Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
ML17309A794
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/02/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B236 List:
References
L-95-220, NUDOCS 9508100176
Download: ML17309A794 (4)


Text

PRIORITY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508100176 DOC.DATE: 95/08/02 NOTARIZED: NO DOCKET g FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 P AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards suppl to ISI plan second ten-yr interval revised stress & fracture mechanics evaluations pressurizer TITLE:

NOTES:

OR instrument nozzles.

DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR Submittal: Inservice/Testing/Relief from j ENCL j SIZE:2+ ~ i ASME Code GL-89-04 0

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: C 6 0 AEOD/SPD/RAB 1 1 ZKE CEN ER ED0- 1 1 NRR/DE/EMCB 1" 1 MEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 LITCO RANSOME,C 1 1 NOAC 1 1 NRC PDR 1 1 D 0,

N NOTETO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 13

1 0

P.O. Box 128, Ft. Pierce, FL 34954-0120 August 2, 1995 L-95-220 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL) provided a response to your June 9, 1995 request for additional information (RAI). The information was submitted to support the Staff's review of the 'PL evaluation of flaw indications and subsequent in-service inspection (ISI) plans submitted by FPL letter L-95-74 on March 2, 1995. FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.

In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI. Attachments A and B are the revised evaluations you requested. Please contact us should you need any additional clarifications.

Very truly yours, D. A. ager Vice esident St. L ie Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 080095 9508100i7b 95080205000389 PDR ADOCK 9 PDR an FPL Group company

NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O. Box 14000 JUNo BEAcH, FioRIDA 33408 St. Lucie Nuclear Power Plant Unit 2 ATTACHMENTA FRACTURE MECHANICS EVALUATION OF ST. LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VYNUCLEAR SERVICE COMPANY For St. Lucie Nuclear Power Plant 10 Miles South of Ft. Pierce on A1A Ft. Pierce, Florida 33034 Commercial Service Date: August 8, 1983 NRC Docket Number: 50-389 Document Number: 32-1235128-02 Revision Number: 2 Date: July 11, 1995 08/02/95.... 9508100176