ML063390281

From kanterella
Revision as of 11:37, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
01/24/2007 Notice of Multi-Regional NRC Meeting with FENOC Management to Discuss FENOC Fleet-wide Performance
ML063390281
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 11/30/2006
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML063390281 (2)


Text

November 30, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Name of Facilities: Beaver Valley, Perry, and Davis-Besse Nuclear Power Plants Docket Nos. 50-334, 50-412, 50-440, and 50-346 Date and Time of Meeting: Wednesday, January 24, 2007, 9:00 a.m. (EST)

Location of Meeting: Four Points By Sheraton Akron West 3150 W. Market Street Fairlawn, Ohio 44333 Purpose of Meeting Multi-regional NRC meeting with FENOC management to discuss FENOC fleet-wide performance.

Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

J. Caldwell, Regional Administrator, RIII S. Collins, Regional Administrator, RI M. Satorius, Director, Division of Reactor Projects, RIII T. McGinty, Deputy Director, Division of Operating Reactor Licensing, NRR R. Gibbs, Chief, Reactor Inspection Branch, NRR E. Duncan, Chief, Projects Branch 6, RIII R. Bellamy, Chief, Projects Branch 7, RI Licensee Attendees:

G. Leidich, President and Chief Nuclear Officer J. Hagan, Senior Vice President - Operations and Chief Operating Officer D. Pace, Senior Vice President - Fleet Engineering R. Anderson, Vice President - Nuclear Services J. Lash, Site Vice President - Beaver Valley M. Bezilla, Site Vice President - Davis-Besse B. Pearce, Site Vice President - Perry G. Halnon, Director - Fleet Regulatory Affairs

Notice of Significant Licensee Meeting Notes:

(1) Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by January 19, 2007.

(2) The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: /RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Distribution:

T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (CGM), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR T. Wengert, Perry/Davis-Besse Project Manager, DORL, NRR T. Colburn, Beaver Valley Project Manager, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry SRI, Davis-Besse SRI, Beaver Valley DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP