ML17331B042

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Dec 1991 for DC Cook Unit 2
ML17331B042
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1991
From: Zygmont C
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B040 List:
References
NUDOCS 9311150320
Download: ML17331B042 (1)


Text

N-R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 02/Nov/93 COMPLETED BY CB ZYGMONT TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period DEC.91
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes Rev.

1 Corrected UCFs to use MDC=1060 MWe Net year round.

02/Nov/93 DG Turner

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons See notes above.

No ion er usin seasonall adusted values.

9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22

'3.

24.

Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm.

Energy Gen.

(MWH)

Gross Elect.

Energy Gen.

(MWH)

Net Elect.

Energy Gen.

(MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Shutdowns Scheduled over Next Six This Mo.

Yr. to Date

. 744.0 8760.0 744.0 8053.2 0 ~ 0 0.0 744.0 8014.2 0 ~ 0 0.0 2474282 26527580 796890

'8481310 770380 8185905 100.0 91.5 100. 0 91.5 97 '

88 '

95.0 85.3 0 '

8 '

Months (Type, Date,and Cumm.

122712 '

83188 '0.0 81600.1 0 '

252694633 82268150 79244872 67.8 67.8 62.1 60.4 13 F 1 Duration):

25-If Shut Down At En of Report Period, Estimated Date of Startup:

26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

'9311150320 931105 PDR ADOCK"'050003ih

'R 'DR