E-Mail Dated February 12, 2008, from Einar Ronningen, Sacramento Municipal Utility District, to John Hickman, NRC, Regarding Ranch Seco Final Status Survey Report 1
ML080650558
Person / Time
Site: Rancho Seco
Issue date: 02/12/2008
From: Ronningen E
Sacramento Municipal Utility District (SMUD)
To: John Hickman
NRC/FSME
References
Download: ML080650558 (6)


Text

Final Status Surveys Pagel1 of 2 John Hickman - Final Status Surveys From: "Einar Ronningen" <ERonnin@smud.org>

To: <jbh@nrc.gov>

Date: 02/12/2008 8:09 PM

Subject:

Final Status Surveys CC: "Emilio Garcia" <EMG@nrc.gov>, "Robert E. Jones" <RJones2@smud.org>

John, You asked some time ago for some additional information for Tom Youngblood. I had put together the information, but I think Christmas happened, and it never got sent to you. I am sorry for the delay.

The questions were about the sample data and calculations to support the gross activity DCGLs.

The calculations are contained in the technical basis documents as highlighted, in the attached document indicating what has been submitted. If you need another copy of any of the DTBD's I will be happy to get that to you. Just let us know if you want it hard-copy or e-mailed to you.

The detailed sample data resides on site. We have collected the characterization data that was analyzed offsite into a DTBD, but it is quite large and contains hard-copies of the vendor data and is not easily submitted electronically. I would suggest onsite review of this information.

During the last ORISE site visit, there was some discussion on Mr. Youngblood making a site visit coinciding with the next ORISE site visit. Perhaps during that visit, I can have someone go over sample data and sample results with Tom. Any insight into what Tom would like to review would help us prepare better to make his visit as productive as possible.

Do you have any plans at this point for Tom to make a site visit in the near future?

Also, we will be submitting the next set of packages soon, probably next week. You had asked about tracking the actual dose impacts of the survey units, and we are keeping a running spreadsheet. Would you like to see a current copy? I believe the concerns to be focused on soil activity levels, and we have not submitted any land areas yet, nor will we in the second submittal.

Regarding the first submittal: any feedback is welcome, we do want your reviews to be as painless as possible. I am reviewing each of the packages before they go out, so I know "painless" is a relative term!

Again, my apologies for the delay. Please let Bob or myself know if you need any further information.

Regards, Einar Einar T. Ronningen Dismantlement Superintendent - Radiological Rancho Seco Decommissioning Project Voice: 916.732.4817 Cell: 209.217.6785 file://C:\temp\GW } 00001.HTM 03/04/2008

Final Status Surveys Page 2 of 2 Fax: 916.732.6095 eronnin@smud.org

<<DTBDs Submitted to the NRC.doc>>

file://C:\temp\GW}00001.HTM 03/04/2008

1,'):ý.ýte iý4p-\GW-

-160-6-0 lf -T-M-P" page, I'c:\tem&GWIOQOO1 .TMP Paae 1~

Mail Envelope Properties (47B2434C.171 : 21 : 33137)

Subject:

Final Status Surveys Creation Date 02/12/2008 8:09:15 PM From: "Einar Ronningen" <ERonnin(asmud.org>

Created By: ERonnin(ismud.org Recipients nrc.gov OWGWPOO4.HQGWDOO1 JBH (John Hickman) nrc.gov ARL PO.ARL DO EMG CC (Emilio Garcia) smud.org RJones2 CC (Robert E. Jones)

Post Office Route OWGWPOO4.HQGWDOO1 nrc.gov ARLPO.ARLDO nrc.gov smud.org Files Size Date & Time MESSAGE 2262 02/12/2008 8:09:15 PM TEXT.htm 7826 DTBDs Submitted to the NRC.doc 35328 Mime.822 61873 Options Expiration Date: None Priority: , Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail

Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

DTBDs Submitted to the NRC

1. DTBD-05-010 "Beta Detection Including Beta Energy and Source Efficiency"
2. DTB-605-014 "RSNGS' Surface"Soil Nuc-ide Fractions -and'DCGLs'"
3. DTIBD-05-015 "Rancho Seco Nuclear Generating Station Structure Nuclide Fraction and DCGLs"
4. DTBD-06-001 "RSNGS Initial Classification of Survey Areas and Survey Design Sigma Values"
5. DTBD-06-002 "Use of a Survey Unit Size of 219 m2 for Class 1 Structure. Surveys at RSNGS"
6. DTBD-05-013 "Buried Piping Scenario and DCGL Determination Basis"
7. DTBD-06-003 "Use of In Situ Gamma Spectroscopy for Final Status Surveys"
8. DTBD-05-009 "Embedded Piping Scenario and-IDCGL Determination Basis",
9. DTBD-04-005 "DCGLs for RSNGS Industrial Area Surface Soils"
10. DTBD-05-004 "Applicability of Surface Soil DCGLs to Subsurface Soil Contamination,"
11. DTBD-04-004 "DCGLs for RSNGS Structural Surfaces" (Revisions 0 and 1)
12. DTBD-05-005 "DCGLs for RSNGS Activated and Volumetrically Contaminated Bulk Materials"
13. DTBD-05-007 "Containment Building DCGLs"
14. DTBD-05-012 "Eberline SPA-3 and Ludlum 44-10 Detector Sensitivity (MDC)"
15. DTBD-05-013 "Buried Piping Scenario and DCGL Determination Basis"
16. DTBD-05-01 0 "Beta Detection During Rancho Seco Nuclear Generating Station Characterization or Final Status Surveys (Including Beta Energies and Source Efficiency, Es)"
17. DTBD-05-003 "Soil and Structural Surface Area Factors for use at RSNGS"
18. DTBD-05-001 "Comparison of Dose Impacts from Alternative Exposure Scenarios,"

1

19. DTBD-06-003 "Use of In Situ Gamma Spectroscopy for Final Status Survey" Other Submittals
20. Historical Site Assessment (HSA), Revisions 0 and 1
21. Rancho Seco Non-Industrial Area Survey Project Final Report, Revision 2 (Volume I and Volume II)
22. Groundwater Monitoring Report
23. "Supplement to Rancho Seco Environmental Report - Post Operating License Stage,"

1991.

24. Biological surveys performed on the site including the 1994 survey that was part of the Master Plan for development of Rancho Seco Park and the biological survey conducted in support of the Cosumnes Power Plant.
25. Cultural resources survey performed in support of the Cosumnes Power Plant.
26. NPDES Permit including the renewal application.
27. Our contract with the U.S. Bureau of Reclamation
28. SMUD calculation ERPT-C0104 "Geotechnical Investigation for Proposed Evaporation Ponds"
29. Hydrogeological Characterization Report, Revisionl
30. Final Status Survey (FSS) Report for several survey units 2