ML19316A650
| ML19316A650 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/22/1978 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19316A649 | List: |
| References | |
| NUDOCS 8001130193 | |
| Download: ML19316A650 (1) | |
Text
c.
'
-
Tcblo 4.1-2
. MINIMUM EQUIPMENT TEST FREQUENCY
'
Test Frequency Item Movement of Each Rod Bi-Weekly
- 1. Control Rod Movement Pressurizer Safety Valves Setpoint 50% Annually 2.
25% Annually 3 Main Steam Safety Valves Setpoint Functional Prior to 4 Refueling System Interlocks Refueling 5 Main Steam Stop Valves III Movement of Each Stop Monthly Valve Reactor Coolant System ( Evaluate Daily 6.
Leakage Condenser Cooling Water Functional Annually 7.
System Gravi ty Flow Test Functional Monthly
- 8. High Pressure Service Water Pumps and Power '
Supplies Functional Prior to 9 Spent Fuel Cooling System Refueling
- 10. High Pressure and Low ( Vent Pump Casings Monthly and Prior Pressure injection System To Testing
-
(1) Appilcable only when the reactor is critical (2) Applicable only when the reactor coolant is above 200 F and at a steady-state temperature and pressure.
(3) Operating pumps excluded.
(4) In the movement test of rod 6 of safety group 4 of the Unlt 2 control rod system due June 27, 1978, an extension period of seven days to the maximum allowable interval between surveillances is allowed. This seven-day extension period shall expire on July 4,1978.
8001130 / 7 3
- --