern Nuclear Operating Co
Gratton C, NRR/DLPM 415-1055
Shared Package
ML0050460012 List:
References
TAC MC3911, TAC MC3912
Download: ML050760404 (4)


Text

Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.

5.6.1 Deleted.

5.6.2 Annual Radiological Environmental Operating Report

~--------NOTE- ---- a Asingle submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station.

The Annual Radiological Envirpnmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, Interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined In the Offsite Dose Calculation Manual (ODCM), and In 10 CFR 50, Appendix 1,Sections IV.B.2, IV.B.3, and IV.C.

The Annual Radiological Environmental Operating Report shall Include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements In the (continued)

HATCH UNIT 1 5.0-1 8 Amendment No. 245

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.2 Annual Radiological Environmental Onerating Report (continued) format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted In a supplementary report as soon as possible.

5.6.3 Radioactive Effluent Release Report A single submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station; however, for units with separate radwaste systems, the submittal shall specify the releases of radioactive material from each unit.

The Radioactive Effluent Release Report covering the operation of the unit shall be submitted In accordance with 10 CFR 50.36a. The report shall Include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined In the ODOM and the Process Control Program and In conformance with 10 CFR 50.36a and 10 CFR 50, Appendix 1,Section IV.B.1.

5.6.4 Deleted.

5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented In the COLR for the following:
1) The Average Planar Linear Heat Generation Rate for Specification 3.2.1.
2) The Minimum Critical Power Ratio for Specification 3.2.2.
3) The Linear Heat Generation Rate for Specification 3.2.3.

(continued)

HATCH UNIT 1 5.0-1 9 Amendment No. 245

Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.

5.6.1 Deleted.

5.6.2 Annual Radiological Environmental Operating Report

- ---

_,_--.-_---_-__- ea x I ~rn I __._ .: . ._ . _. . _ . ..

A single submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station.

The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall Include summaries, Interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined In the Offsite Dose Calculation Manual (ODCM), and In 10 CFR 50:Appendix 1,Sections IV.B.2, IV.B.3, and IV.C.

The Annual Radiological Environmental Operating Report shall Include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified In the table and figures Inthe ODCM, as well as summarized and tabulated results of these analyses and measurements In the format of the (continued)

~~ ~UNT .8AedetN. 18 HATCH~~~

~

HATCH UNIT 2 5.0-18 Amendment No. 189

Repbrting Requirements 5.6 5.6 Reporting Requirements 5.6.2 Annual Radiological Environmental Oneratina Report (continued) table In the Radiological Assessment Branch Technical Position, Revision 1, November 1979. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.

5.6.3 Radioactive Effluent Release Report A single submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station; however, for units with separate radwaste systems, the submittal shall specify the releases of radioactive material from each unit.

The Radioactive Effluent Release Report covering the operation of the unit shall be submitted In accordance with 10 CFR 50.36a. The report shall Include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODOM and the Process Control Program and In conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.

5.6.4 Deleted.

5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented In the COLR for the following:
1) The Average Planar Linear Heat Generation Rate for Specification 3.2.1.
2) The Minimum Critical Power Ratio for Specification 3.2.2.
3) The Linear Heat Generation Rate for Specification 3.2.3.

(continued)

HATC UNI 2 .0-1 Amedmet No 18 HATCH UNIT 2 5.0-1i9 Amendment No. 189