UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
June 20, 2017
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR
INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION
(PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION
PROGRAM INSPECTION REPORT 05000263/2017009
Dear Mr. Gardner:
On September 18, 2017, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Baseline Design Bases Assurance Inspection (Program) at the Monticello Nuclear Generating
Plant. This inspection will be performed in accordance with NRC Baseline Inspection
Procedure 71111.21N, Attachment 1.
The Design Bases Assurance Inspection will focus on the implementation of the Electrical
Equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified
status of equipment during the life of the plant. The EQ components to be reviewed during this
baseline inspection will be identified during the in-office preparation week that occurs prior to the
onsite inspection week.
The inspection will include a bagman trip to support selection of components and 2 weeks of
onsite inspection. The inspection team will consist of three NRC inspectors. The current
inspection schedule is as follows:
Bagman trip onsite week: August 21, 2017
Preparation week: September 11-15, 2017
Onsite inspection weeks: September 18-22, 2017; and
October 2-6, 2017.
P. Gardner -2-
Experience with previous baseline design inspections of similar depth and length has shown
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection for both parties, we have enclosed a request for information needed for the
inspection.
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into four groups:
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than July 31, 2017.
Prior to the bagman trip, on August 10, 2017, the lead inspector will communicate the
initial selected set of approximately 12 EQ components.
The second group of documents requested is those items needed to support the
bagman trip. This set of documents should be available to the lead inspector onsite on
August 21, 2017.
The third group of documents requested is those items needed to support our in-office
preparation activities for the selected set of 6-9 EQ components. This set of documents
should be provided to the lead inspector at the Regional Office no later than September
4, 2017. During the in-office preparation activities, the team may identify additional
information needed to support the inspection.
The last group includes the additional information above as well as plant specific
reference material. This information should be available to the team onsite on
September 18, 2017. It is also requested that corrective action documents and/or
questions developed during the inspection be provided to the lead inspector as the
documents are generated.
The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing
contact for this inspection is Mr. Andrew Kouba of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
P. Gardner -3-
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Benny Jose, Senior Reactor Engineer
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
Enclosure:
Design Bases Assurance Inspection
EQ Program Document Request
cc: Distribution via LISTSERV
P. Gardner -4-
Letter to Peter A. Gardner from Benny Jose dated June 20, 2017
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR
INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION
(PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION
PROGRAM INSPECTION REPORT 05000263/2017009
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML17171A304
OFFICE RIII RIII RIII RIII
NAME BJose
DATE 06/20/17
OFFICIAL RECORD COPY
DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM DOCUMENT REQUEST
Inspection Report: 05000263/2017009
Bagman Dates: August 21, 2017
Inspection Dates: September 18-22, 2017, and October 2-6, 2017
Inspection Procedure: IP 71111.21N, Design Bases Assurance Inspection (Program),
Attachment 1, Environmental Qualification (EQ) under 10 CFR
50.49 Programs, Processes, and Procedures
Lead Inspector: Benny Jose, Senior Reactor Engineer, DRS
630-829-9756
Benny.Jose@nrc.gov
I. Information Requested Prior to the Onsite Information Gathering/Bagman Week
The following information is requested by July 31, 2017, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the team leader as soon as possible. (Please provide the information electronically in
pdf files, Excel, or other searchable formats, preferably on some portable electronic
media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain
descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information
in lists should contain enough information to be easily understood by someone who
has knowledge of light water reactor technology).
1. Risk-ranking of top 250 components required to meet Environmental Qualifications
(EQ) from your site specific Probabilistic Safety Analysis sorted by Fussell Vesely
Importance.
2. Probabilistic Safety Analysis listing of top ten risk significant systems.
3. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated with
EQ.
4. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
and Technical Specifications Bases. Specifically identify which Updated Final Safety
Analysis Report sections address EQ (including seismic).
5. Identify the various EQ standards (including year, edition, or revision) that the station
is committed to.
6. Site (and corporate if applicable) procedures associated with the Title 10, Code of
Federal Regulations, Part 50.49, EQ Program for electrical components. Include
procedures for procurement of qualified equipment, maintenance of qualified
equipment, modification to qualified equipment (including Equivalency or Commercial
Grade Dedication (CGD) programs), and material storage and shelf life controls.
7. Copy of EQ Design Basis Document, if applicable.
Enclosure
8. Copy of any open licensing commitments related to EQ, if applicable.
9. Equipment Qualification Master List. Specific issues to be identified include:
safety classification (safety-related or nonsafety-related), Regulatory Guide 1.97
instrumentation, EQ qualification (e.g., DOR, NUREG 588, 50.49), original or
replaced after implementation of 50.49, and plant location.
10. List of any installed equipment removed from the Equipment Qualification Master List
and basis for removal.
11. List of EQ solenoid valves that are normally continuously energized.
12. List or drawings of plant areas that are subjected to EQ, identifying design (limiting)
temperature, both normal and accident, high energy line break, radiation levels, etc.
that the associated equipment will have to be qualified to meet EQ. If unit has
obtained a power uprate (greater than 5 percent) provide same information pre-
update (earliest available if multiple uprates).
13. List of CGD evaluations performed, for which the dedicated parts have been issued
for installation (parts issued for the last 10 years) on EQ applications in the plant.
Include CGD evaluation number, name of part, component ID or description of the
component the part was issued to repair, work order, and date issued or installed.
14. List of Corrective Action Documents related to the EQ Program or EQ of specific
components for the last 5 years.
15. Current management and engineering organizational chart.
II. Information Requested (for the approximate 9-12 selected components) to be
Available by the Bagman Trip on August 21, 2017.
1. EQ summary report for each component/subcomponent.
2. Qualification Maintenance Requirement Sheet or equivalent.
3. List of corrective action documents associated with each of the selected components
for the last 5 years.
4. Photos of any component in containment or high radiation areas, if available.
III. Information Requested (for the approximate 6-9 selected components) to be
Available by September 4, 2017, (will be reviewed by the team in the Regional
office during the week of September 11, 2017).
This information should be separated for each selected component, especially if
provided electronically (e.g., folder with component name that includes EQ files,
Qualification Test Reports, calculations, corrective action documents, maintenance
history, etc.).
1. EQ file, including associated Qualification Test Reports.
2. Vendor manual (electronic copy or availability of hard copy during inspection).
2
3. Preventive maintenance template.
4. Last performed work order (WO) for each associated EQ preventive maintenance.
5. List of corrective maintenance WOs for the last 10 years. Include WO number, date
performed, and brief one line description.
6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide
copy of the purchase order.
7. Thermal life calculation.
8. Any self-assessments of the EQ program in the last 3 years.
IV. Additional Information to be Provided on September 18, 2017, Onsite
1. During the in-office preparation activities, the team may identify additional
information needed to support the inspection. The lead inspector will provide a
list of the additional information needed during the week of September 11, 2017.
V. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily by 2:00 p.m. during
the inspection to each team member).
If you have questions regarding the information requested, please contact the lead inspector.