M170124, (Vnc) Organization Change

From kanterella
Revision as of 03:44, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
(Vnc) Organization Change
ML17129A457
Person / Time
Site: Vallecitos Nuclear Center, 07000754, 07001220, Vallecitos
Issue date: 05/09/2017
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
M170124
Download: ML17129A457 (1)


Text

GE Hitachi Nuclear Energy HITACHI Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA M170124 T (9 10) 819-5950 Scott.murray @ge.com May 9, 2017 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington , DC 20555-0001

Subject:

Vallecitos Nuclear Center (VNC) Organization Change

References:

1- License R-33, Docket 50-73 (NTR) 2- License TR-1, Docket 50-70 (G ETR) 3- License DR-1 0, Docket 50-183 (EVESR) 4- License DPR-1, Docket 50-18 (VBWR) 5- SNM 960, Docket 70-754 6- SNM 1270, Docket 70-1220 Pursuant to the Technical Specifications requirements of Reference 1, this 30-day report is being provided regarding a personnel change for the Vice President Reactor Facility Safety and Security forGE-Hitachi Nuclear Energy Americas, LLC. Specifically, License R-33 Docket 50-73 Technical Specification (6.6 .2.b} requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective April 10, 2017 Ms. Bobbie Lockwood was appointed as the Manager, Services Operations and Vice President Reactor Facility Safety and Security forGE-Hitachi Nuclear Energy Americas, LLC replacing Ms. Emily Martin. Ms. Lockwood is a US Citizen.

References 2 through 6 do not contain specific reporting requirements of this nature, but are listed here for completeness.

If you have any questions in the above matters, please contact me at 910-819-5950.

s]~ IIJ Scott rx:;-z(

Facility t~

Licensi~~~~~

Commitments: None cc: Jack Parrott- NRC, NMSS Project Manager Duane Hardesty- NRC, NRR Project Manager Osiris Siurano- NRC, NMSS Project Manager SPM 17-019