May 7, 2009 Mr. Jerome Thompson, Interim State Historic Preservation Officer State Historical Society of Iowa 600 East Locust Street Des Moines, IA 50319
SUBJECT:
DUANE ARNOLD ENERGY CENTER LICENSE RENEWAL APPLICATION REVIEW
Dear Mr. Thompson:
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for the Duane Arnold Energy Center (DAEC), which is located near Cedar Rapids, IA. The DAEC is operated by FPL Energy Duane Arnold, LLC. The application for renewal was submitted by FPL Energy Duane Arnold, LLC on September 30, 2008, pursuant to NRC requirements at Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54).
Neither operational, refurbishment, nor major replacement activities are planned as a result of the proposed license renewal action that will impact previously undisturbed land.
The NRC has established that, as part of the staff review of any nuclear power plant license renewal action, a site-specific supplemental environmental impact statement (SEIS) to its Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, will be prepared under the provisions of 10 CFR Part 51, the NRC regulation that implements the National Environmental Policy Act of 1969 (NEPA). In accordance with 36 CFR 800.8, the SEIS will include analyses of potential impacts to historic and cultural resources. A draft SEIS is scheduled for publication in January 29, 2010, and will be provided to you for review and comment.
On June 15, 2009, we plan to conduct an audit of the DAEC site. You and your staff are invited to attend this audit. Your office will also receive a copy of the draft SEIS along with a request for comments. The anticipated publication date for the draft SEIS is January 29, 2010. If you would like to provide any comments regarding the scope of this SEIS, please provide them by June 1, 2009.
J. Thompson If you have any questions, please contact Charles Eccleston, Environmental Project Manager, by phone at 301-415-8537 or by email at Charles.Eccleston@nrc.gov, or Maurice Heath at 301-415-3137 or by e-mail at Maurice.Heath@nrc.gov.
Sincerely,
/RA/
David L. Pelton, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosures:
- 1. Duane Arnold Site Description
- 2. Duane Arnold Site Boundary Map
- 3. Duane Arnold 6-Mile Vicinity Map
- 4. Duane Arnold Transmission System cc w/encls: See next page
J. Thompson If you have any questions, please contact Charles Eccleston, Environmental Project Manager, by phone at 301-415-8537 or by email at Charles.Eccleston@nrc.gov, or Maurice Heath at 301-415-3137 or by e-mail at Maurice.Heath@nrc.gov.
Sincerely,
/RA/
David L. Pelton, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosures:
- 1. Duane Arnold Site Description
- 2. Duane Arnold Site Boundary Map
- 3. Duane Arnold 6-Mile Vicinity Map
- 4. Duane Arnold Transmission System cc w/encls: See next page DISTRIBUTION:
See next page ADAMS Accession Number: ML091210015 OFFICE PM:DLR:RPB1 LA:DLR BC:REB1:DLR NAME C.Eccleston S.Figueroa D.Pelton DATE 05/07/09 05/07/09 05/07/09 OFFICIAL RECORD COPY
Letter to Jerome Thompson from David L. Pelton dated May 7, 2009
SUBJECT:
DUANE ARNOLD ENERGY CENTER LICENSE RENEWAL APPLICATION REVIEW DISTRIBUTION:
HARD COPY:
DLR RF EMAIL:
PUBLIC RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource
M. Heath C. Eccelston M. Baty K. Feintuch
Duane Arnold Energy Center cc:
Mr. Mano Nazar Mr. Mano Nazar Executive Vice President, Nuclear and Chief Senior Vice President Nuclear Officer and Nuclear Chief Operating Officer Florida Power & Light Company Florida Power & Light Company P.O. Box 14000 P.O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408 Mr. M. S. Ross Mr. D. A. Curtland Managing Attorney Plant Manager Florida Power & Light Company Duane Arnold Energy Center P.O. Box 14000 3277 DAEC Road Juno Beach, FL 33408-0420 Palo, IA 52324-9785 Ms. Marjan Mashhadi Abdy Khanpour Senior Attorney Vice President, Engineering Support Florida Power & Light Company Florida Power & Light Company 801 Pennsylvania Avenue, NW P.O. Box 14000 Suite 220 Juno Beach, FL 33408 Washington, DC 20004 Daniel K. McGhee T. O. Jones Iowa Department of Public Health Vice President, Nuclear Operations Bureau of Radiological Health Mid-West Region 321 East 12th Street Florida Power & Light Company Lucas State Office Building, 5th Floor P.O. Box 14000 Des Moines, IA 50319-0075 Juno Beach, FL 33408 Chairman, Linn County Steven R. Catron Board of Supervisors Manager, Regulatory Affairs 930 1st Street SW Duane Arnold Energy Center Cedar Rapids, IA 52404 3277 DAEC Road Palo, IA 52324 Peter Wells, Acting Vice President, Nuclear Training and Performance Improvement U.S. Nuclear Regulatory Commission Florida Power & Light Company Resident Inspector=s Office P.O. Box 14000 Rural Route #1 Juno Beach, FL 33408-0420 Palo, IA 52324 Mark E. Warner Vice President, Nuclear Plant Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
Duane Arnold Energy Center cc:
Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
Duane Arnold Energy Center Site Description SITE DESCRIPTION The Duane Arnold Energy Center (DAEC) site is located on the western side of a north-south reach of the Cedar River, approximately 2.5 miles north-northeast of the Village of Palo, Iowa, in Linn County (T-84N, R-8W, Sections 9 and 10). The closest city is Cedar Rapids with its outer boundary being 8 miles to the southeast. The site is approximately 500 acres in size, on a flat strip of land running northeast and parallel to the Cedar River. The distance from the plant stack to the nearest site boundary is approximately 440 meters (m). A paved county highway provides access to the site.
TOPOGRAPHY A relatively flat plain approximate 750 feet (ft) above mean sea level (msl) extends from the site toward the village of Palo on the southwest, and most of this land is now being farmed. At Palo, the elevation is 747 to 750 ft. Across the river from the site, the land rises from an elevation of 750 ft to an elevation of about 900 ft within a horizontal distance of approximately 2000 ft. These slopes are rather heavily wooded with only an occasional field or pasture dotting the landscape. Beyond this rise, the land is gently rolling farmland. To the northwest, the land rises to an elevation of 850 ft. Adjacent to the east is another heavily wooded low area that constitutes the current flood plain. This area is flat and extends approximately 1500 ft to the west bank of the river. The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. In many places, these broad valleys merge almost imperceptibly into the adjacent uplands. Away from the immediate vicinity of the river, the land is gently rolling farmland.
TRANSMISSION LINE CORRIDORS Five transmission-line systems extend westward in a 665-ft wide corridor from the southwest edge of the plant site for a distance of one mile to a north-south county road.
Near this road, two 161-kV lines depart and continue within a 100-ft basic width corridor (generally narrower along railroad and public right-of way) in a southerly direction. At the village of Palo, one of these lines follows a railroad right-of-way in a southeasterly direction to the Sixth Street substation in Cedar Rapids. The total distance of this line is 11.2 miles. The other 161-kV line continues in a southerly direction west of Cedar Rapids and then eastward, via Fairfax, to the Bertram substation. The total distance is 28 miles. The remaining 161-kV line and two 345-kV lines continue along a 500-ft wide corridor for a distance of 1.7 miles beyond the county road in a westerly direction. There, one 345 line turns south to the Hills substation, the other 345 line turns north to the Hazelton substation. The 161-kV line continues for a distance of 16 miles to the Garrison substation and then an additional 30 miles to the Washburn substation. A sixth transmission line leaves the plant site in a generally easterly direction, crosses the Cedar River, and continues for a distance of 8 miles to the Hiawatha substation.
ENCLOSURE 1
Duane Arnold Site Boundary Map ENCLOSURE 2
Duane Arnold Site 6-Mile Vicinity Map ENCLOSURE 3
Duane Arnold Transmission System ENCLOSURE 4