ML052710331

From kanterella
Revision as of 10:37, 8 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Public Meeting with NRC to Discuss Cnfirmatory Action Letter and Plant Performance
ML052710331
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/28/2005
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
CAL 3-05-001
Download: ML052710331 (2)


Text

September 28, 2005 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Perry Nuclear Plant, Unit 1 Docket No: 50-440 Date and Time of Meeting: Wednesday, October 12, 2005, at 3:00 P.M. (EDT)

Location of Meeting: Renaissance Quail Hollow Resort Barberry Room 11080 Concord-Hambden Road Painesville, Ohio 44077 Purpose of Meeting: Public Meeting to discuss Confirmatory Action Letter and Plant Performance.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects C. Lipa, Chief, Branch 4, Division of Reactor Projects G. Wright, Project Engineer, Branch 6 R. Powell, Senior Resident Inspector, Perry M. Franke, Resident Inspector, Perry Licensee Attendees:

J. Hagan, Senior Vice President of Operations and Chief Operating Officer, FENOC D. Pace, Senior Vice President, Fleet Engineering, FENOC R. Anderson, Vice President, Perry F. von Ahn, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry J. Shaw, Director, Engineering, Perry M. Wayland, Director, Maintenance, Perry T. Lentz, Director, Performance Improvement Initiative, Perry

Notice of Significant Licensee Meeting NOTES:

(1) Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jan Strasma at 630-829-9663 by COB October 11, 2005.

(2) The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

/RA/

Approved by:

Christine A. Lipa, Chief Reactor Projects Branch 4 Distribution:

B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR L. Marsh (LBM), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR P. Habighorst (PJH2), Region III Coordinator, OEDO H. Nieh (HKN), Project Directorate, Division of Licensing and Project Management, NRR W. Macon, Project Manager, Project Directorate, Division of Licensing Project Management, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII G. Shear (GLS), Acting Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs (JFL, DEH, RDL, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA