ML051330009

From kanterella
Revision as of 15:43, 9 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Operator Licensing Examination Approval - Fitzpatrick Nuclear Power Plant
ML051330009
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/12/2005
From: Conte R
Division of Reactor Safety I
To: Ted Sullivan
Entergy Nuclear Northeast
Shared Package
ML042440205 List:
References
Download: ML051330009 (3)


Text

May 12, 2005 Mr. Theodore Sullivan Site Vice President Entergy Nuclear Northeast James A. Fitzpatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL (Fitzpatrick Nuclear Power Plant)

Dear Mr. Sullivan:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Fitzpatrick Nuclear Power Plant.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Patrick Berry, Manager, Training and Development. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, on May 20, 2005. The NRC staff will administer the operating tests during the week of May 16-20, 2005.

Please contact your Chief Examiner, Steven Dennis, at 610-337-5048, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59

Mr. Theodore Sullivan cc:

G. Taylor, CEO, Entergy Operations M. Kansler, President, Entergy K. Mulligan, General Manager, Plant Operations O. Limpias, VP Engineering B. OGrady, VP Operations Support M. Colomb, Director of Oversight S. Bono, Director, Nuclear Safety Assurance A. Halliday, Manager, Regulatory Compliance J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York, Citizens Awareness Network D. Katz, Citizens Awareness Network S. Glenn, INPO P. Berry, Manager - Training and Development

Mr. Theodore Sullivan Distribution w/encl: (VIA E-MAIL)

S. Collins, RA J. Wiggins, DRA A. Blough, DRS R. Conte, DRS S. Dennis, Chief Examiner, DRS C. Bixler, DRS (w/concurrences)

B. McDermott, DRP D. Jackson, DRP S. Lee, RI OEDO R. Laufer, NRR P. Milano, NRR D. Skay, (Backup) PM, NRR R. Clark, (Backup), PM, NRR L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, DRP, Resident Inspector K. Kolek, Resident OA DOCUMENT NAME: E:\Filenet\ML051330009.wpd SISP Review Complete: RJC ADAMS PKG: ML042440205 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB SDennis/SD RJConte/RJC DATE 05/9/05 05/11/05 05/11/05 OFFICIAL RECORD COPY