12 Draft Outline Comments
ML13099A261
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/10/2012
From: Chris Steely
Operations Branch IV
To:
Entergy Operations
laura hurley
References
Download: ML13099A261 (3)


Text

DRAFT OUTLINE COMMENTS Grand Facility: First Exam Date: 12/7/12 Gulf Written Exam Outline (9/25/12)

Comment Resolution 1 No comments - NRC generated outline 2

3 4

5 Administrative JPM Outline (9/25/12)

Comment Resolution RO - Review of Cooldown Record. Yes 1 Used on 2011 NRC Exam. Was this randomly selected?

2 3

4 5

Control Room / In-Plant System JPM Outline (9/25/12)

Comment Resolution

g. Reactor Manual Scram Switch Test. Yes 1 Used on 2011 NRC Exam. Randomly selected?

Need importance rating annotated on In Fixed 2

Plant, Energize RPS Alternate Feed.

3 4

5 OBDI 202 - IOLE Process

Simulator Scenario Outline Comments (9/25/12)

Comment Resolution Scenario 1, Event 6, 7 - Loss of CCW Revised leading to the reactor scram is ONE 1

Major event. Event 6 and 7 are not both Majors. Revise D-1.

Scenario 2, Event 5 - Any chance the No applicants could scram due to the loss of 2

two IRM channels? If so we should move right before the major.

Scenario 2, Event 7 and 8 - Same Corrected comment as the first scenario. The major event is the scram due to the 3 CRDM malfunction. This is really one event. The CST rupture would be its own event and count as the component failure.

Scenario 2, Event 8 - Is the un-isolable No recirc line break counted as the 4 component malfunction? Do the operators perform any functions to correct even though it is un-isolable?

Scenario 2, Event 9 - What is the major 5 electrical transient and the crew response?

6 Scenario 3, Event 1- Secure the Div. 1 DG - what is the failure?

7 Scenario 3, Event 6 - Loss of EST Corrected transformer cannot count toward Abnormal due to following the Major (1021, App. D, pg. 9) 8 Scenario 3, Event 7 - What is the crew response to ADS valve failure to open?

9 Scenario 4, Event 3 and 4 - Switch Revised these events in case applicants allow the plant to scram.

10 Scenario 4, Event 5 and 6 - CRDM Corrected malfunction leads to ATWS. This is one major. The CR drifts count as the instrument malfunction but the CRDM with ATWS is one event. Reduce major count by one.

11 Scenario 4, Event 8 - Critical Task Defined must be accomplished prior to reaching HCTL. Please define for Examiners. OBDI 202 - IOLE Process

12 Scenario 5, Event 1 - What is the Fixed failure with placing SSW A in Standby?

Event 1 counted as component malfunction.

13 Scenario 5, Event 3 - Any chance No applicants could scram plant because of the failure of two APRM channels?

14 Scenario 5, Event 6 - What is the Fixed component failure? The Fuel cladding leak? Response to scram? If this is so then this whole event is the major and not a component failure as well.

15 Scenario 5, Event 8 - Looks like this Yes and fixed should be a major only. Lets discuss.

General Outline Comments (9/25/12)

Comment Resolution What facility document defines the 1

critical tasks in the scenarios?

ES-301-5 will change based on changes Corrected 2

to scenario comments.

Depending on which scenario is the 3 backup the ES-301-5 could change as well.

ES-301-4 totals will change based on Corrected 4

attribute changes after discussion.

5 OBDI 202 - IOLE Process