ML17331B043

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Dec 1992 for DC Cook Unit 2
ML17331B043
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1992
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B040 List:
References
NUDOCS 9311150322
Download: ML17331B043 (2)


Text

N.R.C.

OPERATING DATA REPORT'OCKET NO.

50-316 DATE 02/Nov/93

,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 2

2. Reporting Period December 92
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes Rev.

1 Corrected UCFs to use MDC=1060 MWe Net year round.

02/Nov/93 DG Turner

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons See notes above.

No longer using seasonall ad'usted values.

9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

ll. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit.Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Ge'n.

(MWH)

18. Net Elect:. Energy Gen.

(MWH) 19; Unit Service Factor

20. Unit Availability Factor
21. Unit. Capacity Factor (MDC Net)
22. Unit Capacity Factor

'(DER Net)

23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo.

Yr.

744.0 744.0 0.0 300.7 0.0 862331 256060 245846 40.4 40.4 31 2

30.3 59 '

Months (Type, to Date 8785.0 3169.4 0.0 1716.3 0 '

4893139 1485880 1427300 19 '

19 '

15.3 14 '

69.7 Date,'and Cumm e 131497.0 863'57.5 0.0 83316.4 0.0 257587772 83754030 80672172 64 '

64 '

58.9 57 '

"16.4 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 931118O~>~ 93 PDR'DOC,

,PDR R

0 h

~

'E