ML17331B041

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1993 for DC Cook Unit 2
ML17331B041
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/31/1993
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B040 List:
References
NUDOCS 9311150318
Download: ML17331B041 (8)


Text

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 02/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period OCT 1993 3; Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes Corrected YTD & Cumm.

UCFs to use MDC=1060 MWe Net. Retro.

07/91 02/Nov/93 DG Turner 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons See notes above.

No ion er usin seasonally adjusted values.

11. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect. Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 745.0 7296.0 745 '

7027.5 0 '

0.0 745 '

6995.5 0 ~ 0 0.0 1909568 20737181 597060 6648980 570256 6401013 100.0 95.9 100.0 95.9 72.2 82.8 70 '

0 80.5 0.0 4.1 Months (Type, Date, and Cumm o 138792.0 93385. 0 0 '

90311.9 0 '

278324953 90403010 87073185 66 '

66 '

60.1 58.6 15 '

Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 9311150318 931105'DR ADQCK"~05000316,,

R PDR

1 P

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 02/Nov/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL OCT 1993 DAY AVERAGE DAIL POWER LEVEL 10/01/93 10/02/93 10/03/93 10/04/93 10/05/93 10/06/93 10/07/93 10/08/93 10/09/93 10/10/93 10/11/93 10/12/93 10/13/93 10/14/93 10/15/93 10/16/93 752 751 754 763 763 766 761 754 765 768 754 759 754 753 754 770 10/17/93 10/18/93 10/19/93 10/20/93 10/21/93 10/22/93 10/23/93 10/24/93 10/25/93 10/26/93 10/27/93 10/28/93 10/29/93 10/30/93 10/31/93 775 772 774 773 777 778 769 778 777 775 775 774 770 774 779

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1993 UNIT NAME:

DATE:

COMPLETED BY$

TELEPHONE:

'AGE 1 OF 1

D. C.

COOK UNIT 2.o Nov, 4, 1993 R. D. Reynnells (616) 465-5901 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE HOURS REASON REACTOR REPORT NO.

CODE~

CODE~

TO PREVENT RECURRENCE None There were no unit shutdown or significant power reductions fro 75%

RTP this month.

1 F:

$ ~

Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

Hs Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic'cram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File

=

(NUREG 1061) 5Exhibit I:

Same Source

I

DOCKET O.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-316 D.C.

Cook Unit 2 R.

D. Reynnells (616) 465-5901 Nov 4, 1993 Page 1 of 1 HIGHLIGHTS MONTHLY OPERATING ACTIVITIES OCTOBER 1993 The unit entered the reporting period in Mode 1 at 754 RTP.

The unit exited this reporting period=in Mode 1 at 754 RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of October was, 597,060 MWH.

DETAILS None

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE PAGE 50-316 D.C.

Cook Unit 2 M. E.

Russo (616) 465-5901 November 5, 1993 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE October 1993 No major safety-related maintenance items are included for the month of October.

C

0 Ir