ML15048A126

From kanterella
Revision as of 15:32, 31 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Operator Licensing Operator Test and Written Examination Approval - Hope Creek Generating Station
ML15048A126
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/17/2015
From: Brian Fuller, Diane Jackson
Division of Nuclear Materials Safety I
To: Joyce T
Public Service Enterprise Group
Jackson D
Shared Package
ML14254A267 List:
References
Download: ML15048A126 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 February 17, 2015 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL HOPE CREEK GENERATING STATION

Dear Mr. Joyce:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Hope Creek Generating Station.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Robert Boesch, Hope Creek Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, on March 3, 2015. The NRC staff will administer the operating tests during the week of February 23, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Brian Fuller, at 610-337-5077, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-354 License No. NPF-57 cc: Distribution via ListServ

Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL HOPE CREEK GENERATING STATION

Dear Mr. Joyce:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Hope Creek Generating Station.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Robert Boesch, Hope Creek Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, on March 3, 2015. The NRC staff will administer the operating tests during the week of February 23, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Brian Fuller, at 610-337-5077, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-354 License No. NPF-57 cc: Distribution via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\FULLER\Exam 15-HC Feb 23 (U01904)\HC ExamApproval-W-O-Ltr.docx ADAMS PKG: ML: 14254A267 ADAMS ACCESSION NO.: ML15048A126 X SUNSI Review X Non-Sensitive X Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler DEJackson BFuller DATE 02/17/2015 02/17/2015 02/17/2015 OFFICIAL RECORD COPY

T. Joyce 2 Distribution:

D. Dorman, RA (R1ORAMAIL Resource)

D. Lew, DRA (R1ORAMAIL Resource)

H. Nieh, DRP (R1DRPMAIL Resource)

M. Scott, DRP (R1DRPMAIL Resource)

R. Lorson, DRS (R1DRSMail Resource)

J. Trapp, DRS (R1DRSMail Resource)

G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP C. Highley, DRP J. Hawkins, DRP, SRI S. Haney, DRP, RI D. E. Jackson, DRS B. Fuller, Chief Examiner, DRS C. Bixler, DRS C. Ott, DRP, AA K. MorganButler, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource