ML18262A375

From kanterella
Revision as of 15:30, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
September 20, 2018 ROP Monthly Public Meeting NEI Presentation on ROP Enhancement
ML18262A375
Person / Time
Site: Nuclear Energy Institute
Issue date: 09/20/2018
From:
Nuclear Energy Institute
To:
Office of Nuclear Reactor Regulation
Garmoe A
References
Download: ML18262A375 (8)


Text

Reactor Oversight Process Enhancement September 20, 2018 1

Overview

  • Four Areas Discussed
  • Baseline Inspection Program
  • Action Matrix
  • Response to Inspection Issues
  • Next Steps 2

This proposal

  • Pulls together and integrates recommendations from a variety of sources
  • Acknowledges that some of the recommendations are already being worked (e.g., the Engineering Inspections improvement project; the EP SDP assessment)
  • Invites further dialogue with NRC these ideas and others to improve the ROP after 18 years of experience 3

Baseline Inspection Program This is an explanation of the main idea 4

Action Matrix This is an explanation of the main idea 5

Significance Determination Process This is an explanation of the main idea 6

Response to Inspection Issues This is an explanation of the main idea 7

Next Steps

  • Discuss recommendations in public meetings
  • Assist in prioritizing recommendations
  • Work together to develop a plan for NRC and industry actions on ROP enhancements This is an explanation of the main idea 8