UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

June 20, 2017

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION

(PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION

PROGRAM INSPECTION REPORT 05000263/2017009

Dear Mr. Gardner:

On September 18, 2017, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial

Baseline Design Bases Assurance Inspection (Program) at the Monticello Nuclear Generating

Plant. This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21N, Attachment 1.

The Design Bases Assurance Inspection will focus on the implementation of the Electrical

Equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified

status of equipment during the life of the plant. The EQ components to be reviewed during this

baseline inspection will be identified during the in-office preparation week that occurs prior to the

onsite inspection week.

The inspection will include a bagman trip to support selection of components and 2 weeks of

onsite inspection. The inspection team will consist of three NRC inspectors. The current

inspection schedule is as follows:

Bagman trip onsite week: August 21, 2017

Preparation week: September 11-15, 2017

Onsite inspection weeks: September 18-22, 2017; and

October 2-6, 2017.

P. Gardner -2-

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than July 31, 2017.

Prior to the bagman trip, on August 10, 2017, the lead inspector will communicate the

initial selected set of approximately 12 EQ components.

The second group of documents requested is those items needed to support the

bagman trip. This set of documents should be available to the lead inspector onsite on

August 21, 2017.

The third group of documents requested is those items needed to support our in-office

preparation activities for the selected set of 6-9 EQ components. This set of documents

should be provided to the lead inspector at the Regional Office no later than September

4, 2017. During the in-office preparation activities, the team may identify additional

information needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team onsite on

September 18, 2017. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the lead inspector as the

documents are generated.

The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing

contact for this inspection is Mr. Andrew Kouba of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

P. Gardner -3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Benny Jose, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

Enclosure:

Design Bases Assurance Inspection

EQ Program Document Request

cc: Distribution via LISTSERV

P. Gardner -4-

Letter to Peter A. Gardner from Benny Jose dated June 20, 2017

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION

(PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION

PROGRAM INSPECTION REPORT 05000263/2017009

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17171A304

OFFICE RIII RIII RIII RIII

NAME BJose

DATE 06/20/17

OFFICIAL RECORD COPY

DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM DOCUMENT REQUEST

Inspection Report: 05000263/2017009

Bagman Dates: August 21, 2017

Inspection Dates: September 18-22, 2017, and October 2-6, 2017

Inspection Procedure: IP 71111.21N, Design Bases Assurance Inspection (Program),

Attachment 1, Environmental Qualification (EQ) under 10 CFR

50.49 Programs, Processes, and Procedures

Lead Inspector: Benny Jose, Senior Reactor Engineer, DRS

630-829-9756

Benny.Jose@nrc.gov

I. Information Requested Prior to the Onsite Information Gathering/Bagman Week

The following information is requested by July 31, 2017, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain

descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information

in lists should contain enough information to be easily understood by someone who

has knowledge of light water reactor technology).

1. Risk-ranking of top 250 components required to meet Environmental Qualifications

(EQ) from your site specific Probabilistic Safety Analysis sorted by Fussell Vesely

Importance.

2. Probabilistic Safety Analysis listing of top ten risk significant systems.

3. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated with

EQ.

4. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,

and Technical Specifications Bases. Specifically identify which Updated Final Safety

Analysis Report sections address EQ (including seismic).

5. Identify the various EQ standards (including year, edition, or revision) that the station

is committed to.

6. Site (and corporate if applicable) procedures associated with the Title 10, Code of

Federal Regulations, Part 50.49, EQ Program for electrical components. Include

procedures for procurement of qualified equipment, maintenance of qualified

equipment, modification to qualified equipment (including Equivalency or Commercial

Grade Dedication (CGD) programs), and material storage and shelf life controls.

7. Copy of EQ Design Basis Document, if applicable.

Enclosure

8. Copy of any open licensing commitments related to EQ, if applicable.

9. Equipment Qualification Master List. Specific issues to be identified include:

safety classification (safety-related or nonsafety-related), Regulatory Guide 1.97

instrumentation, EQ qualification (e.g., DOR, NUREG 588, 50.49), original or

replaced after implementation of 50.49, and plant location.

10. List of any installed equipment removed from the Equipment Qualification Master List

and basis for removal.

11. List of EQ solenoid valves that are normally continuously energized.

12. List or drawings of plant areas that are subjected to EQ, identifying design (limiting)

temperature, both normal and accident, high energy line break, radiation levels, etc.

that the associated equipment will have to be qualified to meet EQ. If unit has

obtained a power uprate (greater than 5 percent) provide same information pre-

update (earliest available if multiple uprates).

13. List of CGD evaluations performed, for which the dedicated parts have been issued

for installation (parts issued for the last 10 years) on EQ applications in the plant.

Include CGD evaluation number, name of part, component ID or description of the

component the part was issued to repair, work order, and date issued or installed.

14. List of Corrective Action Documents related to the EQ Program or EQ of specific

components for the last 5 years.

15. Current management and engineering organizational chart.

II. Information Requested (for the approximate 9-12 selected components) to be

Available by the Bagman Trip on August 21, 2017.

1. EQ summary report for each component/subcomponent.

2. Qualification Maintenance Requirement Sheet or equivalent.

3. List of corrective action documents associated with each of the selected components

for the last 5 years.

4. Photos of any component in containment or high radiation areas, if available.

III. Information Requested (for the approximate 6-9 selected components) to be

Available by September 4, 2017, (will be reviewed by the team in the Regional

office during the week of September 11, 2017).

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes EQ files,

Qualification Test Reports, calculations, corrective action documents, maintenance

history, etc.).

1. EQ file, including associated Qualification Test Reports.

2. Vendor manual (electronic copy or availability of hard copy during inspection).

2

3. Preventive maintenance template.

4. Last performed work order (WO) for each associated EQ preventive maintenance.

5. List of corrective maintenance WOs for the last 10 years. Include WO number, date

performed, and brief one line description.

6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide

copy of the purchase order.

7. Thermal life calculation.

8. Any self-assessments of the EQ program in the last 3 years.

IV. Additional Information to be Provided on September 18, 2017, Onsite

1. During the in-office preparation activities, the team may identify additional

information needed to support the inspection. The lead inspector will provide a

list of the additional information needed during the week of September 11, 2017.

V. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily by 2:00 p.m. during

the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

3