Public Meeting with Perry, Unit 1, to Discuss Closure of September 28, 2005, Confirmatory Action Letter and the Overall Results of Your Performance Improvement Initiative
ML063310368
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/21/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML063310368 (2)


Text

November 21, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Perry Nuclear Power Plant, Unit 1 Docket No: 50-440 Date and Time of Meeting: Wednesday, January 10, 2007, at 1:00 p.m. (CST)

Location of Meeting: U.S. Nuclear Regulatory Commission - Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532 Purpose of Meeting: Public meeting to discuss the closure of the September 28, 2005, Confirmatory Action Letter (CAL) and the overall results of your Performance Improvement Initiative.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

J. Caldwell, Regional Administrator, Region III M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects M. Franke, Senior Resident Inspector, Perry Others as Designated Licensee Attendees:

G. Leidich, President and Chief Nuclear Officer, FENOC L. Pearce, Site Vice President, Perry Others as designated

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by January 5, 2007. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Meeting

Contact:

Eric Duncan, Chief Branch 6 (630) 829-9628 ERD@nrc.gov Approved by: /RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Distribution:

J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Banerjee (MXB), Project Manager, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP