ML15314A663

From kanterella
Revision as of 04:38, 31 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC-002 - Audrey L. Klett Statement of Professional Qualifications
ML15314A663
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/10/2015
From:
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28504
Download: ML15314A663 (1)


Text

NRC-002 Submitted Nov. 10, 2015 Audrey L. Klett U.S. Nuclear Regulatory Commission Education University of Illinois at Urbana-Champaign Bachelor of Science in Electrical Engineering, December 2002 GPA: 3.6/4.0 Power Engineering Curriculum Nuclear Engineering Elective coursework Work U.S. Nuclear Regulatory Commission, Rockville, MD Experience Project Manager, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

April 2013 - Present.

NRC Project Manager for Turkey Point 3 and 4 since November 2013.

Back-up Project Manager for the St. Lucie 1 and 2 and Robinson plants.

Reactor Operations Engineer, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation.

May 2008 - April 2013.

Program Lead for the Reactor Oversight Process (ROP) Assessment and Performance Indicator Programs and inspection guidance for corrective action programs, safety culture, and construction to operation transition.

Assistant Team Leader for the Fort Calhoun Manual Chapter 0350 inspection.

Reactor Engineer, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation.

September 2009 - December 2009.

Technical Reviewer in the Technical Specifications Branch for license amendments.

Electrical Engineer, Division of Engineering, Office of Nuclear Reactor Regulation.

October 2006 - May 2008.

Technical Reviewer in the Electrical Engineering Branch for license amendments.

NRC representative at the Organization for Economic Cooperation and Development/Nuclear Energy Agency forum on power cable testing and design qualifications.

U.S. Nuclear Regulatory Commission, Region III Office, Lisle, IL.

Reactor Engineering Inspector, Division of Reactor Safety.

January 2003 - October 2006.

Inspector for fire protection, safety system design and performance, modifications, 10 CFR 50.59 change process, and corrective action programs.

Resident Inspector rotation at the Point Beach Nuclear Plant from August 2004 to November 2004.

Graduate of the NRCs Nuclear Safety Professional Development Program.

NRC-002 Submitted Nov. 10, 2015 Audrey L. Klett U.S. Nuclear Regulatory Commission Education University of Illinois at Urbana-Champaign Bachelor of Science in Electrical Engineering, December 2002 GPA: 3.6/4.0 Power Engineering Curriculum Nuclear Engineering Elective coursework Work U.S. Nuclear Regulatory Commission, Rockville, MD Experience Project Manager, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

April 2013 - Present.

NRC Project Manager for Turkey Point 3 and 4 since November 2013.

Back-up Project Manager for the St. Lucie 1 and 2 and Robinson plants.

Reactor Operations Engineer, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation.

May 2008 - April 2013.

Program Lead for the Reactor Oversight Process (ROP) Assessment and Performance Indicator Programs and inspection guidance for corrective action programs, safety culture, and construction to operation transition.

Assistant Team Leader for the Fort Calhoun Manual Chapter 0350 inspection.

Reactor Engineer, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation.

September 2009 - December 2009.

Technical Reviewer in the Technical Specifications Branch for license amendments.

Electrical Engineer, Division of Engineering, Office of Nuclear Reactor Regulation.

October 2006 - May 2008.

Technical Reviewer in the Electrical Engineering Branch for license amendments.

NRC representative at the Organization for Economic Cooperation and Development/Nuclear Energy Agency forum on power cable testing and design qualifications.

U.S. Nuclear Regulatory Commission, Region III Office, Lisle, IL.

Reactor Engineering Inspector, Division of Reactor Safety.

January 2003 - October 2006.

Inspector for fire protection, safety system design and performance, modifications, 10 CFR 50.59 change process, and corrective action programs.

Resident Inspector rotation at the Point Beach Nuclear Plant from August 2004 to November 2004.

Graduate of the NRCs Nuclear Safety Professional Development Program.