Letter Sequence Other |
---|
|
|
MONTHYEARML0816305582008-06-11011 June 2008 Supplement to License Amendment Request Related to Proposed Changes to Emergency Diesel Generator Fuel Oil Requirements Project stage: Supplement ML0816400542008-06-13013 June 2008 Individual Notice of Consideration of Issuance of Amendment Regarding Proposed Increase in Emergency Diesel Generator Day Tank Minimum Fuel Project stage: Other ML0816306052008-06-13013 June 2008 Individual Notice of Consideration of Issuance of Amendment Regarding Proposed Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume Project stage: Other ML0821207262008-08-27027 August 2008 Tech Spec Pages for Amendment 193 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume Project stage: Other ML0821207182008-08-27027 August 2008 Issuance of Amendments 193 & 154 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume Project stage: Approval 2008-06-13
[Table View] |
|
---|
Category:Technical Specification
MONTHYEARML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23103A3342023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases ML22105A0422022-04-13013 April 2022 Submittal of Changes to Technical Specifications Bases ML22055A6012022-02-24024 February 2022 License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML21048A3242021-02-17017 February 2021 License Amendment Request for Application to Revise Technical Specifications to Adopt TSTF-205 -A Revision of Calibration, Channel Functional Test, and Related Definitions ML20273A2152020-09-29029 September 2020 License Amendment Request: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML20111A1772020-04-13013 April 2020 Submittal of Changes to Technical Specifications Bases ML20078G3072020-03-18018 March 2020 License Amendment Request for Proposed Changes to Technical Specifications 3.10.8 Inservice Leak and Hydrostatic Testing JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19106A1602019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases ML19036A9132019-02-28028 February 2019 Issuance of Amendment Nos. 234 and 197 Adopt TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers ML18347B3662018-12-13013 December 2018 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b ML18235A1092018-08-23023 August 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers ML18108A1772018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases ML17109A0702017-04-13013 April 2017 Submittal of Changes to Technical Specifications Bases ML15323A2572015-11-19019 November 2015 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML15223B3232015-08-11011 August 2015 Submit License Amendment Request - Supplement Proposed Changes to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML15119A5172015-04-14014 April 2015 Submittal of Changes to Technical Specifications Bases ML15043A6492015-02-12012 February 2015 Exigent License Amendment Request - Extension of Implementation Period for License Amendment No. 174, Leak Detection System Technical Specification Setpoint, Allowable Value and Design Basis Changes ML14112A4742014-04-10010 April 2014 Enclosure 2: Bases ML14112A4722014-04-10010 April 2014 Enclosure 1: Bases ML13119A5772013-04-10010 April 2013 Limerick Generating Station, Units 1 & 2, Submittal of Changes to Technical Specifications Bases ML12117A2242012-04-12012 April 2012 Limerick, Units 1 and 2, Submittal of Changes to Technical Specifications Bases ML1128700802011-10-12012 October 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1117100072011-06-14014 June 2011 License Amendment Request to Include an Alternate Method of Verifying Drywell Unidentified Leakage ML1116505632011-06-14014 June 2011 License Amendment Request to Include Alternate Method of Verifying Drywell Unidentified Leakage ML11126A2892011-04-15015 April 2011 Limerick Generating Station, Units 1 and 2, Regarding Submittal of Changes to Technical Specifications Bases ML1109700662011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1011706972010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases ML1011706982010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases ML1008503982010-03-25025 March 2010 Markup of Proposed Technical Requirements Manual & Technical Specifications Bases Pages ML0912800592009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0912800572009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0905703782009-02-25025 February 2009 License Amendment Request - Removal of Technical Specification 3/4.4.8 Concerning Structural Integrity Requirements ML0821207262008-08-27027 August 2008 Tech Spec Pages for Amendment 193 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0717802932007-06-27027 June 2007 License Amendment Request, Proposed Changes to Accident Monitoring Instrumentation Technical Specifications ML0713604212007-04-27027 April 2007 Changes to Technical Specifications Bases RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0606703282006-03-0606 March 2006 Tech Specification Pages for License Amendment 184 Removal of License Conditions Concerning Emergency Core Cooling System Pump Suction Strainers ML0605302142006-02-17017 February 2006 Technical Specification Pages Pressure Isolation Valve Table ML0532703942005-11-22022 November 2005 Technical Specification Pages Re Accident Monitoring Instrumentation Surveillance Requirements ML0533303552005-10-10010 October 2005 Supplement to the Request for License Amendment Related to Application of Alternative Source Term, Dated February 27, 2004 ML0527200192005-09-27027 September 2005 Issuance of Amendments Re Relocation of Operability and Surveillance Instrumentation, Technical Specifications ML0510902392005-04-13013 April 2005 Tech Spec Pages for Amendment 173 and 135 Limiting Conditions for Operation and Surveillance Requirements ML0504902692005-02-0404 February 2005 Request for Change to Technical Specifications Traversing In-core Probe (TIP) System ML0501805042005-01-18018 January 2005 Technical Specification Pages ML0434901662004-12-0303 December 2004 Supplement to the Request for License Amendment Related to Proposed Changes to Control Rod Requirements, Dated July 22, 2004 2023-07-31
[Table view] Category:Amendment
