RS-15-179, Response to NRC Request for Additional Information, Dated May 22, 2015 Regarding License Renewal Application, Environmental Review, Er References to Be Docketed with Links

From kanterella
Revision as of 10:13, 31 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Response to NRC Request for Additional Information, Dated May 22, 2015 Regarding License Renewal Application, Environmental Review, Er References to Be Docketed with Links
ML15195A419
Person / Time
Site: LaSalle  
(NPF-011, NPF-018)
Issue date: 07/02/2015
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15195A351 List: ... further results
References
RS-15-179
Download: ML15195A419 (4)


Text

LaSalle Environmental Audit Response to Request for Additional Information Index #: 058 RAI #: None Category: ER References to be Docketed Statement of Question:

ER References to be Docketed

1. (ComEd 1977) Commonwealth Edison Company. 1977. LaSalle County Station Environmental Report Operating License Stage. Volume 1. May 10, 1977. [Terrestrial resource sections including any applicable tables, figures, and appendices]
2. (Exelon Generation 2013b) Exelon Generation. 2013. LaSalle County Generating Station Wildlife Management Plan.
3. (IEPA 2000) Illinois Environmental Protection Agency. 2000. Federally Enforceable State Operating Permit for LaSalle County Generating Station No. 75040086. December 11, 2000.
4. Fritts, M. W. 2013. RE. Request: Illinois River Reports. Illinois River Biological Station and Illinois Natural History Survey. Havana, Illinois. June 24, 2013.
5. EA Engineering, Science, and Technology, Inc. 2014. LaSalle County Station 2013 Fish and Benthos Monitoring and Historical Fish and Benthos Comparisons. Deerfield, IL.

March 2014.

6. EA Engineering. 2000. Final Report La Salle Station Aquatic Monitoring RM 249.7-249.8. Prepared for ComEd. Chicago, IL.
7. HDR Engineering. 2010. Zebra Mussel Monitoring Program at LaSalle Nuclear Station, 2009. February 2010.
8. HDR Engineering. 2011. Zebra Mussel Monitoring Program at LaSalle Nuclear Station, 2010. February 2011.
9. HDR Engineering. 2012. Zebra Mussel Monitoring Program at LaSalle Nuclear Station, 2011.
10. HDR Engineering. 2013. Zebra Mussel Monitoring Program at LaSalle Nuclear Station, 2012.
11. HDR Engineering. 2014. Zebra Mussel Monitoring Program at LaSalle Nuclear Station, 2013.
12. Exelon Nuclear. 2009. Evaluation 2009-8466, Rev. 0, Final Issue, Task Report 47 -

Environmental Impact Non- Safety Related. LaSalle County Generation Station Units 1 &

2. September 2009.
13. Illinois Department of Public Health. 2014. Marshall Email: to Ranek. RE: LaSalle County Station Units 1 and 2 -- Consultation about thermophilic organisms. February 19, 2014.
14. Illinois Environmental Protection Agency. 2014. Good Email: to Ranek. RE: LaSalle County Station Units 1 and 2 -- Consultation about thermophilic organisms. February 28, 2014.
15. (Kinzer 2013) Kinzer, L. 2013. Kinzer Email: to Connor, Tetra Tech. FW: Levels of Service. LaSalle County Highway Department. May 20, 2013.
16. (Exelon Generation 2013a) Exelon Generation Company, LLC. 2013. Email: FW: Human Resources Issue for Next Week. Email Wood to Ranek, and associated email change.

May 31, 2013.

17. (Tetra Tech 2014) Tetra Tech, Inc. Connor Telecon to Selected government agencies and private social welfare organizations. Compilation of Telephone Logs Investigating 1

Potential Existence of Subsistence-Like Populations in LaSalle and Grundy counties, Illinois. March 13, 2014.

18. Ultimate Heat Sink Fish Mortality and Vegetation Evaluation. EC 390348, Rev. 000.

October 11, 2012.

Response

The following table indicates the manner in which each requested document is being provided.

DOCUMENT RESPONSE

1. (ComEd 1977) Commonwealth Edison The requested excerpts from both Volumes 1 and Company. 1977. LaSalle County Station 2 of the 1977 Environmental Report Operating Environmental Report Operating License Stage. License Stage (ER-OL), are being provided as Volume 1. May 10, 1977. [Terrestrial resource Attachment 1 to this RAI response. Attachment 1 sections including any applicable tables, figures, includes the following excerpts from Vols 1 and 2:

and appendices]

  • ER-OL Table of Contents
  • Vol 1, Sec. 2.2.2, Terrestrial Ecology, pp. 2.2-17 through 2.2-53
  • Vol. 1, Tables 2.2-24 through 2.2-71, pp. 2.2-83 through 2.2-168
  • Vol. 1, Appendixes 2.2A through 2.2D
  • Vol. 2, Sec. 4.1.4, Monitoring Program, pp. 4.1-4 to 4.1-5
  • Vol. 2, Sec. 4.1.4.1, Terrestrial Studies, pp. 4.1-5 to 4.1-6
  • Vol. 2, Sec. 4.2.5, Plans for Wildlife Protection, p. 4.2-2
  • Vol. 2, Sec. 4.5 Construction Impact Control Program, pp. 4.5-1 to 4.5-3
  • Vol. 2, Sec. 6.1.4, Applicants Preoperational Monitoring Program -

Land, pp. 6.1-28 through 6.1-56

  • Vol. 2, Tables 6.1-10 through 6.1-15, pp.6.1-74 through 6.1-79
  • Vol. 2, Figures 6.1-4 through 6.1-7.
2. (Exelon Generation 2013b) Exelon Generation. The requested document is being provided as 2013. LaSalle County Generating Station Wildlife Attachment 2 to this RAI response.

Management Plan.

3. (IEPA 2000) Illinois Environmental Protection The requested document is being provided as Agency. 2000. Federally Enforceable State Attachment 3 to this RAI response.

Operating Permit for LaSalle County Generating Station No. 75040086. December 11, 2000.

4. Fritts, M. W. 2013. RE. Request: Illinois River The requested document is being provided as Reports. Illinois River Biological Station and Illinois Attachment 4 to this RAI response.

Natural History Survey. Havana, Illinois. June 24, 2013.

5. EA Engineering, Science, and Technology, Inc. The requested document is being provided as 2014. LaSalle County Station 2013 Fish and Attachment 5 to this RAI response.

Benthos Monitoring and Historical Fish and Benthos Comparisons. Deerfield, IL. March 2014.

2

6. EA Engineering. 2000. Final Report La Salle The requested document is being provided as Station Aquatic Monitoring RM 249.7-249.8. Attachment 6 to this RAI response.

Prepared for ComEd. Chicago, IL.

7. HDR Engineering. 2010. Zebra Mussel The requested document is being provided as Monitoring Program at LaSalle Nuclear Station, Attachment 7 to this RAI response.

2009. February 2010.

8. HDR Engineering. 2011. Zebra Mussel The requested document is being provided as Monitoring Program at LaSalle Nuclear Station, Attachment 8 to this RAI response.

2010. February 2011.

9. HDR Engineering. 2012. Zebra Mussel The requested document is being provided as Monitoring Program at LaSalle Nuclear Station, Attachment 9 to this RAI response.

2011.

10. HDR Engineering. 2013. Zebra Mussel The requested document is being provided as Monitoring Program at LaSalle Nuclear Station, Attachment 10 to this RAI response.

2012.

11. HDR Engineering. 2014. Zebra Mussel The requested document is being provided as Monitoring Program at LaSalle Nuclear Station, Attachment 11 to this RAI response.

2013.

12. Exelon Nuclear. 2009. Evaluation 2009-8466, The requested document is being provided as Rev. 0, Final Issue, Task Report 47 - Attachment 12 to this RAI response.

Environmental Impact Non- Safety Related.

LaSalle County Generation Station Units 1 & 2.

September 2009.

13. Illinois Department of Public Health. 2014. The requested document is being provided as Marshall Email: to Ranek. RE: LaSalle County Attachment 13 to this RAI response.

Station Units 1 and 2 -- Consultation about thermophilic organisms. February 19, 2014.

14. Illinois Environmental Protection Agency. 2014. The requested document is being provided as Good Email: to Ranek. RE: LaSalle County Station Attachment 14 to this RAI response.

Units 1 and 2 -- Consultation about thermophilic organisms. February 28, 2014.

15. (Kinzer 2013) Kinzer, L. 2013. Kinzer Email: to The requested document is being provided as Connor, Tetra Tech. FW: Levels of Service. Attachment 15 to this RAI response.

LaSalle County Highway Department. May 20, 2013.

16. (Exelon Generation 2013a) Exelon Generation The requested document is being provided as Company, LLC. 2013. Email: FW: Human Attachment 16 to this RAI response.

Resources Issue for Next Week. Email Wood to Ranek, and associated email change. May 31, 2013.

17. (Tetra Tech 2014) Tetra Tech, Inc. Connor The requested document is being provided as Telecon to Selected government agencies and Attachment 17 to this RAI response.

private social welfare organizations. Compilation of Telephone Logs Investigating Potential Existence of Subsistence-Like Populations in LaSalle and Grundy counties, Illinois. March 13, 2014.

18. Ultimate Heat Sink Fish Mortality and The requested document is being provided as Vegetation Evaluation. EC 390348, Rev. 000. Attachment 18 to this RAI response.

October 11, 2012.

3

List of Attachments:

See above response, which lists each document and its attachment number.

4