Category:Legal-Exhibit
MONTHYEARML1028710192010-09-20020 September 2010 Engineering Change Package 75219, Rev 0; Reactor Building 28 Undated Delamination Repair - Phase 3 Concrete Removal ML1028701992010-09-20020 September 2010 Fm 5.2 Exhibit 1 Petrographic Studies of Concrete for Construction Engineering Consultants ML1028702002010-09-20020 September 2010 5.3 Exhibit 2 Aci 515.1 R - a Guide to the Use of Waterproofing, Damp-proofing, Protective, and Decorative Barrier Systems for Concrete ML1028702012010-09-20020 September 2010 Fm 5.3 Exhibit 3 Item #101 - Water Purity During Pressure Washing ML1028702082010-09-20020 September 2010 Fm 5.6 Exhibit 4 Evaluation and Acceptance of PSC Tendon Surveillance Results ML1028702122010-09-20020 September 2010 Fm 6.2 Exhibit 2, Crystal River, Unit 3, Design Basis Document, Wire Material ML1028703362010-09-20020 September 2010 Fm 8.3 Exhibit 1, SP-178, Rev 28, Containment Leakage Test-Type a Including Liner Plant ML1028703372010-09-20020 September 2010 Data Request # 108 - Estimated Vacuum Achievable with Purge Fan Event ML1028703382010-09-20020 September 2010 Data Request # 108 - Estimated Vacuum Achievable with Purge Fan, Calculation ML1028703392010-09-20020 September 2010 Fm 9.1 Exhibit 1 FSAR, Containment System & Other Special Structures, Section 052 ML1028703462010-09-20020 September 2010 Fm 9.3 Exhibit 2, FSAR Site & Environment, Ch 2 Selected Pages ML1028708032010-09-20020 September 2010 Request #9 NRC SIT, Question # 3 Information ML1028709052010-09-20020 September 2010 Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 2 of 2 ML1028709082010-09-20020 September 2010 Engineering Change Package 75220, Rev 0; Reactor Building Concrete Placement, Part 1 of 2 ML1028710142010-09-20020 September 2010 Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Page 2 of 30. (636 Pages Information Blocked Out) ML1028710162010-09-20020 September 2010 Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 279 of 364 (636 Pages Information Blocked Out) ML1028710562010-09-20020 September 2010 Engineering Change Package 75218, Rev 0; Reactor Building Delamination Repair - Phase 2 Detensioning Tendons, Pages 157 of 364. (636 Pages Information Blocked Out) ML1028702102009-11-0202 November 2009 Fm 5.8 Exhibit 7 Report of Petrographic Examination, Ctl ML12325A0982002-09-19019 September 2002 Official Exhibit - NRC031-00-BD01 - Letter from B.L. Mozafari, National Marine Fisheries Service (NMFS) to D. Young, Crystal River Unit 3 - Section 7 Consultation Under the Endangered Species Act Regarding Sea Turtles at the . 2010-09-20
[Table view] |
Text
FM 5.3 Exhibit 3 page 1 of 1 Item 101 - Water purity during pressure washing Per discussion with Tommie Sassard (Maintenance/Facilities Supervisor), CR3 does not/has not pressure washed the outside of the reactor building.