MONTHYEARML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML22055A6012022-02-24024 February 2022 License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls ML21048A3242021-02-17017 February 2021 License Amendment Request for Application to Revise Technical Specifications to Adopt TSTF-205 -A Revision of Calibration, Channel Functional Test, and Related Definitions JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML20078G3072020-03-18018 March 2020 License Amendment Request for Proposed Changes to Technical Specifications 3.10.8 Inservice Leak and Hydrostatic Testing RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19036A9132019-02-28028 February 2019 Issuance of Amendment Nos. 234 and 197 Adopt TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers ML18235A1092018-08-23023 August 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers ML15223B3232015-08-11011 August 2015 Submit License Amendment Request - Supplement Proposed Changes to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings ML0905703782009-02-25025 February 2009 License Amendment Request - Removal of Technical Specification 3/4.4.8 Concerning Structural Integrity Requirements ML0821207262008-08-27027 August 2008 Tech Spec Pages for Amendment 193 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume ML0717802932007-06-27027 June 2007 License Amendment Request, Proposed Changes to Accident Monitoring Instrumentation Technical Specifications ML0606703282006-03-0606 March 2006 Tech Specification Pages for License Amendment 184 Removal of License Conditions Concerning Emergency Core Cooling System Pump Suction Strainers ML0605302142006-02-17017 February 2006 Technical Specification Pages Pressure Isolation Valve Table ML0532703942005-11-22022 November 2005 Technical Specification Pages Re Accident Monitoring Instrumentation Surveillance Requirements ML0533303552005-10-10010 October 2005 Supplement to the Request for License Amendment Related to Application of Alternative Source Term, Dated February 27, 2004 ML0527200192005-09-27027 September 2005 Issuance of Amendments Re Relocation of Operability and Surveillance Instrumentation, Technical Specifications ML0510902392005-04-13013 April 2005 Tech Spec Pages for Amendment 173 and 135 Limiting Conditions for Operation and Surveillance Requirements ML0501805042005-01-18018 January 2005 Technical Specification Pages ML0434901662004-12-0303 December 2004 Supplement to the Request for License Amendment Related to Proposed Changes to Control Rod Requirements, Dated July 22, 2004 RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program ML0415404572004-05-20020 May 2004 License Amendment Request, Activation of the Trip Outputs of the Oscillation Power Range Monitor Portion of the Power Range Neutron Monitoring System ML0411202312004-04-20020 April 2004 Technical Specification Pages for Limerick Generating Station, Units 1 and 2, License Amendment, Issuance of Amendment Generic Letter 88-01 Requirements ML0405603662004-02-13013 February 2004 Response to RAI Concerning Safety Limit Minimum Critical Power Ratio (SLMCPR) Change, License Amendment Request: AR A1443067 ML0326708342003-09-0808 September 2003 Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0208101822002-03-20020 March 2002 Technical Specification Pages, Limerick. Unit 1 & 2, Amendment Nos 158 & 120 (TAC Nos MB2271 & MB2272) ML0207204342002-03-12012 March 2002 Technical Specification Pages for Amendment 156, Limerick, Unit 1 2023-07-31
[Table view] |
Text
(3) 'Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess,. and use in amounts as required any byproduct,. source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.
C. This license shall be deemedto contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.1 93, are hereby incorporated into this license.
Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 62, 4-06,434, 447 193
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES A.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the follow.ing A.C. electrical power sources shall be OPERABLE:
- a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E. distribution system, and
- b. Four separate and independent diesel generators, each with:
- 1. A separate day tank containing a minimum of 250 gallons of fuel,
- 2. A separate fuel storage system containing a minimum of 33,500 gallons of fuel, and
- 3. A separate fuel transfer pump.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
- a. With one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.
sources by performing Surveillance Requirement 4.8.1.1.1.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 7 days thereafter. If the diesel generator became inoperable due to any cause other than an inoperable supFr system, an independently testable component, or preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining operable diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 for one diesel generator at a time, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the absence of any potential common-mode failure for the remaining diesel generators is determined. Restore the inoperable.diesel generator'to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. See also ACTION e.
- b. With two diesel generators of the above required A.C. electrical power sources inoperable, demonstrate the*OPERABILITY of the remaining A.C.
sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either of the diesel generators became inoperable due to any cause other than an inoperable support system, an independently testable component, or preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 for one diesel generator at a time, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the absence of any potential common-mode failure for the remaining diesel generators is determined. Restore at least one of the inoperable diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN withi.n the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. See also ACTION e.
LIMERICK - UNIT I 3/4 8-1 Amendment No. -32, 4-, 4,08,193
ELECTRICAL POWER SYSTEMS A.C. SOURCES.- SHUTDOWN
.LI~iT I NG CONDITiQN FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
- a. One circuit between the offsite transmission network and the onsite Class ,1Edistribution system, and
- b. Two diesel generators each with:
- 1. A day fuel tank containing a minimum of 250 gallons of fuel.
- 2. A fuel storage system containing a minimum of 33,500 gallons of fuel.
- 3. A fuel transfer pump.
APPLICABILITY: OPERATIONAL CONDITIONS 4, 5, and
- a. With less than the above required A.C. electrical power sources OPERABLE, suspend CORE ALTERATIONS, handling of irradiated fuel in the secondary containment, operations with a potential for draining the reactor vessel and crane operations over the spent fuel storage pool when fuel assemblies are stored therein. In addition, when.in OPERATIONAL CONDITION 5 with the water level less than 22 feet above the reactor pressure vessel flange, immediately.initiate corrective action to restore *the required power sources to OPERABLE status as soon as practical.
- b. The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS 4.8.1.2 At least the above required A.C. electrical power sources shall be demonstrated OPERABLE per Surveillance Requirements 4.8.1.1.1 and 4.8.1.1.2.
LIMERICK - UNIT I 3/4 8-9 Amendment No. 21,-9-2 193