ML17331B043

From kanterella
Revision as of 13:06, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Dec 1992 for DC Cook Unit 2
ML17331B043
Person / Time
Site: Cook 
Issue date: 12/31/1992
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B040 List:
References
NUDOCS 9311150322
Download: ML17331B043 (2)


Text

N.R.C. OPERATING DATA REPORT'OCKET NO. 50-316 DATE 02/Nov/93

,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D. C. Cook Unit 2
2. Reporting Period December 92 notes
3. Licensed Thermal Power (MWt) 3411 Rev. 1 Corrected
4. Name Plate Rating (Gross MWe) 1133 UCFs to use MDC=1060
5. Design Electrical Rating (Net MWe) 1090 MWe Net year round.
6. Maximum Dependable Capacity (GROSS MWe) 1100 02/Nov/93 DG Turner
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons See notes above. No longer using seasonall ad'usted values.
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any Any:

(Net MWe)

This Mo. Yr. to Date ll. Hours in Reporting Period

12. No. of Hrs. Reactor Was Critical 744.0 8785.0 Cumm e 131497.0 863'57.5 744.0 3169.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 300.7 1716.3 83316.4
15. Unit .Reserve Shutdown Hours 0.0 . 0' 0.0
16. Gross Therm. Energy Gen. (MWH) 862331 4893139 257587772
17. Gross Elect. Energy Ge'n. (MWH) 256060 1485880 83754030
18. Net Elect:. Energy Gen. (MWH) 245846 1427300 80672172 19; Unit Service Factor 40.4 19 ' 64 '
20. Unit Availability Factor 40.4 19 ' 64 '
21. Unit. Capacity Factor (MDC Net) 31 2 15.3 58.9
22. Unit Capacity Factor '(DER Net) 30.3 14 ' 57 '
23. Unit Forced Outage Rate 59 ' 69.7 "16.4
24. Shutdowns Scheduled over Next Six Months (Type, Date,'and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 931118O~>~ 93 PDR'DOC, ,PDR R

0 h '>

~

'E